Traffic and Highway Engineering - With Mindtap
Traffic and Highway Engineering - With Mindtap
5th Edition
ISBN: 9781305360990
Author: Garber
Publisher: CENGAGE L
Question
Book Icon
Chapter 4, Problem 8P
To determine

The plot of expected noncompliance percentages versus the associated speed limit on a graph and recommend the speed for the road with reasons.

Blurred answer
Students have asked these similar questions
To determine the ADT on the road, the data was collected as shown below on a Tuesday during the following. Consider If the traffic is expected to be 180% from the current traffic up to May 2030, Table 1: Traffic volume at specific time 7:00–8:00 a.m. 8:00 –9:00 a.m 9:00–10:00a.m 10:00–11:00 .m 11:00 –12 noon 150 120 130 50 20
The city received a complaint of afternoon traffic speeding in a residential area. The city suspected this was related to students leaving a nearby school. The first action taken by the city was to quantify the facts by conducting a spot speed study. The city decided to use the stopwatch method because of their limited resources. The Speed (mph) 21.4 22.2 23 24 Frequency of Vehicles 3. 25 26.1 27.2 28.9 30 31.5 33.3 35.2 37.5 9. 11 13 posted speed limit is 30 mph. The study was conducted on a Wednesday and started at 3:00 p.m. The time was selected to correspond to the period when most students leave the school. The study continued until a sample size of 100 9 10 10 9. 40 42.8 vehicles was measured.
Spot speed study has been carried out on a highway and collected data is shown in the table below. Speed range (kmph) No. of vehicles observed 0-10 10 10-20 13 20-30 15 30-40 12 40-50 16 Determine the design speed for checking the geometric design of the highway.
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning