Principles of Foundation Engineering (MindTap Course List)
8th Edition
ISBN: 9781305081550
Author: Braja M. Das
Publisher: Cengage Learning
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
error_outline
This textbook solution is under construction.
Students have asked these similar questions
The soil in a borrow pit has a void ratio of 0.9. A fill-in place volume of 20,000 m3 is to be constructed with an in-place dry density of 18.84 kN/m3. If the owner of borrow area is to be compensated at Rs 1.5 per cubic metre of excavation, determine the cost of compensation. (grain specific gravity = 2.7)
A rectangular sedimentation basin has a surface loading rate of 40 m3/m2.d with a hydraulic retention time of 1.5 h. Calculate the water depth (m) in the basin.
The specific gravity of the ground soil of an earth dam is Gs=2.58, the void ratio e=0.84, and the hydraulic gradient i e at the downstream seepage outlet is 0.22. If the safety factor Fs is 2.2, then ask whether there will be the damage of soil flow at the outlet of the earth dam?
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- An earth dam require a total of 150 cubic meter of soil compacted with a bulk unit weight of 18.5KN/m^3 and moisture content of 10%, the specific gravity of solid particles is 2.55. Choose two out of the three borrow pits, if borrow pit 3 is automatically one of the choice. Choose the most economical choice.arrow_forwardExplain the cross section of flood plain deposits with the help of diagram.arrow_forwardThe diagram of a sand drain is shown in Figures 16.21 and 16.22. Given: rw = 0.25 m, rs = 0.35 m, de = 4.5 m, Cv = Cvr = 0.3 m2/month, kh/ks = 2, and Hc = 9 m.Determine:a. The degree of consolidation for the clay layer caused only by the sand drains after six months of surcharge applicationb. The degree of consolidation for the clay layer that is caused by the combination of vertical drainage (drained on top and bottom) and radial drainage after six months of the application of surcharge. Assume that the surcharge is applied instantaneously.arrow_forward
- What is deposition of sediments and how this occur and how can this be managed? (Short essay)arrow_forwardAssume that concentration is directly proportional to flow rate (i.e., C=KQ). Determine and plot the pollutograph [mg/L vs. min] and the sedimentgraph [kg/sec vs. min] for a total sediment load of 1150 tons for the following runoff hydrograph. [Hint: you need to determine a value for K with units of mg/sec/(cfs)2]. Time (min) Flow Rate (cfs) 0 30 60 90 120 150 180 0 45 190 375 285 95 0 As a check, determine and report the total sediment load from the sedimentgraph.arrow_forwardRefer to Figure 7.28. For the construction of an airport, a large fill operationis required. For the work, the average permanent load, (p), on the claylayer will increase by about 70 kN/m2. The average effective overburdenpressure on the clay layer before the fill operation is 95 kN/m2. For the claylayer, which is normally consolidated and drained at top and bottom, H = 5 m, Cc = 0.24, e0 = 0.81, and cv = 0.44 m2/mo.a. Determine the primary consolidation settlement of the clay layer causedby the additional permanent load, (p).b. What is the time required for 90% of primary consolidation settlementunder the additional permanent load only?c. What temporary surcharge, (f), will be required to eliminate the entireprimary consolidation settlement in 6 months by the precompressiontechnique?arrow_forward
- A double wall sheet pile coffer dam retains a height of water 9 m on one side. A flow net constructed for this structure, driven into a pervious deposit overlain by an impervious ledge, consists of five flow channels and fifteen potential drops. The length of the coffer dam is 90 meters. If the coefficient of permeability of the pervious deposit is 10^–2 mm/s.Determine the seepage in cubic meters per day.arrow_forwardQ. Solve this seepage problem.arrow_forwardAn earth dam requires 1 million cu.m. of soil compacted to a void ratio of 0.80. In the vicinity of the proposed dam, three borrow pits were identified as having suitable materials. The cost of purchasing the soil and the cost of excavation are the same for each borrow pit. The only cost difference is transportation cost. The table below provides the void ratio and the transportation cost for each borrow pit. PLEASE COMPLETE SOLUTION 1. Compute the volume of soil if taken from borrow pit C.2. Compute the transportation cost of the soil if taken from borrow pit B.3. Which borrow pit would be the most economical?arrow_forward
- H2 = 0.3’ h = 1.25’ H1 = 0.2’ d = 1.5” H = 0.5’ D = 4” Ksand = 0.000075 ft/min Ksilt = 0.0038 ft/min Determine: Determine the total flow of water q. Find the equivalent permeability for the soil.arrow_forwardA reservoir has an initial capacity of 45,000 acre-ft, with an average annual inflow of 63,000 acre-ft and a sediment inflow of 180 acre-ft/yr. The useful life of the reservoir is when only 20% of the capacity remains. (a) Assuming the sediment capture rate is unchanged and equal to that of the new reservoir, what would be the lifetime of the reservoir? (b) What are the percentage capture efficiencies when the reservoir is at 100% and 20% capacities?arrow_forwardGiven: rw = 0.25 m, rs = 0.35 m, de =4.5 m, cv 5 cvr = 0.3 m2/month, kh/ks 5 2, and Hc = 9 m. Determine: The degree of consolidation for the clay layer causedonly by the sand drains after six months of surchargeapplicationarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781305081550Author:Braja M. DasPublisher:Cengage LearningPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage LearningFundamentals of Geotechnical Engineering (MindTap...Civil EngineeringISBN:9781305635180Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage Learning
- Principles of Geotechnical Engineering (MindTap C...Civil EngineeringISBN:9781305970939Author:Braja M. Das, Khaled SobhanPublisher:Cengage Learning
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781305081550
Author:Braja M. Das
Publisher:Cengage Learning
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Geotechnical Engineering (MindTap...
Civil Engineering
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Principles of Geotechnical Engineering (MindTap C...
Civil Engineering
ISBN:9781305970939
Author:Braja M. Das, Khaled Sobhan
Publisher:Cengage Learning