Island B is a coastline where the only export is salt produced by the solar evaporation at a single facility known as Company BS. Person BT is a representative of a large international conglomerate that is interested in buying Company BS. Person BT has arrived to discuss the operations of Company BS.
To calculate: The average weekly output of salt (in tons).
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
1. Waiting time, transportation, processing, and product defects are all part of the ____________ principle of lean operating systems.
elimination of waste
increased speed and response
improved quality
reduced cost
2. Inconsistent processing systems or machine breakdowns are part of the ____________ principle of lean operating systems.
elimination of waste
increased speed and response
improved quality
reduced cost
3. In a lean operating system, any activity, material, or operation that does not add value in an organization is considered __________
inventory
Storage
Liability
Waste
5. The purpose of the Single Minute Exchange of Dies (SMED) principle is to __________________
provide visual controls
move a portion of a completed batch before the entire batch is finished
determine the order of workstations
reduce setup times
7. All of the following are true about Lean Six Sigma EXCEPT that __________________
both Lean and Six Sigma production use basic root cause,…
Meritor, a company that makes muffler assemblies for the automotive industry, is committed to the use of kanban to pull material through its manufacturing cells. Meritor has designed each cell to fabricate a specific family of muffler products. Fabricating a muffler assembly involves cutting and bending pieces of pipe that are welded to a muffler and a catalytic converter. The mufflers and catalytic converters are pulled into the cell based on current demand. The catalytic converters are made in a specialized cell.
Catalytic converters are made in batches of 10 units and are moved in special hand carts to the fabrication cells. The catalytic converter cell is designed so that different types of catalytic converters can be made with virtually no setup loss.
Meritor hires a team of consultants. The consultants suggest a partial robotic automation as well as the safety stock to be 9 percent. Meritor implements these suggestions. The result is an increase in efficiency in both the…
263 Discuss the benefits and drawbacks of the various processing options (such as On Line Transaction Entry (OLTE) and On Line Real Time Processing (OLRTP)) (OLRT).
Chapter 7 Solutions
OPERATIONS MANAGEMENT (LL)-W/ACCESS
Ch. 7 - Prob. 1CQCh. 7 - Prob. 2CQCh. 7 - Prob. 3CQCh. 7 - Prob. 4CQCh. 7 - Prob. 5CQCh. 7 - Prob. 6CQCh. 7 - Prob. 7CQCh. 7 - Prob. 8CQCh. 7 - Prob. 9CQCh. 7 - Prob. 10CQ
Ch. 7 - Prob. 11CQCh. 7 - Prob. 12CQCh. 7 - Prob. 13CQCh. 7 - Prob. 14CQCh. 7 - Prob. 1PACh. 7 - Prob. 2PACh. 7 - Prob. 3PACh. 7 - Prob. 4PACh. 7 - Sarahs Organic Soap Company makes four kinds of...Ch. 7 - Prob. 6PACh. 7 - Prob. 7PACh. 7 - Bruno Fruscalzo decided to set up a small...Ch. 7 - Prob. 9PACh. 7 - Prob. 10PACh. 7 - Prob. 1CCh. 7 - Prob. 2CCh. 7 - Prob. 3CCh. 7 - Prob. 4C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- The Farm-4-Less tractor company produces a grain combine (GC) in addition to both a large (LT) and small size tractor (SM). Its production manager desires to produce to customer demand using a mixed-model production line. The current sequence of production, which is repeated 30 times during a shift, is SM-GC-SM-LT-SM-GC-LT-SM. A new machine isproduced every 2 minutes. The plant operates two 8-hour shifts. There is no downtime because the 4 hours between each shift are dedicated to maintenance and restocking raw material. Based on this information, answer the following questions.a. How long does it take the production cycle to be completed?b. How many of each type of machine does Farm-4-Less produce in a shift?arrow_forwardMrs. Freddy Mitchell, in her lecture, stated that a transaction processing system (TPS) is software that ensures the completion of business transactions and keeps track of those business transactions. An online transaction processing system (OTPS) is an equivalent system that online merchants use for e-commerce. The TPS ensures that each transaction is successful by storing, sending, and receiving information via a database. She added that because the process is lengthy, it is broken down into cycles, which are broken further into systems and subsystems. Zara- Lee, a participant in Mrs. Freddy Mitchell’s Lecture series, got confused as Mrs. Freddy Mitchell began to elaborate on the many different systems, and Zara- Lee mentioned to YOU that she is experiencing information overload. YOU then responded that Mrs. Freddy Mitchell’s explanation was clear and concise, and YOU would explain the revenue cycle, its components, and the sub-systems that constitute that cycle after class.…arrow_forwardA company wants to store the following seven SKUs so there is 100% accessibility.Items are stored on pallets that are stored four high.a. How many pallet positions are needed?b. What is the cube utilization? c. If the company bought racking for storing the pallets, how many pallet positionsare needed to give 100% accessibility?arrow_forward
- An electronics firm produces two models of pocket calculators: the A-100 (A), which is an inexpensive four-function calculator, and the B-200 (B), which also features square root and percent functions. Each model uses one (the same) circuit board, of which there are only 2,500 available for this week's production. Also, the company has allocated a maximum of 800 hours of assembly time this week for producing these calculators, of which the A-100 requires 15 minutes (.25 hours) each, and the B-200 requires 30 minutes (.5 hours) each to produce. The firm forecasts that it could sell a maximum of 4,000 A- 100's this week and a maximum of 1,000 B-200's. Profits for the A-100 are $1.00 each, and profits for the B-200 are $4.00 each. What is the objective function? What is the assembly time constraint (in hours)? Which of the following is not a feasible production/sales combination? What are optimal weekly profits?arrow_forwardAn Soda company sells about 400 gallons of its highly demanded beverage each week. The estimated cost to store as well maintain one gallon of this product is $0.50 per week. Each time the Soda company places an order from its supplier, the following costs are incurred, independent of the size of the order: a $300 delivery fee, $50 unloading and storage, and a $60 transaction fee. Once an order is placed, it arrives exactly 2 work days later. The Soda company, supplier, and delivery carrier all operate 7 days per week. Question: What is the optimal (s,Q) policy?arrow_forwardHilliard Electronics produces specially coded computer chips for laser surgery in 64MB, 256MB, and 512MB sizes. (1MB means that the chip holds 1 million bytes of information.) To produce a 64MB chip requires 8 hours of labor, a 256MB chip takes 13 hours, and a 512MB chip requires 16 hours. Hilliard’s monthly production capacity is 1,200 hours. Mr. Blank, the firm’s sales manager, estimates that the maximum monthly sales of the 64MB, 256MB, and 512MB chips are 40, 50, and 60, respectively. The company has the following goals (ranked in order from most important to least important): 1. Fill an order from the best customer for thirty 64MB chips and thirty-five 256MB chips. 2. Provide sufficient chips to at least equal the sales estimates set by Mr. Blank. 3. Avoid underutilization of the production capacity. Formulate this problem using goal programmingarrow_forward
- Problem 14-17 (Algo) Meritor, a company that makes muffler assemblies for the automotive industry, is committed to the use of kanban to pull material through its manufacturing cells. Meritor has designed each cell to fabricate a specific family of muffler products. Fabricating a muffler assembly involves cutting and bending pieces of pipe that are welded to a muffler and a catalytic converter. The mufflers and catalytic converters are pulled into the cell based on current demand. The catalytic converters are made in a specialized cell. Catalytic converters are made in batches of 15 units and are moved in special hand carts to the fabrication cells. The catalytic converter cell is designed so that different types of catalytic converters can be made with virtually no setup loss. Meritor hires a team of consultants. The consultants suggest a partial robotic automation as well as the safety stock to be 15 percent. Meritor implements these suggestions. The result is an increase in…arrow_forwardThis is the time that it takes a unit to travel through theprocess from beginning to end. It includes time waitingin queues and buffers.arrow_forwardGiven a transfer function (first order-assume any) and unit impulse. Explain the influence of Proportional controller on rise time.arrow_forward
- A small mail order firm Seas Beginnings has one phoneline. An average of 60 people per hour call in orders, and ittakes an average of 1 minute to handle a call. Time between calls and time to handle calls are exponentially distributed.If the phone line is busy, Seas Beginnings can put up toc 1 people on hold. If c 1 people are on hold, a callergets a busy signal and calls a competitor (Air End). SeasBeginnings wants only 1% of all callers to get a busy signal. How many people should the company be able to put onhold?arrow_forwardThe seasonal yield of olives in a Piraeus, Greece, vineyard is greatly influenced by a process of branch pruning. If olive trees are pruned every two weeks, output is increased. The pruning process, however, requires considerably more labor than permitting the olives to grow on their own and results in a smaller size olive. It also, though, permits olive trees to be spaced closer together. The yield of 1 barrel of olives by pruning requires 5 hours of labor and 1 acre of land. The production of a barrel of olives by the normal process requires only 2 labor hours but takes 2 acres of land. An olive grower has 250 hours of labor available and a total of 150 acres for growing. Because of the olive size difference, a barrel of olives produced on pruned trees sells for $20, whereas a barrel of regular olives has a market price of $30. The grower has determined that because of uncertain demand, no more than 40 barrels of pruned olives should be produced. Use graphical LP to find (a) the…arrow_forwardLaredo Leather Company’s production manager, Jack Murray, has been under pressure from the company president to reduce the cost of conversion. In spite of several attempts to reduce conversion costs, they have remained more or less constant. Now Murray is faced with an upcoming meeting with the company president, at which he will have to explain why he has failed to reduce conversion costs. Murray has approached his friend, Jeff Daley, who is the corporate controller, with the following request: “Jeff, I’m under pressure to reduce costs in the production process. There is no way to reduce material cost, so I’ve got to get the conversion costs down. If I can show just a little progress in next week’s meeting with the president, then I can buy a little time to try some other cost-cutting measures I’ve been considering. I want you to do me a favor. If we raise the estimate of the percentage of completion of October’s inventory to 60 percent, that will increase the number of equivalent…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,