Whether the given culvert will operate under inlet or outlet control for the given conditions.
Answer to Problem 20P
The given culvert is acceptable and inlet control governs.
Explanation of Solution
Given:
The diameter of concrete circular box is
The angle of inclination of flared walls is
The
The design headwater elevation is
Elevation of stream bed at face of invert is
Tail water depth is
Approximate length of culvert is
Slope of stream is
The value of
The value of
Formula used:
The flow rate per width is given by,
Here,
The required headwater is given by,
Here,
The design headwater depth is given by,
Here,
The formula for fall is given by,
The culvert invert elevation is given by,
The depth from outlet invert to hydraulic line is given by,
Here,
The outlet water elevation is given by,
Here,
The required outlet headwater elevation is given by,
Here,
Calculation:
The flow rate per width is calculated as,
Substitute
Consider Figure 16.17, "Headwater Depth for Concrete Pipe Culverts with Inlet Control" from the book "Traffic and Highway Engineering", for a depth of
The required headwater is calculated as,
Substitute
The design headwater depth is calculated as,
Substitute
The fall is calculated as,
Substitute
The culvert invert elevation is calculated as,
Substitute
The depth from outlet invert to hydraulic line is calculated as,
Substitute
The tail water is not greater so take
The outlet water elevation is calculated as,
Substitute
For circular culvert with
The required outlet headwater elevation is calculated as,
Substitute
The required outlet headwater elevation is less than the design headwater design so the given culvert is acceptable and inlet control governs.
Conclusion:
Therefore, the given culvert is acceptable and the inlet control governs.
Want to see more full solutions like this?
Chapter 16 Solutions
Traffic and Highway Engineering
- The peak discharge for a circular culvert was found to be 1.25 m^3/s. It has been determined that a water flow speed of 1.5 m/s is needed to maintain scour velocity. Calculate the approximate diameter of a circular culvert needed to carry the 1.25 m^3/s if the culvert is flowing at a depth 3/4 of the diameter. Assume that the flow in the culvert is not complex and water does not pond at either end of the culvert.arrow_forwarda culvert is designed for a peak flow Qp on the basis of the rational formula. if a storm of the same intensity as used in the design but of duration twice larger occurs the resulting peak discharge will be ?arrow_forwardA trapezoidal channel of 2.0m bed width and 3:2 side slope carries a discharge of 10m3/sec with a depth of flow of 0.5m. Determine whether the flow is supercritical or subcritical. If hydraulic jump where to form. what would be its height and efficiency. Assume mannings coefficient n = 0.025arrow_forward
- A rectangular sedimentation basin to treat a flow of 12000 m3 /day designed for 4hrs, and with L:B of 4:1 Find the weir loading rate a) 1200 m3 /dayarrow_forwardKindly show complete solution. Q. Determine the head of a 45°V-notch weir for a discharge of 225 L/s. a. 0.691 m b. 0.799 m c. 0.821 m d. 0.524 marrow_forwardAn elliptical culvert is 3.5 feet tall and 9 feet wide. It is filled with water to a depth of 1.05 feet. Find width of the stream.arrow_forward
- In a circular channel 2.5meters in diameter, flowing below half full, the water surface width is 2.415meter in length. a.Compute the hydraulic radius. b.The channel is laid on a grade of 24.146meters per mile; compute its discharge using Manning’s formula withn= 0.025. c.For flow as in (b), compute the C value in the Chezy formula. d.Using C in (c), and for flow as in (b), compute the value of Kutter’s nin the Kutter’s C formula. Simplify your solution, no solution by calculator or shift solve. e.Compute the maximum velocity that may occur for the given circular channel using as in (d) and Manning’s formula.arrow_forwardThe hydraulic jump occurs in a trapezoidal channel with side slopes of 1:1 and a base of 4m. If the upstream depth before the jump is 1m and the downstream depth is 2m, what is the discharge?arrow_forwardIn 28.5 secs, 35,579 L of water is collected. The length of the rectangular weir is 2.15 m, the crest is 450 mm high from the channel bed and it should maintain a constant head of 275 mm. Determine the coefficient of discharge. Assume there is head loss. show your complete solutionarrow_forward
- Design an irrigation channel in alluvial soil according to Lacey's silt theory, given the following data: Full supply discharge = 15 m3 / sec, Lacey's silt factor = 1.0 Channels side slopes = (1 / 2H: IV).arrow_forwardA 450 mm diameter culvert has been designed to convey a discharge of Q = 0.55 m3/s of storm-water under a residential road. The culvert is 37.5 m long and has a slope of 1.3%. The downstream flow depth was obtained as 0.35 m from a hydraulic analysis. You are required to determine:1.1 the head required to convey the discharge through the culvert at full flow conditions;(a) If concrete pipe is used with a Manning’s roughness coefficient of n = 0.0155 with an inlet headwall of socket type. (b) If corrugated steel pipe is used with a Manning’s roughness coefficient n=0.024 with an inlet headwall of square edge design. 1.2 What is the corresponding headwater depth in 1.1 (a) and (b) above?arrow_forwardA sharp-crested weir 2 ft high extends across a rectangular channel 8 feet wide conducting irrigation water. If the measured head is 4.75 inches, determine the discharge.arrow_forward
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning