Question
Chapter 6.S, Problem 11P
a)
Summary Introduction
To determine: The upper and lower control limits.
b)
Summary Introduction
To draw: The chart and plot the values.
c)
Summary Introduction
To identify: If the process is in control.
d)
Summary Introduction
To explain: The reason why the process is not in control.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Twelve samples, each containing five parts, were taken from a process that produces steel rods. The length of each rod is the sample was determined. The results were tabulated and sample means and ranges were computed.
Sample
Sample Mean (in.)
Range (in.)
1
10.001
0.011
2
10.003
0.014
3
9.995
0.007
4
10.007
0.022
5
9.997
0.013
6
9.999
0.012
7
10.001
0.008
8
10.006
0.014
9
9.994
0.005
10
10.002
0.010
11
10.002
0.013
12
10.005
0.009
Determine the upper and lower control limits and the overall means for -chart and R-chart.
Chart the charts and plot the values of the sample means and ranges.
3. Does the data indicate a process that is in control? Why or why not?
Five samples of size 4 were taken from a process. A range chart was developed that had LCLR = 0 and UCLR = 2.50. Similarly, an average chart was developed with the average range from the five samples, with LCL = 15.0 and UCL = 24.0. The ranges for each of the five samples were 1.75, 2.42, 2.75, 2.04, and 2.80, respectively. The values of the sample average for each sample were 19.5, 22.3, 17.4, 20.1, and 18.9, respectively. What can you tell management from this analysis?
The process variability is out of control, and we cannot make a statement about the process average.
The process variability is out of control, but the process average is in control.
The process variability and the process average are out of control.
We cannot tell if the process variability or the process average is out of control.
Need the answer in 10 minutes, if possible. Please
Twelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were:
Sample
Sample Mean (in.)
Range (in.)
Sample
Sample Mean (in.)
Range (in.)
1
10.802
0.044
7
10.803
0.021
2
10.800
0.051
8
10.807
0.058
3
10.791
0.042
9
10.793
0.039
4
10.808
0.037
10
10.803
0.038
5
10.797
0.048
11
10.803
0.054
6
10.801
0.053
12
10.806
0.061
Part 2
For the given data, the
x
=
enter your response here
inches (round your response to four decimal places).
Chapter 6 Solutions
OPERATIONS MGMT(LOOSELEAF)W/MYOMLAB>IC
Ch. 6.S - Prob. 1DQCh. 6.S - Define in statistical control.Ch. 6.S - Prob. 3DQCh. 6.S - Prob. 4DQCh. 6.S - Prob. 5DQCh. 6.S - Prob. 6DQCh. 6.S - Prob. 7DQCh. 6.S - Prob. 8DQCh. 6.S - Prob. 9DQCh. 6.S - Prob. 10DQ
Ch. 6.S - Prob. 11DQCh. 6.S - Prob. 12DQCh. 6.S - Prob. 13DQCh. 6.S - Prob. 14DQCh. 6.S - Prob. 15DQCh. 6.S - Prob. 16DQCh. 6.S - Prob. 17DQCh. 6.S - What does the formula L = D2C mean?Ch. 6.S - Prob. 19DQCh. 6.S - An avant-garde clothing manufacturer runs a series...Ch. 6.S - Prob. 2PCh. 6.S - Prob. 3PCh. 6.S - Prob. 4PCh. 6.S - Prob. 5PCh. 6.S - Develop a flowchart [as in Figure 6.6 (e) and...Ch. 6.S - Prob. 7PCh. 6.S - Prob. 8PCh. 6.S - Prob. 9PCh. 6.S - Prob. 10PCh. 6.S - Prob. 11PCh. 6.S - Prob. 12PCh. 6.S - Prob. 13PCh. 6.S - Prob. 14PCh. 6.S - Prob. 15PCh. 6.S - Prob. 16PCh. 6.S - Prob. 17PCh. 6.S - Prob. 18PCh. 6.S - Prob. 19PCh. 6.S - Prob. 20PCh. 6.S - Prob. 21PCh. 6.S - Prob. 22PCh. 6.S - Prob. 23PCh. 6.S - Prob. 24PCh. 6.S - Prob. 25PCh. 6.S - Prob. 40PCh. 6.S - Prob. 41PCh. 6.S - Prob. 42PCh. 6.S - Prob. 43PCh. 6.S - Prob. 44PCh. 6.S - Prob. 45PCh. 6.S - Prob. 51PCh. 6.S - Prob. 52PCh. 6.S - Prob. 26PCh. 6.S - Prob. 27PCh. 6.S - Prob. 53PCh. 6.S - Prob. 54PCh. 6.S - Prob. 55PCh. 6.S - Prob. 1CSCh. 6.S - Prob. 2CSCh. 6.S - Prob. 1.1VCCh. 6.S - Prob. 1.2VCCh. 6.S - Prob. 1.3VCCh. 6.S - Prob. 2.1VCCh. 6.S - Prob. 2.2VCCh. 6.S - Prob. 2.3VCCh. 6.S - Prob. 2.4VCCh. 6 - Prob. 1DQCh. 6 - Prob. 2DQCh. 6 - Prob. 3DQCh. 6 - Prob. 4DQCh. 6 - Prob. 5DQCh. 6 - Prob. 6DQCh. 6 - Prob. 7DQCh. 6 - Prob. 8DQCh. 6 - Prob. 9DQCh. 6 - Prob. 10DQCh. 6 - Prob. 11DQCh. 6 - Prob. 12DQCh. 6 - Prob. 13DQCh. 6 - Prob. 14DQCh. 6 - Prob. 15DQCh. 6 - Prob. 16DQCh. 6 - Prob. 17DQCh. 6 - Prob. 18DQCh. 6 - An avant-garde clothing manufacturer runs a series...Ch. 6 - Prob. 2PCh. 6 - Prob. 3PCh. 6 - Prob. 4PCh. 6 - Kathleen McFaddens restaurant in Boston has...Ch. 6 - Develop a flowchart [as in Figure 6.6 (e) and...Ch. 6 - Prob. 7PCh. 6 - Prob. 8PCh. 6 - Prob. 9PCh. 6 - Prob. 10PCh. 6 - Prob. 11PCh. 6 - Prob. 12PCh. 6 - Prob. 13PCh. 6 - Prob. 14PCh. 6 - Prob. 15PCh. 6 - Prob. 16PCh. 6 - Prob. 17PCh. 6 - Prob. 1CSCh. 6 - How could the survey have been more useful?Ch. 6 - Prob. 3CSCh. 6 - Prob. 1.1VCCh. 6 - Prob. 1.2VCCh. 6 - Prob. 1.3VCCh. 6 - Prob. 1.4VCCh. 6 - Prob. 2.1VCCh. 6 - Prob. 2.2VCCh. 6 - Prob. 2.3VCCh. 6 - Prob. 2.4VCCh. 6 - Prob. 2.5VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- In a fabric manufacturing factory, the quality control process using control charts from SPC. In an hour there are a total of 5 samples are taken each having 5 observations regarding the thickness of fabric in measured in millimeters. In a particular hour, the sample means (X-bar) are noted to be: 172.11, 219.51 . 208.24, 112.44 and 123.30 respectively. In the same sample, the corresponding ranges are: 13.1713.3815.34, 13.04, and 13.02 respectively What are the lower and upper control limits for the R chart?arrow_forwardAn operator wants to determine the standard deviation for a machine she operates. To do this, she wants to create a p-chart. Over a month's time, she collects 30 samples of 75 observations each and records the number of errors. The average proportion defective is found to be 0.024. Which of the following is the standard deviation () of the machine? a. More than 0.5 but less than or equal to 1.0 b. More than 1.0 c. Less than or equal to 0.1 d. More than 0.1 but less than or equal to 0.5arrow_forwardIn a fabric manufacturing factory, the quality control process using control charts from SPC. In an hour there are a total of 5 samples are taken each having 5 observations regarding the thickness of fabric in measured in millimeters In a particular hour, the sample means (X-bar) are noted to be: 172.11, 219.58, 208.24, 112.44, and 123.30 respectively. In the same sample, the corresponding ranges are: 13.17, 3.38, 15.34, 13.0 , and 13.02 respectively What are the lower and upper control limits for the X-bar chart? a . 157.21 , 177.05 b. 146.01, 157.87 c. 159.25, 175.02 d. 142.92, 160.66 e. 143.55, 165.47 f. None is correctarrow_forward
- In a fabric manufacturing factory, the quality contral process using control charts from SPC. In an hour there are a total of 5 samples are taken each having 4 observations regarding the thickness of fabric in measured in millimeters. In a particular hour, the sample means (X-bar) are noted to be: 156.46, 199.62, 189.31, 102.22, and112.09 respectively. In the same sample, the corresponding ranges are: 11.97, 12.17, 13.94, 11.86, and 11.83 respectively. What are the lower and upper control limits for the X-bar chart?arrow_forwardTwelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: Sample Sample Mean (in.) Range (in.) Sample Sample Mean (in.) Range (in.) 1 9.602 0.033 7 9.603 0.041 2 9.602 0.041 8 9.605 0.034 3 9.593 0.034 9 9.597 0.027 4 9.606 0.051 10 9.601 0.029 5 9.599 0.031 11 9.603 0.039 6 9.599 0.036 12 9.606 0.047 Part 2 For the given data, the x double overbarx = (inches (round your response to four decimal places)arrow_forwardTwelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: Sample Sample Mean (in.) Range (in.) Sample Sample Mean (in.) Range (in.) 1 9.602 0.033 7 9.603 0.041 2 9.602 0.041 8 9.605 0.034 3 9.593 0.034 9 9.597 0.027 4 9.606 0.051 10 9.601 0.029 5 9.599 0.031 11 9.603 0.039 6 9.599 0.036 12 9.606 0.047 Part 2 For the given data, the x double overbarx = 9.6013 inches (round your response to four decimal places). Part 3 Based on the sampling done, the control limits for 3-sigma x overbarx chart are: Upper Control Limit (UCL Subscript x…arrow_forward
- McDaniel Shipyards wants to develop control charts to assess the quality of its steel plate. They take ten sheets of 1" steel plate and compute the number of cosmetic flaws on each roll. Each sheet is 20' by 100'. Based on the following data, develop limits for the control chart, plot the control chart, and determine whether the process is in control. Sheet Number of flaws 1 1 2 1 3 2 4 0 5 1 6 5 7 0 8 2 9 0 10 2arrow_forwardTwelve samples, each containing five parts, were taken from a process that produces steel rods at Emmanual Kodzi's factory. The length of each rod in the samples was determined. The results were tabulated and sample means and ranges were computed. The results were: Sample Sample Mean (in.) Range (in.) Sample Sample Mean (in.) Range (in.)1 9.700 0.044 7 9.703 0.0212 9.700 0.051 8 9.707 0.0583 9.689 0.042 9 9.695 0.0394 9.706 0.037 10…arrow_forwardSample size (n) is 16, mean of the sample means ( ) is 15, mean of the sample ranges ( ) is 6, and population standard deviation ( ) is not known. Calculate the UCL and LCL of the mean chart (x-Chart) for this process. Group of answer choices Cannot be calculated UCL=33.0, LCL=-3.0 UCL=13.73, LCL=16.27 UCL=16.27, LCL=13.73 UCL=33.0, LCL=0arrow_forward
- A quality control manager in an Omani bottling company takes 5 samples for quality control purposes. These sample mean (X- bar) are; 8.51, 8.18, 11.07, 10.03, and 10.23 respectively. Additionally, the range values for these 5 samples are; 3.33, 2.61, 3.39, 4.39, and 6.49. If the lower control limit for X- bar chart is 7.664, what should be the most appropriate sample size? O a. 3 O b. None is correct O C. 4 O d. 6 O e. 5arrow_forwardThe Road King Tire Company in Birmingham wants to monitor the quality of the tires it manufactures. Each day the company quality-control manager takes a sample of 100 tires, tests them, and determines the number of defective tires. The results of 20 samples have been recorded as follows: Sample Number of Defectives Sample Number of Defectives 1 14 11 18 2 12 12 10 3 9 13 19 4 10 14 20 5 11 15 17 6 7 16 18 7 8 17 18 8 14 18 22 9 16 19 24 10 17 20 23 Construct a P -chart for this process using 2q limits and describe the variation in the process. Note:- Do not provide handwritten solution. Maintain accuracy and quality in your answer. Take care of plagiarism. Answer completely. You will get up vote for sure.arrow_forwardIn a sausage factory, quality managers are studying the compliance of the sausages with the requirements. Any sausage having pin holes, air pockets, deformation or breakage in its casings is counted as defective and total number of such defective sausages alone is noted in each shift. The following data represents the number of defective sausages in samples of 200 sausages taken from 10 shifts. Sample Defectives Percent Defective 1 40 20% 2 28 14% 3 15 8% 4 23 (a) 5 20 10% 6 21 11% 7 19 10% 8 15 8% 9 16 8% 10 17 9% Calculate the value for (a) in the table above. Calculate p-bar based on the samples above. What is the UCL and LCL for a p chart based on the data provided and a desired control level of 99.74%? Use your control limits from part b along with the data provided to draw a p-chart. Is the process in control? Why or why not? If not in control, suggest some potential reasons.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.