Traffic and Highway Engineering
5th Edition
ISBN: 9781305156241
Author: Garber, Nicholas J.
Publisher: Cengage Learning
expand_more
expand_more
format_list_bulleted
Question
Chapter 15, Problem 22P
To determine
The distance required to transition pavement cross-slope from normal crown cross-slopeon a two-lane highway.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
What super-elevation rate would you recommend for a roadway with a design speed of 110 kph and a radius of 1400 ft? Assume f=0.11.
What is the minimum radius of curvature allowable for a roadway with a 100 kph design speed, assuming that the maximum allowable superelevation rate is 0:12?
SHOW THE CORRECT SOLUTION.
A. 328 m
B. 283 m
C. 832 m
D. 490 m
The road alignment for the construction of a highway passes through a mountainous area. There is therefore the need to embark on a slope stability analysis for the safe and economical design of the slope. Outline the procedure you will go through to achieve this purpose.
Chapter 15 Solutions
Traffic and Highway Engineering
Knowledge Booster
Similar questions
- Highway curve with a radius of 300m is to be super elevated to accomodate a normal speed of 72 kph. Calculate the required super elevation e if the width b of the pavement is 10marrow_forwardA vehicle initially traveling at (75 mile/hr.), skids to a stop taking (170) m to do so. the coefficient of skidding resistance (0.36). What should the grade be for this roadway. (Use t = 2.5 sec.).arrow_forwardA rural collector highway is to be constructed in an area of rolling terrain where the ADT is 950 veh/day. For this situation, determine the following design values: a. Minimum design speed b. Desirable lane width and shoulder width c. Maximum desirable gradearrow_forward
- An existing horizontal curve has a radius of 85 metres which restricts the maximum speed on this section to only 60% of the design speed of the highway. Highway officials want to improve the road to elimintare this bottleneck. Assume coefficient of side friction is 0.15 and rate of superelevation is 8%. Compute the existing speed, design speed and new radius of curvature.arrow_forwardA highway section, +2% , meet -8%at point with 52.0 m( GTs) at speed 120 Km/hr. Determine the elevation of the highest point on the pavement surface within this section.arrow_forwardA curving roadway has a design speed of 80 km/hr. At one horizontal curve, thesuperelevation has been set at 6% and the angle of side fraction is found to be 6o.Determine the impact factor 0.17 is the answer but i don't know how to get it, pls helparrow_forward
- A rural highway has a +6% grade on a mountainous region. If the maximum and minimum the speed limit on this highway for trucks is 70 mph and 45 mph, respectively, determining the “critical length” of this gradearrow_forwardA pavement is to be super-elevated in a certain degree to allow a safe negotiation in acircular curve at a design speed of 60 kph. If the theoretical difference in elevationbetween opposite edges of the pavement is 0.89 meter, what will be the super-elevationin degrees to allow a safe negotiation in a curve?arrow_forwardDetermine the length of tangent runout and lenght of runoff for a two-lane highway if the pavement is revolved about the centreline in order to achieve fully superelevated cross section. Maximum allowable longitudinal gradient is 1/200 Superelevation = 8% Total carriageway width = 7m (3.5 per direction) Normal crown =1.5%arrow_forward
- Design a highway with the following criteria (Determine the minimum radius, widening and check if it needs transition spiral) Design speed = 85 kph I = 20o e = 0.06 sight distance = 125m m = 10 m 2 lane road Typical car wheel length 2.5 m Width of pavement per lane = 3.6 m PreviousNextarrow_forwardFind the total width of a two lane, no kerbs pavement on a horizontal curve along a national primary road with rolling topography. Use distance between two wheels = 6 m, superelevation= 0.07, skid resistance = 0.15. (Hint: Use IRC values for normal width of a road)arrow_forwardA one lane loop ramp at the northwest quadrant of an interchange, this loop ramp is for northbound vehicles to change travel directions towards the west. The friction factor between the tire and the pavement is 0.095. If the design speed is 35 mph and the radius of the loop ramp is 545 ft measured to the centerline What should be the super elevation ?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Structural Analysis (10th Edition)Civil EngineeringISBN:9780134610672Author:Russell C. HibbelerPublisher:PEARSONPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Fundamentals of Structural AnalysisCivil EngineeringISBN:9780073398006Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel LanningPublisher:McGraw-Hill EducationTraffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning