Concept explainers
Interest Earned
Assuming there are no deposits other than the original investment, the balance in a savings account after one year may be calculated as
Principal is the balance in the savings account, Rate is the interest rate, and T is the number of times the interest is compounded during a year (T is 4 if the interest is compounded quarterly).
Write a
Interest Rate: | 4.25% |
Times Compounded: | 12 |
Principal: | $1000.00 |
Interest: | $43.34 |
Amount in Savings: | $1043.34 |
Want to see the full answer?
Check out a sample textbook solutionChapter 3 Solutions
Starting Out with C++ from Control Structures to Objects, Student Value Edition (9th Edition)
Additional Engineering Textbook Solutions
Digital Fundamentals (11th Edition)
Artificial Intelligence: A Modern Approach
Modern Database Management
Introduction to Java Programming and Data Structures, Comprehensive Version (11th Edition)
Java: An Introduction to Problem Solving and Programming (8th Edition)
Starting Out with C++: Early Objects
- 25. Repeat Programming Exercise 24, but the wire is to be bent in the form of a circle. In this case, the user specifies the length of the wire and the program outputs the radius and area of the circle. (You may assume that . Also declare it as a named constant.)arrow_forward4. During each summer, John and Jessica grow vegetables in their backyard and buy seeds and fertilizer from a local nursery. The nursery carries different types of vegetable fertilizers in various bag sizes. When buying a particular fertilizer, they want to know the price of the fertilizer per pound and the cost of fertilizing per square foot. The following program prompts the user to enter the size of the fertilizer bag, in pounds, the cost of the bag, and the area, in square feet, that can be covered by the bag. The program should output the desired result. However, the program contains logic errors. Find and correct the logic errors so that the program works properly. // Logic errors. #include #include using namespace std; int main() { double costs double area; double bagsize; cout > bagsize; cout > cost; cout > area; cout << endl; cout << "The cost of the fertilizer per pound is: $" << bagsize / cost << endl; cout << "The cost of fertilizing per square foot is: $" << area / cost << endl; return 0; }arrow_forward(Statistics) This is the formula for the standard normal deviate, z, used in statistical applications: z=(X)/ X is a single value. refers to an average value. refers to a standard deviation. Using this formula, you need to write a program that calculates and displays the value of the standard normal deviate when X=85.3,=80,and=4. a. For this programming problem, how many outputs are required? b. How many inputs does this problem have? c. Determine a formula for converting input items into output items. d. Test the formula written for Exercise 7c, using the data given in the problem.arrow_forward
- (Physics) Coulomb’s Law states that the force, F, acting between two electrically charged spheres is given by this formula: F=kq1q2r2 q1isthechargeonthefirstsphere.q2isthechargeonthesecondsphere.risthedistancebetweenthecentersofthetwospheres.kisaproportionalityconstant. Write an assignment statement to calculate the force, F.arrow_forwardFactorial) The factorial of a nonnegative integer n is written n! (pronounced “n factorial”) and is defined as follows:For example, 5!= 5.4.3.2.1 , which is 120. Use while statements in each of the following:A. Write a program that reads a nonnegative integer and computes and prints its factorial.B. Write a program that estimates the value of the mathematical constant e by using the formula:Prompt the user for the desired accuracy of e (i.e., the number of terms in the summation).C. Write a program that computes the value of by using the formula Prompt the user for the desired accuracy of e (i.e., thenumber of terms in the summation).arrow_forwardOpen notes and open book. Suppose you have a certain amount of money in a savings account that earnscompound monthly interest, and you want to calculate the amount that you willhave after a specific number of months. The formula is as follows:f = p * (1 + i)^t• f is the future value of the account after the specified time period.• p is the present value of the account.• i is the monthly interest rate.• t is the number of months.Write a program that takes the account's present value, monthly interest rate,and the number of months that the money will be left in the account as threeinputs from the user. The program should pass these values to a function thatreturns the future value of the account after the specified number of months.the program should print the account's future value.arrow_forward
- Net Salary Calculator (Toy Problem)Write a program whose major task is to calculate an individual’s Net Salary by getting the inputs of basic salary and benefits. Calculate the payee (i.e. Tax), NHIFDeductions, NSSFDeductions, gross salary, and net salary.arrow_forwardAssuming there are no deposits other than the original investment, the balance in a saving account after one year may be calculated as Amount=Principal * (1+ Rate / T)T principal -balance in the saving account, Rate -the interest rate, T - number of times the interest is compounded during a year. Write a program that asks for : the principal, the interest rate, and the number of times the interest is compounded. It should display a report similar to Interest Rate: 4.25% Times Compounded: 12 Principal: $ 1000.00 Interest: $ 43.34 Amount in Savings: $ 1043.34arrow_forwardInterest Rates Savings accounts state an interest rate and a compounding period. If theamount deposited is P, the stated interest rate is r, and interest is compounded m timesper year, then the balance in the account after one year is P⋅(1+rm)m. For instance, if$1000 is deposited at 3% interest compounded quarterly (that is, 4 times per year), thenthe balance after one year is1000⋅(1+.034)4=1000⋅1.00754=$1,030.34.Interest rates with different compounding periods cannot be compared directly.The concept of APY (annual percentage yield) must be used to make the comparison. TheAPY for a stated interest rate r compounded m times per year is defined byAPY=(1+rm)m−1.(The APY is the simple interest rate that yields the same amount of interest after oneyear as the compounded annual rate of interest.) Write a program to compare interestrates offered by two different banks and determine the most favorable interest rate. SeeFig. 4.24.arrow_forward
- C++ Programming point* go_far(point* other) Return the point bearing the x- and the y- coordinates of whichever x- and y-coordinates is further from the origin. Identify which of the two points have the furthest x- and y-coordinates independently. Example: this point has (-5, 1) and the other point has (4, 9). In the x-coordinate of the two points, -5 is further from the origin than 4. In the y-coordinate of the two points, 9 is further from the origin than 1. Hence, we return a new point bearing the coordinates (-5, 9).arrow_forward(Average speed in miles) Assume that a runner runs 15 kilometers in 50 minutesand 30 seconds. Write a program that displays the average speed in miles per hour.(Note that 1 mile is 1.6 kilometers.)arrow_forwardNewton’s law states that the force, F, between two bodies of masses M1 and M2 is given by: F = k in which k is the gravitational constant and d is the distance between the bodies. The value of k is approximately 6.67 x 10-8 dyn. cm2/g2. Write the algorithm and a program that prompts the user to input the masses of the bodies and the distance between the bodies. The program then outputs the force between the bodies.arrow_forward
- C++ Programming: From Problem Analysis to Program...Computer ScienceISBN:9781337102087Author:D. S. MalikPublisher:Cengage LearningC++ for Engineers and ScientistsComputer ScienceISBN:9781133187844Author:Bronson, Gary J.Publisher:Course Technology Ptr