To determine: The upper and lower control limits.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
At Webster Chemical Company, lumps in the caulking compound could cause difficulties in dispensing a smooth bead from the tube. Even when the process is in control, an average of four lumps per tube of caulk will remain. Testing for the presence of lumps destroys the product, so an analyst takes random samples. The following results are obtained:
Tube No.
Lumps
Tube No.
Lumps
Tube No.
Lumps
1
6
5
6
9
5
2
5
6
4
10
0
3
0
7
1
11
9
4
4
8
6
12
2
Determine the c-chart two-sigma upper and lower control limits for this process. Is the process in statistical control?
Using samples of 200 credit card statements, an auditor found the following:
Sample 1 2 3 4
Number with errors 4 2 5 9
a. Determine the fraction defective in each sample.
b. If the true fraction defective for this process is unknown, what is your estimate of it?
c. What is your estimate of the mean and standard deviation of the sampling distribution of fractions defective for samples of this size?
d. What control limits would give an alpha risk of .03 for this process? Page 457
e. What alpha risk would control limits of .047 and .003 provide?
f. Using control limits of .047 and .003, is the process in control?
g. Suppose that the long-term fraction defective of the process is known to be 2 percent. What are the values of the mean and standard deviation of the sampling distribution?
h. Construct a control chart for the process, assuming a fraction defective of 2 percent, using two-sigma control limits. Is the process in control?
Can you show me the steps and formulas using excel
Using samples of 200 credit card statements, an auditor found the following:Sample 1 2 3 4Number with errors 4 2 5 9a. Determine the fraction defective in each sample.b. If the true fraction defective for this process is unknown, what is your estimate of it?c. What is your estimate of the mean and standard deviation of the sampling distribution of fractions defective for samples of this size?d. What control limits would give an alpha risk of .03 for this process?e. What alpha risk would control limits of .047 and .003 provide?f. Using control limits of .047 and .003, is the process in control?g. Suppose that the long-term fraction defective of the process is known to be 2 percent. What arethe values of the mean and standard deviation of the sampling distribution?h. Construct a control chart for the process, assuming a fraction defective of 2 percent, using twosigma control limits. Is the process in control?
Chapter 6 Solutions
Operations Management and Student CD
Ch. 6.S - Prob. 1DQCh. 6.S - Define in statistical control.Ch. 6.S - Prob. 3DQCh. 6.S - Prob. 4DQCh. 6.S - Prob. 5DQCh. 6.S - Prob. 6DQCh. 6.S - Prob. 7DQCh. 6.S - Prob. 8DQCh. 6.S - Prob. 9DQCh. 6.S - Prob. 10DQ
Ch. 6.S - Prob. 11DQCh. 6.S - Prob. 12DQCh. 6.S - Prob. 13DQCh. 6.S - Prob. 14DQCh. 6.S - Prob. 15DQCh. 6.S - Prob. 16DQCh. 6.S - Prob. 17DQCh. 6.S - What does the formula L = D2C mean?Ch. 6.S - Prob. 19DQCh. 6.S - An avant-garde clothing manufacturer runs a series...Ch. 6.S - Prob. 2PCh. 6.S - Prob. 3PCh. 6.S - Prob. 4PCh. 6.S - Kathleen McFaddens restaurant in Boston has...Ch. 6.S - Develop a flowchart [as in Figure 6.6 (e) and...Ch. 6.S - Prob. 7PCh. 6.S - Prob. 8PCh. 6.S - Prob. 9PCh. 6.S - Prob. 10PCh. 6.S - Prob. 11PCh. 6.S - Prob. 12PCh. 6.S - Prob. 13PCh. 6.S - Prob. 14PCh. 6.S - Prob. 15PCh. 6.S - Prob. 16PCh. 6.S - Prob. 17PCh. 6.S - Prob. 18PCh. 6.S - Prob. 19PCh. 6.S - Prob. 20PCh. 6.S - Prob. 21PCh. 6.S - Prob. 22PCh. 6.S - Prob. 23PCh. 6.S - Prob. 24PCh. 6.S - Prob. 25PCh. 6.S - Prob. 26PCh. 6.S - Prob. 27PCh. 6.S - Prob. 28PCh. 6.S - Prob. 29PCh. 6.S - Prob. 30PCh. 6.S - Prob. 31PCh. 6.S - Prob. 32PCh. 6.S - Prob. 33PCh. 6.S - Prob. 34PCh. 6.S - Prob. 35PCh. 6.S - Prob. 1CSCh. 6.S - Prob. 2CSCh. 6.S - Prob. 1.1VCCh. 6.S - Prob. 1.2VCCh. 6.S - Prob. 1.3VCCh. 6.S - Prob. 2.1VCCh. 6.S - Prob. 2.2VCCh. 6.S - Prob. 2.3VCCh. 6.S - Prob. 2.4VCCh. 6 - Prob. 1DQCh. 6 - Prob. 2DQCh. 6 - Prob. 3DQCh. 6 - Prob. 4DQCh. 6 - Prob. 5DQCh. 6 - Prob. 6DQCh. 6 - Prob. 7DQCh. 6 - Prob. 8DQCh. 6 - Prob. 9DQCh. 6 - Prob. 10DQCh. 6 - Prob. 11DQCh. 6 - Prob. 12DQCh. 6 - Prob. 13DQCh. 6 - Prob. 14DQCh. 6 - Prob. 15DQCh. 6 - Prob. 16DQCh. 6 - Prob. 17DQCh. 6 - What does the formula L = D2C mean?Ch. 6 - Prob. 19DQCh. 6 - An avant-garde clothing manufacturer runs a series...Ch. 6 - Prob. 2PCh. 6 - Prob. 3PCh. 6 - Prob. 4PCh. 6 - Kathleen McFaddens restaurant in Boston has...Ch. 6 - Develop a flowchart [as in Figure 6.6 (e) and...Ch. 6 - Prob. 7PCh. 6 - Prob. 8PCh. 6 - Prob. 9PCh. 6 - Prob. 10PCh. 6 - Prob. 11PCh. 6 - Prob. 12PCh. 6 - Prob. 13PCh. 6 - Prob. 14PCh. 6 - Prob. 15PCh. 6 - Prob. 16PCh. 6 - Prob. 17PCh. 6 - Prob. 1CSCh. 6 - How could the survey have been more useful?Ch. 6 - Prob. 3CSCh. 6 - Prob. 1.1VCCh. 6 - Prob. 1.2VCCh. 6 - Prob. 1.3VCCh. 6 - Prob. 1.4VCCh. 6 - Prob. 2.1VCCh. 6 - Prob. 2.2VCCh. 6 - Prob. 2.3VCCh. 6 - Prob. 2.4VCCh. 6 - Prob. 2.5VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- C-Spec, Inc., is attempting to determine whether an existing machine is capable of milling an engine part that has a key specification of 4 ± .003 inches. After a trial run on this machine, C-Spec has determined that the machine has a sample mean of 4.001 inches witha standard deviation of .002 inch. (Answer in Appendix D)a. Calculate the Cpk for this machine.b. Should C-Spec use this machine to produce this part? Why?arrow_forwardA machine at the Pacific Fruit Company fills boxes withraisins. The labeled weight of the boxes is 9 ounces. The company wants to construct an R-chart to monitor the fill-ing process and make sure the box weights are in control. The quality-control department for the company sampledfive boxes every two hours for three consecutive workingdays. The sample observations are as follows: Construct an R-chart from these data with 3 control lim-its, plot the sample range values, and comment on process control. Samples Box Weights (oz)1 9.06 9.13 8.97 8.85 8.462 8.52 8.61 9.09 9.21 8.953 9.35 8.95 9.20 9.03 8.424 9.17 9.21 9.05 9.01 9.535 9.21 8.87 8.71 9.05 9.356 8.74 8.35 8.50 9.06 8.897 9.00 9.21 9.05 9.23 8.788 9.15 9.20 9.23 9.15 9.069 9.98 8.90 8.81 9.05 9.1310 9.03 9.10 9.26 9.46 8.4711 9.53 9.02 9.11 8.88 8.9212 8.95 9.10 9.00 9.06 8.95arrow_forwardAt Gleditsia Triacanthos Company, a certain manufactured part is deemed acceptable if its lengthis between 12.45 to 12.55 inches. The process is normally distributed with an average of 12.49inches and a standard deviation of 0.014 inches. A) Is the process capable of meeting specifications? B) Does the process meet specifications?arrow_forward
- A Quality Analyst wants to construct a control chart for determining whether three machines, all producing the same product, are under control with regard to a particular quality variable. Accordingly, he sampled four units of output from each machine, with the following results : Machine #1 measurements [14, 13, 24, 22]; Machine #2 measurements [ 14, 19, 23, 14]; Machine #3 measurements [ 14, 16, 13, 16]. Using the factors for three sigma control limits, what are x-bar chart upper and lower control limits? a. 24.65and 9.013 b. 22.43and 11.24 c. 18.9and 14.76 d. 39.83and -6.167arrow_forwardHono Golf is a manufacturer of golf products in Taiwan and China. One of the golf accessories it produces at its plant in Tainan Hsing, Taiwan, is plastic golf tees. The injector molder produces golf tees that are designed to have an average height of 66 mm. To determine if this specification is met, random samples are taken from the production floor. One sample is contained in the file labeled THeight. a. Determine if the process is not producing the tees to specification. Use a significance level of 0.01. b. If the hypothesis test determines the specification is not being met, the production process will be shut down while causes and remedies are determined. At times, this occurs even though the process is functioning to specification. What type of statistical error is this?arrow_forwardRosters Chicken advertises " lite" chicken with 30% fewer calories than standard chicken. When the process for "lite" chicken breast production is in control, the average chicken breast contains 420 calories, and the standard deviation in caloric content of the chicken breast population is 25 calories. Rosters wants to design an x-chart to monitor the caloric content of chicken breasts, where 25 chicken breasts would be chosen at random to form each sample.a) What are the lower and upper control limits for th.is chart if these limits are chosen to be four standard deviations from the target?b) What a re the limits with three standard deviations from the target?arrow_forward
- An automatic filling machine is used to fill 1-liter bottles of cola. The machine’s output is approximately normal with a mean of 1.0 liter and a standard deviation of .01 liter. Output is monitoredusing means of samples of 25 observations.a. Determine upper and lower control limits that will include roughly 97 percent of the samplemeans when the process is in control.b. Given these sample means: 1.005, 1.001, .998, 1.002, .995, and .999, is the process in control?arrow_forwardThe specification limits for a product are 9.9 cm and 12.35 cm. A process that produces the product has a mean of 11.18 cm and a standard deviation of 0.52 cm. What is the process capability, Cpk? a. 0.8205 b. 1.571 c. 0.7853 d. 0.75arrow_forwardC-Spec, Inc., is attempting to determine whether an existing machine is capable of milling an engine part that has a key specification of 5 ± 0.006 inches. After a trial run on this machine, C-Spec has determined that the machine has a sample mean of 5.001 inches with a standard deviation of 0.005 inch. Calculate the Cpk for this machine. (Round your answer to 3 decimal places.)arrow_forward
- Develop a p chart with 3 sigma control limits and evaluate whether the process is in statical controlarrow_forwardA metal fabricator produces connecting rods with an outer diameter that has a 1 ± .01–inch specification. A machine operator takes several sample measurements over time and determines the sample mean outer diameter to be 1.002 inches with a standard deviation of .003 inch.a. Calculate the process capability index for this example.b. What does this figure tell you about the process?arrow_forward4. Cartons of Plaster of Paris are supposed to weigh exactly 32 oz. Inspectors want to develop process control charts. They take 5 samples of 6 boxes per sample and weigh them. Based on the following data, what are the lower and upper control limits for the 3-sigma mean chart and the range chart, respectively? Please keep two decimal places and select the best answers. Select one: a. [33.8, 34.76], [0, 2.00] b. [33.96, 34.60], [0, 1.18] c. [34.01, 34.55], [0, 1.12] d. [34.01, 34.55], [0.52, 2.52] e. [32.6, 35.96], [0, 1.12]arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.