Introduction:
AP hospital new intensive care units was designed for 6,500 births a year but with more than 13,000 births in mid 2000’s the hospital intensive care unit is stretched to its limits.
With a need for expansion, the management decided to put 273-bed building which has to be build adhering to the hospital guidelines.
The vice president, Mr. KH wanted the facility to the inside out and the team went on for discussion. A administrative team with 35 users and 1,000 meetings were held along with supereme court to deal with the conflicting issues.
Another complex issues were the funding and regulatory issues. The director of facilty development, Mr. TH was given the responsibility of 100 million project and the activites are given.
To develop: A network diagram for construction of hospital.
Want to see the full answer?
Check out a sample textbook solutionChapter 3 Solutions
EBK PRINCIPLES OF OPERATIONS MANAGEMENT
- Assuming that you are a project manager for a consulting firm that is planning a feasibility study for a new city centre scheme. The activities for the final phase of the study project have been identified. The logical relationships for the identified activities is as shown in the dependency table below. Table 3.2: Activities for the Final Phase of a Feasibility Study Activity Immediate /predecessor (s) Duration (weeks) No. of Staff Needed A 3 B 5 3 C 4 B D A 7 2 E B.C 8 2 F C 6 5 G EF B 3 H F 10 B D.G 6 5 Table 3.2: Dependency Table Based on the information provided in the table: i. Draw and analyze the network diagram; and ii. Indicate the type of dependency relationships.arrow_forwardBased on project information on kitchen space renovation as prepared below, fil in the time estimates (t, activity variances (v) and answer all questions: Activity Predecessor Time Estimates (in weeks) Optimistic Most Likely Pessimistic a m 10 11 A. 10 18 A 13 15 A E 2 D 7 B, C (1) Construct the AOA node network. (i) Construct the AON node configuration network. (i) Based on the AON node configuration network above, fil the information in the table as provided below: Activity Early Start Early Finish Latest Start Latest Finish Slack A G (v) Determine the project's completion time. (v) Determine the critical path af the project. (vi) Determine the probability that the project will be completed in 23 weeks, 25 weeks and 27 weeks.arrow_forwardConsider the following data for a project to install a new server at the Northland Pines High School: Activity Time (days) 1 4 5 4 1 7 3 2 3 6 a. Choose the correct network diagram below. O A. Activity A BCDEFGH-. с J Q Immediate Predecessor(s) B. A A B B B, C D, E F F G, H, I Q OUarrow_forward
- Part 1: Below matrix shows one of the important data used in project management, identify the name of the matrix and explain the roles of each person involved in this matrix. Total= 10 marks Facilities Plant Mgr HR Security Project Mgr Identify a minimum of three asphalt R contractors from Angie's List Arrange for contractor visits and quotes Review quotes and references, A R make contractor selection Review and finalize contract, lock in plant shutdown week R Communicate project to shutdown maintenance crew, make sure all R vehicles are removed from the lot Provide security gate access codes for asphalt crew by June 15 A Oversee the project during the plant shutdown week, ensure it is A R completed on time R = Responsible, A = Accountable, C = Consulted, I = Informedarrow_forwardThe following information is available about a project toorganize an event to honor the mayor of West Allis at theNathan Hale High School:Activity Activity Time (days) Immediate Predecessor(s)A 3 —B 4 —C 5 —D 4 —E 7 AF 2 B, C, DG 4 E, FH 6 FI 4 GJ 3 GK 3 Ha. Draw the network diagram.b. Find the critical path.arrow_forwardExplain the use of management tools and what are the differences between them and support the answer with diagram : - project milestonearrow_forward
- *(e) Draw manually the appropriate network diagram (using PDM) and then find (and also provide as a table) for each of the activities by d: early start (ES), early finish (EF), late start (LS), late finish (LF) and total floats and total slacks and provide them in a table form.arrow_forwardQ3: What is Critical Path Analysis? Explain with the help of a suitable example.arrow_forwardUsing the information provided in the table, the network diagram and the project completion time = 25 weeks, reduce the completion time of the project by 5 weeks in the most economical way. Activity A B с D E TI F G H Normal Time (weeks) A(3) 3 D(6) 4 6 6 6 5 7 AON network diagram B(4) 3 C(6) Normal Cost ($) 500 600 700 1,450 1,750 200 1,450 450 E(6) F(5) Crash Time (weeks) 2 3 3 4 4 5 5 3 G(7) Crash Cost ($) 890 710 1,180 2,070 2,290 200 1,740 450 H(3) Maximum Weeks Reduced 1 1 3 2 2 O 2 O Crash Cost per Week ($) 390 110 160 310 270 0 145 0arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.