Chapter 6.S, Problem 26P
a)
Summary Introduction
To determine: The upper control limit and lower control limit.
Introduction: Statistical process control is the method that helps to measure and control the quality during the process of production.
b)
Summary Introduction
To determine: Whether the manufacturing process is in control.
c)
Summary Introduction
To comment: On the lifetimes observed.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
C-Spec, Inc., is attempting to determine whether an existing machine is capable of milling an engine part that has a key specification of 4 ± .003 inches. After a trial run on this machine, C-Spec has determined that the machine has a sample mean of 4.001 inches witha standard deviation of .002 inch. (Answer in Appendix D)a. Calculate the Cpk for this machine.b. Should C-Spec use this machine to produce this part? Why?
4. C-Spec, Inc., is attempting to determine whether an existing machine is capable of milling an engine part that has a key specification of 4 ± 0.003 inches. After a trial run on this machine, C-Spec has determined that the machine has a sample mean of 4.001 inches with a standard deviation of 0.002 inch.
a. Calculate the capability ratio for this machine.
b. Calculate the capability index for this machine
c. Should C-Spec use this machine to produce this part?
d. Explain why?
e. Show computation
AccuSound Corporation manufactures printed circuits for stereo amplifiers. A common product defect is a “drift” caused by failure to maintain precise heat levels during the production process. Rejects from the 100 percent testing program can be reworked to acceptable levels if the defect is drift. However, in a recent analysis of customer complaints, Marie Allen, the assistant controller, and the quality control engineer determined that normal rework does not bring the circuits up to standard. Sampling showed that about half of the reworked circuits will fail after extended amplifier operation. The incidence of failure in the reworked circuits is projected to be about 10 percent over five years. Unfortunately, there is no way to determine which reworked circuits will fail, because testing will not detect the problem. The rework process could be changed to correct the problem, but the cost-benefit analysis for the suggested change indicates that it is not economically feasible.…
Chapter 6 Solutions
MYOMLAB W/O PEARSON ETEXT--INSTANT ACCE
Ch. 6.S - Prob. 1DQCh. 6.S - Define in statistical control.Ch. 6.S - Prob. 3DQCh. 6.S - Prob. 4DQCh. 6.S - Prob. 5DQCh. 6.S - Prob. 6DQCh. 6.S - Prob. 7DQCh. 6.S - Prob. 8DQCh. 6.S - Prob. 9DQCh. 6.S - Prob. 10DQ
Ch. 6.S - Prob. 11DQCh. 6.S - Prob. 12DQCh. 6.S - Prob. 13DQCh. 6.S - Prob. 14DQCh. 6.S - Prob. 15DQCh. 6.S - Prob. 16DQCh. 6.S - Prob. 17DQCh. 6.S - What does the formula L = D2C mean?Ch. 6.S - Prob. 19DQCh. 6.S - An avant-garde clothing manufacturer runs a series...Ch. 6.S - Prob. 2PCh. 6.S - Prob. 3PCh. 6.S - Prob. 4PCh. 6.S - Prob. 5PCh. 6.S - Develop a flowchart [as in Figure 6.6 (e) and...Ch. 6.S - Prob. 7PCh. 6.S - Prob. 8PCh. 6.S - Prob. 9PCh. 6.S - Prob. 10PCh. 6.S - Prob. 11PCh. 6.S - Prob. 12PCh. 6.S - Prob. 13PCh. 6.S - Prob. 14PCh. 6.S - Prob. 15PCh. 6.S - Prob. 16PCh. 6.S - Prob. 17PCh. 6.S - Prob. 18PCh. 6.S - Prob. 19PCh. 6.S - Prob. 20PCh. 6.S - Prob. 21PCh. 6.S - Prob. 22PCh. 6.S - Prob. 23PCh. 6.S - Prob. 24PCh. 6.S - Prob. 25PCh. 6.S - Prob. 40PCh. 6.S - Prob. 41PCh. 6.S - Prob. 42PCh. 6.S - Prob. 43PCh. 6.S - Prob. 44PCh. 6.S - Prob. 45PCh. 6.S - Prob. 51PCh. 6.S - Prob. 52PCh. 6.S - Prob. 26PCh. 6.S - Prob. 27PCh. 6.S - Prob. 53PCh. 6.S - Prob. 54PCh. 6.S - Prob. 55PCh. 6.S - Prob. 1CSCh. 6.S - Prob. 2CSCh. 6.S - Prob. 1.1VCCh. 6.S - Prob. 1.2VCCh. 6.S - Prob. 1.3VCCh. 6.S - Prob. 2.1VCCh. 6.S - Prob. 2.2VCCh. 6.S - Prob. 2.3VCCh. 6.S - Prob. 2.4VCCh. 6 - Prob. 1DQCh. 6 - Prob. 2DQCh. 6 - Prob. 3DQCh. 6 - Prob. 4DQCh. 6 - Prob. 5DQCh. 6 - Prob. 6DQCh. 6 - Prob. 7DQCh. 6 - Prob. 8DQCh. 6 - Prob. 9DQCh. 6 - Prob. 10DQCh. 6 - Prob. 11DQCh. 6 - Prob. 12DQCh. 6 - Prob. 13DQCh. 6 - Prob. 14DQCh. 6 - Prob. 15DQCh. 6 - Prob. 16DQCh. 6 - Prob. 17DQCh. 6 - Prob. 18DQCh. 6 - An avant-garde clothing manufacturer runs a series...Ch. 6 - Prob. 2PCh. 6 - Prob. 3PCh. 6 - Prob. 4PCh. 6 - Kathleen McFaddens restaurant in Boston has...Ch. 6 - Develop a flowchart [as in Figure 6.6 (e) and...Ch. 6 - Prob. 7PCh. 6 - Prob. 8PCh. 6 - Prob. 9PCh. 6 - Prob. 10PCh. 6 - Prob. 11PCh. 6 - Prob. 12PCh. 6 - Prob. 13PCh. 6 - Prob. 14PCh. 6 - Prob. 15PCh. 6 - Prob. 16PCh. 6 - Prob. 17PCh. 6 - Prob. 1CSCh. 6 - How could the survey have been more useful?Ch. 6 - Prob. 3CSCh. 6 - Prob. 1.1VCCh. 6 - Prob. 1.2VCCh. 6 - Prob. 1.3VCCh. 6 - Prob. 1.4VCCh. 6 - Prob. 2.1VCCh. 6 - Prob. 2.2VCCh. 6 - Prob. 2.3VCCh. 6 - Prob. 2.4VCCh. 6 - Prob. 2.5VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- West Battery Corp. has recently been receiving complaints from retailers that its 9-volt batteries are not lasting as long as other name brands. James West, head of the TQM program at West's Austin plant, believes there is no problem because his batteries have had an average life of 60hours, about 10% longer than competitors' models. To raise the lifetime above this level would require a new level of technology not available to West. Nevertheless, he is concerned enough to set up hourly assembly line checks. Previously, after ensuring that the process was running properly, West took samples of 5 9-volt batteries for 25 test to establish the standards for control chart limits. Those 25 tests are shown in the following table: Sample Data Sample Data Hour Sample Taken 1 2 3 4…arrow_forwardFearless Inc. has designed and tested 400 Super Sucker Vacuum Cleaner models. All of them were operated for 1,000 hours at Lubbock's Fearless test facility. Out of all the vacuums 2 of them failed during the test. One of them after 900 hours and the other after 500 hours. What is this product estimated Mean Time Between Failures?arrow_forwardThe specifications for a gasket that installs between two engine parts calls for a thickness of 6.0 mm ± .2 mm. The standard deviation of the process is estimated to be 0.05 mm. The process is known to operate at a mean thickness of 6.1 mm What are the upper and lower specification limits for the gasket? What are the Cp and Cpk values for this process? Is this process capable of producing the desired part?arrow_forward
- C-Spec, Inc., is attempting to determine whether an existing machine is capable of milling an engine part that has a key specification of 5 ± 0.006 inches. After a trial run on this machine, C-Spec has determined that the machine has a sample mean of 5.001 inches with a standard deviation of 0.005 inch. Calculate the Cpk for this machine. (Round your answer to 3 decimal places.)arrow_forwardA process screens a certain type of potash granule, resulting in a mean diameter of 0.067 cm and a standard deviation of 0.004 cm. The allowable variation in granule diameter is from 0.048cm to 0.087cm. Is the process capable? a. Cannnot be determined because sample size is not available b. Cannot be determined because USL and LSL information is not available c. Process is NOT capable d. Process is capablearrow_forwardAt Gleditsia Triacanthos Company, a certain manufactured part is deemed acceptable if its length is between 12.45 to 12.55 inches. The process is normally distributed with an average of 12.49 inches and a standard deviation of 0.014 inches. a) is the process capable of meeting specifications? b) Does the process meet specifications?arrow_forward
- BlueMoon Bottlers has a bottle-filling process with a mean value of 64 ounces and a standard deviation of 8 ounces. Suppose the upper and lower specification limits are 71 and 57 ounces, respectively. What is the process capability index of this process? (Note: You MUST show every single step and detailed derivation for full credit)arrow_forwardAspen Plastics produces plastic bottles to customer order. The quality inspector randomly selects four bottles from the bottle machine and measures the outside diameter of the bottleneck, a critical quality dimension that determines whether the bottle cap will fit properly. The dimensions (inch) from the last six samples are: BOTTLE Sample 1 2 3 4 1 0.694 0.622 0.698 0.69 2 0.687 0.611 0.697 0.613 3 0.671 0.680 0.695 0.602 4 0.610 0.615 0.685 0.678 5 0.680 0.624 0.618 0.614 6 0.685 0.693 0.607 0.669 What would be the center line of a 3-sigma S chart? Answer:arrow_forwardAt Gleditsia Triacanthos Company, a certain manufactured part is deemed acceptable if its lengthis between 12.45 to 12.55 inches. The process is normally distributed with an average of 12.49inches and a standard deviation of 0.014 inches. A) Is the process capable of meeting specifications? B) Does the process meet specifications?arrow_forward
- At Webster Chemical Company, lumps in the caulking compound could cause difficulties in dispensing a smooth bead from the tube. Even when the process is in control, an average of four lumps per tube of caulk will remain. Testing for the presence of lumps destroys the product, so an analyst takes random samples. The following results are obtained: Tube No. Lumps Tube No. Lumps Tube No. Lumps 1 6 5 6 9 5 2 5 6 4 10 0 3 0 7 1 11 9 4 4 8 6 12 2 Determine the c-chart two-sigma upper and lower control limits for this process. Is the process in statistical control?arrow_forwardThe National Bank of Warwick is concerned with com-plaints from customers about its drive-through window op-eration. Customers complain that it sometimes takes too long to be served and since there are often cars in front and back of a customer, they cannot leave if the service is tak-ing a long time. To correct this problem the bank installed an intercom system so the drive-through window teller cancall for assistance if the line backs up or a customer has an unusually long transaction. The bank’s objective is an aver-age customer’s waiting and service time of approximately 3 minutes. The bank’s operations manager wants to moni-tor the new drive-through window system with SPC. The manager has timed five customers’ waiting and servicetimes at random for 12 days as follows:Develop an -chart to be used in conjunction with anR-chart to monitor this drive-through window process andindicate if the process is in control using these charts. Observation Times (min)Sample 1 2 3 4 51 3.05 6.27…arrow_forwardQuality control in a factory pulls 40 parts with paint, packaging, or electronic defects from anassembly line. Of these, 28 had a paint defect, 17 had a packaging defect, 13 had an electronicdefect, 6 had both paint and packaging defects, 7 had both packaging and electronics defects, and 10had both paint and electronic defects. Did any part have all three types of defect? If so, how many?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.