(a)
The volume of traffic across the bridge.
Answer to Problem 3P
The volume of traffic across the bridge is
Explanation of Solution
Given:
The total cost to travel across bridge except tolls is expressed as,
Here,
The demand to travel across the bridge is,
Calculations:
Calculate volume of traffic across the bridge.
The total cost to travel across bridge except tolls is,
The volume across the bridge is,
Solve Equations (I) and (II).
Conclusion:
Therefore, the volume of traffic across the bridge is
(b)
The volume of traffic across the bridge if a toll of
Answer to Problem 3P
The volume of traffic across the bridge if a toll of
Explanation of Solution
Concept used:
Write the expression to calculate the volume expected for a
Here,
Calculations:
Calculate volume of traffic across the bridge if toll is increased to
The new cost of the cost of travel across bridge is,
Substitute
Calculate volume of traffic expected for a
Substitute
Conclusion:
Therefore, the volume of traffic across the bridge if a toll of
(c)
The volume of traffic across the bridge.
Answer to Problem 3P
The volume of traffic across the bridge is
Explanation of Solution
Given:
The total cost to travel across bridge including toll is expressed as,
Calculations:
Calculate volume of traffic across the bridge.
Substitute
Conclusion:
Therefore, the volume of traffic across the bridge is
(d)
The toll to yield the highest revenue for demand and supply function and the associated demand and revenue.
Answer to Problem 3P
The toll which yield the highest revenue for demand and supply function is
Explanation of Solution
Concept used:
Write the expression to calculate the revenue generated.
Here,
Calculations:
Assume the toll rate as
The new cost of the cost of travel across bridge is,
Substitute
Substitute
From the above equation, the toll which would yield the maximum revenue is 100 cents or
Substitute
Calculate the demand for travel across the bridge for maximum revenue.
Substitute
Conclusion:
Therefore, the toll which yield the highest revenue for demand and supply function is
Want to see more full solutions like this?
Chapter 2 Solutions
EBK TRAFFIC AND HIGHWAY ENGINEERING
- A toll bridge carries 10,000 veh/day. The current toll is $3.00/vehicle. Studies have shown that for each increase in toll of 50 cents, the traffic volume will decrease by 1000 veh/day. It is desired to increase the toll to a point where revenue will be maximized. Let V be the Volume X be the increase in toll charge (a) Write the expression for travel demand on the bridge related to toll increase and current volume. (b) Determine the increase in toll charge (c) Determine the new toll charge to maximize revenues. (d) Determine traffic in veh/day after toll increase. (e) Determine total revenue increase with new toll.arrow_forwardAt 7.8%, a bridge cost P220M with a life of 18 years. The bridge must be partially rebuilt at a cost if P90M at the end of each 18 years. Calculate the capitalized cost if an annual maintenance of P590,000 is required.arrow_forwardA building will be constructed at A as shown in the figure below. Calculate the estimated cost of the building using the volume method. The same building was built in B at a rate of RM305/m^3 in 2019. The percentage increase in the price of goods is 3% per year. Estimate the cost of the building to be built in A.arrow_forward
- Dunkin City wants to build a new bypass between two major roads that will cut travel time for commuters. The road will cost $14,000,000 and save 17,500 people $100/yr in gas. The road will need to be resurfaced every year at a cost of $7,500. The road is expected to be used for 20 years. Determine if Dunkin City should build the road using B/C analysis. The cost of money is 8%.arrow_forward1. Assume that the following goals have been established for a transportation planning study.Goal 1: The transportation system should provide mobility for all segments of the population.Goal 2: The transportation system should minimize the impact on the natural environment.Define at least three objectives for each goal that could be used to achieve the stated purpose. 2. From the sketch below, calculate the interzonal trips due to 450 work trips produced at zone i. There are 750 attractions at zone 1, 400 attractions at zone 2, and 300 attractions at zone 3. The exponent of travel time is 0.6 and the travel times are 9 minutes to zone 1, 5 minutes to zone 2, and 7 minutes to zone 3. Assume all socioeconomic adjustment factors and the value of C are equal to 1.0.arrow_forwardif you need to build a road of length 1Km and width 16ft in three layers. calculate the total cost of materials , labor and equipments used to make this road in 10 days. The rates are givenarrow_forward
- The demand and supply function for a bridge are the following where C is cost in cents and V is volume in veh / h . Demand V = 1500 - 10C Supply or cost function: C = 120 + 0.5V (a) What is the equilibrium volume of traffic and the associated cost? (b) 20 cents of toll is added to the cost function, what will be the new cost function and the equilibrium volume?arrow_forwardA toll bridge carries 5000 veh/day. the current tol is 50 cents. When the toll is increased by P0. 25. Traffic volume decreases by 5000 veh/day. Det. the additional amount of toll that should be charged such that the revenue is maximized.arrow_forwardQuestion:- Traffic counts in the year 2000 at a counting point on a national highway gave ADT as follows: 4000cars,1750 taxis,250 trucks,100 buses.National traffic growth in the area is expected to be 5% for private cars and taxis, 3% for trucks and buses.After improvements, generated traffic for the highway will be 20 % of the 2000 ADT.It is required to design the cross-section of the highway to satisfy the traffic needs by the year 2015 show all visible dimensions on a drawing sketch. Take:-K= 0.15PLC = 800 p.c.e'/hour.directional distribution (D) is 0.6arrow_forward
- A large residential area has 1500 households with an average household income of $15,000, an average household size of 5.2, and, on the average, 1.2 working members. Using the model below, predict the change in the number of peak-hour social/recreational trips if employment in the area increased by 20% and household income by 10%. number of peak-hour vehicle-based social/recreational trips per household = 0.04 + 0.018(household size) + 0.009(annual household income [in thousands of dollars]) + 0.16(number of nonworking household members) Round off final answers to whole number.arrow_forwardA large residential area has 1500 households with an average household income of $15,000, an average household size of 5.2, and, on the average, 1.2 working members. Using the model below, predict the change in the number of peak hour social/recreational trips If employment in the area increased by 20% and household income by 10%. number of peak-hour vehicle-based social/recreational trips per household 0.04 + 0.018(household size)+ 0.009(annual household income in thousands of dollars)+ 0.16(number of nonworking household members)arrow_forwardA city engineer has estimated the annual toll revenues from a proposed highway construction project over 20 years as follows: An = ($2,000,000)(n)(l.06)n-1 n = 1.2 .... ,20.To determine the amount of debt financing through bonds, the engineer was asked to present the estimated total present value of toll revenue at an interest rate of 6%. Assuming annual compounding, find the present value of the estimated toll revenue.arrow_forward
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning