One approach that can be effective in reducing the impact of production bottlenecks in a job shop or batch operations setting is to use smaller lot sizes.
a. What is the impact of a production bottleneck?
b. Explain how small lot sizes can reduce the impact of bottleneck operations.
c. What are the key trade-offs in using small lot sizes for the purpose of reducing the bottleneck effect?
d. In some cases, the location of a bottleneck will shift (i.e., sometimes it is at workstation 3, another time it is at workstation 12). Furthermore, there can be more than one bottleneck operation at the same time. How would these situations impact
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
One approach that can be effective in reducing the impact of production bottlenecks in a job shopor batch operations setting is to use smaller lot sizes.a. What is the impact of a production bottleneck?b. Explain how small lot sizes can reduce the impact of bottleneck operations.c. What are the key trade-offs in using small lot sizes for the purpose of reducing the bottleneckeffect?d. In some cases, the location of a bottleneck will shift (i.e., sometimes it is at workstation 3,another time it is at workstation 12). Furthermore, there can be more than one bottleneck operation at the same time. How would these situations impact scheduling using small lot sizes?
The following table contains order-dependent setup times for four jobs. For safety reasons, jobC cannot follow job A, nor can job A follow job C. Determine the processing sequence that willminimize the total setup time. (Hint: There are 12 alternatives.)Following Job’sSetup Time (hrs.)SetupTime (hrs.) A B C DPrecedingjobA 2 — 5 × 4B 1 7 — 3 2C 3 x 2 — 2D 2 4 3 6 —
A visual aid used in loading and scheduling jobs is a:a) Gantt chart.b) planning fil e.c) bottleneck.d) load-schedule matrix.e) level material chart.
Chapter 16 Solutions
OPERATIONS MANAGEMENT W/ CNCT+
Ch. 16 - Why is scheduling fairly simple for repetitive...Ch. 16 - Prob. 2DRQCh. 16 - What are Gantt charts? How are they used in...Ch. 16 - Prob. 4DRQCh. 16 - Briefly describe each of these priority rules: a....Ch. 16 - Why are priority rules needed?Ch. 16 - What problems not generally found in manufacturing...Ch. 16 - Explain forward and backward schedulings and each...Ch. 16 - Prob. 9DRQCh. 16 - Prob. 10DRQ
Ch. 16 - Prob. 11DRQCh. 16 - What general trade-offs are involved in sequencing...Ch. 16 - Prob. 2TSCh. 16 - Prob. 3TSCh. 16 - One approach that can be effective in reducing the...Ch. 16 - Doctors and dentists offices frequently schedule...Ch. 16 - Prob. 3CTECh. 16 - Use the assignment method to determine the best...Ch. 16 - Rework Problem 1, treating the numbers in the...Ch. 16 - Assign trucks to delivery routes so that total...Ch. 16 - Develop an assignment plan that will minimize...Ch. 16 - Use the assignment method to obtain a plan that...Ch. 16 - The following table contains information...Ch. 16 - Using the information presented in the following...Ch. 16 - The following table shows orders to be processed...Ch. 16 - A wholesale grocery distribution center uses a...Ch. 16 - The times required to complete each of eight jobs...Ch. 16 - Prob. 11PCh. 16 - A shoe repair operation uses a two-step sequence...Ch. 16 - The following schedule was prepared by the...Ch. 16 - The production manager must determine the...Ch. 16 - A foreman has determined processing times at a...Ch. 16 - Given the information in the following table,...Ch. 16 - Given the following information on job times and...Ch. 16 - Prob. 18PCh. 16 - The following table contains order-dependent setup...Ch. 16 - The following table contains order-dependent setup...Ch. 16 - Prob. 21PCh. 16 - Given this information on planned and actual...Ch. 16 - Given the following data on inputs and outputs at...Ch. 16 - Determine the minimum number of workers needed,...Ch. 16 - Determine the minimum number of workers needed,...Ch. 16 - Determine the minimum number of workers needed,...Ch. 16 - Prob. 1CQ
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- 2-The process of making hotdogs involves six activities: “grind”, “mix”, “stuff”, “cook”, “peel”, and “inspect”. If the capacity of activity “cook” determines the process capacity, which of the following statements are true? a- Activity “cook” is a bottleneck activity. b- The activity time of all the other five activities is shorter than activity "cook". c- Cycle time of the process of making hotdogs is equal=1/capacity of activity “cook”. d- Increasing the capacity of activity “grind” can increase the capacity of the process of making hotdogs. All statements are correct Only statement 'b' is correct Only statements 'a' and 'b' are correct Only statements 'a', 'b' and 'c' are correct Only statement 'a' is correct Only statement 'd' is correctarrow_forwardAssign the 4 departments in Table X to locations A, B, C, and D, which are separated by the distances shown in Table y, in such a way that transportation cost is minimized. Use this heuristic: assign departments with the greatest interdepartmental workflow first. See attached table. a.Fill up the table attached. b. Compute the total transportation cost if the cost to move one workload 1 meter apart is P5.00.arrow_forwardSunny Park Tailors has been asked to make three differenttypes of wedding suits for separate customers. The followingtable highlights the time taken in hours for (1) cutting and sewingand (2) delivery of each of the suits. Which schedule finishes sooner:first come, first served (123) or a schedule using Johnson's rule?arrow_forward
- 1.a. The typical PM work order is normally generated by a computer and then issuedA. directly to the machine operator.B. to the purchasing department to get the parts ready.C. directly to a back-up maintenance technician who will double-check the work.D. by the program administrator to the shop foremen. 1.b. Proper record keeping is important to a PM program. From a task scheduling perspective, why is recordkeeping important?A. Management will know how much work is being done.B. Those tasks that weren’t completed can increase in priority on the next downtime period.C. Management will know what employees are putting out the best effort.D. The quality of work can be evaluated.arrow_forwardWhat are the advantages to finite capacity scheduling?arrow_forwardJack's Refrigeration Repair Service repairs and reconditions commercial icemakers at restaurants. Jack has four jobs to complete. Below are their processing times and due dates: Job Processing time (hours) Due date (hour) A 20 50 B 10 40 C 15 35 D 55 75 What is the average inventory if jobs are processed using the earliest due date rule?arrow_forward
- What is the outcome when a bottleneck resources is augmented with more capacity? Will throughput time increases Will cycle time decreases The resources with the second least utilization becomes bottleneck All the baove statement are correctarrow_forwardInstruction: 1. Make a cover letter based on the following information Job vacancies are published in Harian Radar Banten, Thursday, 2 September 2021 Edition that PT. Adem Prosperous needs someone secretary with qualifications of bachelor degree graduates from majors Secretary Applications should be sent no later than September 28, 2021 at Jama Margaluyu, No. 2 Serang-Bantenarrow_forwardWhat is the difference between thread scheduling and process scheduling?arrow_forward
- which new functions are being managed by multifunctional operators? describe the impact of this new role on activity relationships nad on flow and space requirements (this is in reference to facilities planning)arrow_forwardSunny Park Tailors has been asked to make threedifferent types of wedding suits for separate customers. Thetable below highlights the time taken in hours for (1) cuttingand sewing and (2) delivery of each of the suits. Which schedulefinishes sooner: first come, first served (123) or a schedule usingJohnson’s rule?arrow_forwardUse the assignment method to obtain a plan that will minimize the processing costs inthefollowing table under the following conditions: a. The combination 2-D is undesirable. b. The combinations 1-A and 2-D are undesirable.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY