Traffic and Highway Engineering
5th Edition
ISBN: 9781305156241
Author: Garber, Nicholas J.
Publisher: Cengage Learning
expand_more
expand_more
format_list_bulleted
Question
Chapter 4, Problem 22P
To determine
The number of parking bays in the parking lot.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
Data collected at a parking lot indicate that a total of 300 cars park between 8 a.m. and 6 p.m. 10% of these cars are parked for an average of 2 hr, 30% for an average of 4 hr, and the remaining cars are parked for an average of 10 hr.
1. Determine the space-hours of demand at the lot.
Data collected at a parking lot indicate that a total of 300 cars park between 8 a.m. and 5 p.m. 5% of these cars are parked for an average of 2 hr, 20% for an average of 3 hr, 10% for an average of 4 hr, and the remaining cars are parked for an average of 9 hr. (a) Determine the space-hours of demand at the lot. (b) If 10% of the parking bays are vacant on average (between 8 a.m. and 5 p.m.) at the parking lot, determine the number of parking bays in the parking lot. Assume an efficiency factor of 0.90. (c) The owner of the parking lot is planning an expansion of her lot to provide adequate demand for the following 10 years. If she has estimated that parking demand for all categories will increase by 3% a year, determine the number of additional parking bays that will be required.
Activity 3. Car A at a gasoline station stays there for 10 min after a car B passes at an average speed of 40 mph. How long will it take car A moving at an average speed of 50 mph to overtake car B?
Chapter 4 Solutions
Traffic and Highway Engineering
Knowledge Booster
Similar questions
- Vehicles arrive at an entrance to a recreational park. There is a single gate (at which all vehicles must stop), where a park attendant distributes free brochures. The park opens at 8:00 AM. At which vehicles begin to arrive at a rate of 480 veh/h. After 20 minutes, the arrival flow rate declines to 120 veh/h and corrtinues at that level for the remainder of the day. If the time required to distribute the brochure is 15 seconds, and assuming D/D/1 queuing (a) draw the queuing diagram (b) describe the operational characteristics of the queue (maximum queue length, maximum queuing time, average queuing time per vehicle etc.)arrow_forwardTh speeds of 25 cars were observed. 10 cars were noted to travel at 38 kph, 8 cars at 39 kph, 2 cars at 56 kph, and 5 cars at 41 kph. Assume that each car was traveling at a at constant speed. a. Determine the time mean speed in kph. b. Determine the space mean speed in kph.arrow_forwardA section of a two-lane rural highway is expected to have the following characteristics: Design speed of 80 km/hr, lanes of 3.6 m, walks of 1.2 m, mountainous terrain, 70% of sections without passing distance and length of 7 km. Of traffic 1,321 veh/hr: distribution by direction of 60/40, 10% of trucks, 10% of buses and 80% of light vehicles. Say what is the capacity of the section and the maximum intensity for the NSarrow_forward
- A freeway with two northbound lanes is shut down because of an accident. At the time of theaccident, the traffic flow rate is 1200 vehicles per hour per lane and the flow remains at this level.The capacity of the freeway is 2200 vehicles per hour per lane when not impacted by an accident.The freeway is shut down completely for 20 minutes after the accident and then one lane is openfor 20 minutes and finally both lanes are opened (40 minutes after the accident). What is theaverage delay per vehicle resulting from the accident (assuming D/D/1 queuing)?arrow_forward1.. Please show work and steps. If an approach has a PHF of 0.90 and a counted hourly volume of 800 veh/hr what is the maximum 15-minute volume and peak rate of flow? What is the highest and lowest possible value of PHF? At a given location, the space mean speed is measured as 70 mph and the rate of flow as 2200 pc/h/ln. What is the density at this location for the analysis period? How could you decrease the density by 10%?arrow_forwardTraffic movement in the 16-hrs from 6: - 22: = 0.93 24hr flow and daily (16hr) flows from Morning to Friday to be almost constant . If Friday , Saturday, and Sunday are 10000 Veh, 8000 Veh, and 8000 veh respectively, however June =107% of annual average month. Find AADT?arrow_forward
- From the following data of a freeway surveillance, there are 4 vehicles counted for a length of 200 m and the following distances each had travelled when observed on the photographs taken every 3 seconds apart. Compute the following:i. Density of flow in vehicles per km (vpk). ii. Space mean speed in kph. iii. Flow rate, in vehicles per hour. SHOW COMPLETE SOLUTION. NEED ASAP. THNAK YOUarrow_forwardCalculate the annual monetary benefit ($ from travel time/delay savings) for an intersection improvement project that reduces average delay by 3.7 sec/veh given the following information:· Average hourly wage in the city is $24.80· Assume 60% of salary for value of travel time savings· Assume 1.65 persons per vehicle· Average Daily Traffic for this intersection is 21,500 vehicles per dayarrow_forwardPlease solve this question. Subject: Transportation engineering 1 mum safety margin is 15 ft, centerline radius is 150 ft). Problem No.3 Space Requirements for a Parking Garage The owner of a parking garage located in a CBD has observed that 22 percent of those wishing to park are turned back every day during the open hours 8 a.m. to 6 p.m. because of a lack of parking spaces. An analysis of data collected at the garage indicates that 65 percent of those who park are commuters, with an average parking duration of 9 hours, and the remaining percentage are shoppers, whose average parking duration is 2 hours. If 25 percent of those who cannot park are commuters and the rest are shoppers, and a total of 220 vehicles currently park daily in the garage (i.e. parking spaces are 220), determine the number of additional spaces required to meet the excess demand. Assume parking efficiency is 0.90.arrow_forward
- Using the figure and the included equations, determine the following: a. The signal phasing plan that will yield the minimum cylce length (assuming 95% capacity utilization (Xc) and three timing stages). (Hint: First determine N-S phasing possibilities and E-W phasing possibilities, and then consider possible combinations). Use the attached equation for Cmin. b. "Optimal" cycle length. Use the attached equation for Copt. c. Effective green times for each phase (for balanced v/c ratios), for minimum cycle. Use the attached equation for gi. d. Displayed yellow and all-red times for each phase. Use the attached equations for Y and AR. e. Required pedestrian green times. Use the attached equations for Gp.arrow_forwardThe traffic intensity of a certain freeway is 0.833. The arrival rate of vehicles at a certain intersection (stop sign) is 200 vehicles per hour. Compute the service rate in vehicles/hr. *arrow_forwardTraffic flow on a single lane road is moving with a free flow speed of 40 kph and density of 50 vpk. This flow is stopped for 45 seconds at an intersection controlled by signals. Assume jam density of 250 vpk. i. What would be the speed and direction of the stopping wave? ii. What would be the length of the cars stopped? Show complete solution. need ASAP. THANK YOUarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage LearningSolid Waste EngineeringCivil EngineeringISBN:9781305635203Author:Worrell, William A.Publisher:Cengage Learning,
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,