a)

Summary Introduction

To determine: The capacity of the machine in boards per minute.

b)

Summary Introduction

To determine: The utilization of the machine.

c)

Summary Introduction

To determine: The average inventory of boards at the machine.

d)

Summary Introduction

To determine: The smallest batch size that does not constrain the flow rate of the process.

Blurred answer
Students have asked these similar questions
A Printed Circuit Board (PCB) machine installs integrated circuits onto a board. Before starting to produce a board, the PCB machine requires a 16-minute setup. Once in production, the PCB machine requires only 0.19 minute per board. a. Currently, the PCB machine produces 525 boards between setups. Given this operating process, what is the capacity of the PCB machine (in boards per min)? b. Currently, the PCB machine produces 525 boards between setups. Given this operating process, what is the utilization of the PCB machine? c. Say the PCB machine produces 400 boards s between setups and demand is 2 boards per minute. Given the operating process, what is the avergae inventory of boards anf the PCB machine? d. Demand for boards occurs at the rate of 2 boards per minute. What is the smallest batch size such that the PCB machine does not constrain the flow rate through the process?
A graphics reproduction i rm has four units of equipment that are automatic but occasionallybecome inoperative because of the need for supplies, maintenance, or repair. Eachunit requires service roughly twice each hour, or, more precisely, each unit of equipmentruns an average of 30 minutes before needing service. Service times vary widely, rangingfrom a simple service (such as pressing a restart switch or repositioning paper) to moreinvolved equipment disassembly. The average service time, however, is i ve minutes.Equipment downtime results in a loss of $20 per hour. The one equipment attendant ispaid $6 per hour.Using i nite queuing analysis, answer the following questions:a. What is the average number of units in line?b. What is the average number of units still in operation?c. What is the average number of units being serviced?d. The i rm is considering adding another attendant at the same $6 rate. Should the i rmdo it?
A copy machine is available 24 hours a day. On a typical day, the machine produces 113 Jobs. Each Job takes about 4 minutes on the machine, 2 minutes of which is processing time and 2 minute is setup time (logging in, defining the job). About 16 Percent of the Jobs need to be reworked, in which case the setup time and the processing time have to be repeated. The remainder of the time, the equipment is idle. What is the OEE of the equipment? (Round your percentage answer to 1 decimal place.) What is the OEE of the equipment? 0.2 percent
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,