Textbook Question
Chapter 7.S, Problem 14P
Klassen Toy Company, Inc., assembles two parts (parts 1 and 2) Part 1 is first processed at workstation A for 15 minutes per unit and then processed at workstation B for 10 minutes per unit Part 2 is simultaneously processed at workstation C for 20 minutes per unit Work stations Band C feed the parts to an assembler at workstation D, where the two parts are assembled The time at workstation D is 15 minutes.
- a. What 1s the bottleneck of th1s process?
- b. What is the hourly capacity of the process?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Why is it more efficient for the work cells to prepare “modules” and deliver them to the assembly line thanit would be to produce the component (e.g., interior upholstery) on the line?
The bill of materials shows all the parts required to make
Select one:
a work-in process inventory
b. the MPR
c.raw materials inventory
d.one item
1. Define and discuss the advantages and disadvantages the following Process Strategies:
Make-to-Stock
Make-to-Order
Assemble-to-Order
Chapter 7 Solutions
Operations Management
Ch. 7.S - Prob. 1DQCh. 7.S - Prob. 2DQCh. 7.S - Prob. 3DQCh. 7.S - How is actual, or expected, output computed?Ch. 7.S - Explain why doubling the capacity of a bottleneck...Ch. 7.S - Distinguish between bottleneck time and throughput...Ch. 7.S - Prob. 7DQCh. 7.S - Prob. 8DQCh. 7.S - Prob. 9DQCh. 7.S - Prob. 10DQ
Ch. 7.S - Explain how net present value is an appropriate...Ch. 7.S - Prob. 12DQCh. 7.S - What are the techniques available to operations...Ch. 7.S - Amy Xias plant was designed to produce 7,000...Ch. 7.S - For the past month, the plant in Problem S7.1,...Ch. 7.S - If a plant has an effective capacity of 6,500 and...Ch. 7.S - Prob. 4PCh. 7.S - Material delays have routinely limited production...Ch. 7.S - Prob. 6PCh. 7.S - Southeastern Oklahoma State Universitys business...Ch. 7.S - Under ideal conditions, a service bay at a Fast...Ch. 7.S - A production line at V. J. Sugumarans machine shop...Ch. 7.S - A work cell at Chris Ellis Commercial Laundry has...Ch. 7.S - The three-station work cell Illustrated in Figure...Ch. 7.S - The three-station work cell at Pullman Mfg., Inc....Ch. 7.S - The Pullman Mfg., Inc., three-station work cell...Ch. 7.S - Klassen Toy Company, Inc., assembles two parts...Ch. 7.S - Prob. 15PCh. 7.S - Prob. 16PCh. 7.S - Markland Manufacturing intends to increase...Ch. 7.S - Using the data in Problem S7.17. a. What is the...Ch. 7.S - Given the data in Problem S7.17, at what volume...Ch. 7.S - Janelle Heinke, the owner of HaPeppas!, is...Ch. 7.S - Prob. 21PCh. 7.S - Prob. 22PCh. 7.S - Prob. 23PCh. 7.S - Prob. 24PCh. 7.S - Prob. 25PCh. 7.S - As a prospective owner of a club known as the Red...Ch. 7.S - Prob. 27PCh. 7.S - James Lawsons Bed and Breakfast, in a small...Ch. 7.S - Prob. 33PCh. 7.S - Prob. 34PCh. 7.S - Prob. 35PCh. 7.S - What is the present value of 5,600 when the...Ch. 7.S - Prob. 37PCh. 7.S - Prob. 38PCh. 7.S - Bolds Gym, a health club chain, is considering...Ch. 7.S - Prob. 1VCCh. 7.S - Prob. 2VCCh. 7.S - Prob. 3VCCh. 7 - What is process strategy?Ch. 7 - Prob. 2DQCh. 7 - Prob. 3DQCh. 7 - What is process redesign?Ch. 7 - Prob. 5DQCh. 7 - Name the tour quadrants of the service process...Ch. 7 - Prob. 7DQCh. 7 - Prob. 8DQCh. 7 - Identify manufacturing firms that compete on each...Ch. 7 - Identify the competitive advantage of each of the...Ch. 7 - Prob. 11DQCh. 7 - Identify the competitive advantage of each of the...Ch. 7 - Prob. 13DQCh. 7 - Prob. 14DQCh. 7 - Prob. 15DQCh. 7 - Explain what a flexible manufacturing system (FMS)...Ch. 7 - Prob. 17DQCh. 7 - Prob. 18DQCh. 7 - Prepare a flowchart tor one of the following: a....Ch. 7 - Prob. 14PCh. 7 - Prepare a time-function map for one of the...Ch. 7 - Prepare a service blueprint for one of the...Ch. 7 - Prob. 1PCh. 7 - Prob. 2PCh. 7 - Prob. 3PCh. 7 - Prob. 4PCh. 7 - Prob. 5PCh. 7 - Ski Boards, Inc., wants to enter the market...Ch. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Using Figure 7.6 in the discussion of value-stream...Ch. 7 - Metters Cabinets, Inc., needs to choose a...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Registration at Southern University has always been a time of emotions, commotions and lines. students must move among 4 stations to complete the process. last semester's registration is in fig. 9.20. 450 students moved from the paperwork station (A) to advising (B) and 550 students went directly from (A) to pick up class cards (C). preregistered graduate students went directly to pay (D). A to D is in a linear fashion and the distance from A to B, B to C and C to D is 30feet. a. calculate the movement cost or 'load x distance' of the layout b. provide an improved layout and provide its movement costarrow_forwardExplain what are the risks of automating a production process and what are the risks for a service process?arrow_forwardThe following diagram represents a process where two components are made at stations A1 and A2 (one component is made at A1 and the other at A2). These components are then assembled at station B and moved through the rest of the process, where some additional work is completed at stations C, D, and E. Assume that one and only one person is allowed at each station. Assume that the times given for each station represent the amount of work that needs to be done at that station by that person, with no processing time variation. Assume that inventory is not allowed to build in the system. What is the average hourly output of the process when it is in normal operation?arrow_forward
- The diagram below represents a process where two components are made at stations A1 and A2 (one component is made at A1 and the other at A2). These components are then assembled at station B and moved through the rest of the process, where some additional work is completed at stations C, D, and E. Assume that one and only one person is allowed at each station. Assume that the times given below for each station represent the amount of work that needs to be done at that station by that person, with no processing time variation. Assume that inventory is not allowed to build in the system. Al 0.3 min. A2 0.4 min. B 0.75 min. D 0.65 min. 0.60 min. E 0.55 min. What is the average hourly output of the process when it is in normal operation? Average hourly output unitsarrow_forwardThe diagram below represents a process where two components are made at stations A1 and A2 (one component is made at A1 and the other at A2). These components are then assembled at station B and moved through the rest of the process, where some additional work is completed at stations C, D, and E. Assume that one and only one person is allowed at each station. Assume that the times given below for each station represent the amount of work that needs to be done at that station by that person, with no processing time variation. Assume that inventory is not allowed to build in the system. A1 0.30 min. B 0.75 min. 0.65 min. 0.90 min. 0.55 min. A2 0.40 min. What is the average hourly output of the process when it is in normal operation? (Round your answer to the nearest whole number.) Average hourly output unitsarrow_forwardDave Grubbs of Grubbs Auto Body has five cars waiting for Economy Detailing. An Economy Detailing consists of a wash and then a hand wax. Cars cannot be waxed until they are washed. ROUND UP (39/5) & (39/10). Wash (hours) Wax (hours) (J)aguar 39/5 5 (C)adillac 5 3 (F)ord 1 39/10 (H)onda 2 1 (L)exus 4 4 What schedule produces the shortest time span in which these orders can be completed? Sequence: ____ , _____ , _____ , ______ , ______ Create a Gantt chart for the optimal sequence (shortest time span). How many hours does it take to complete the five orders? For the schedule in question “a”, how many hours is the waxing task idle? When will Dave finish the Cadillac? What is the average order completion time?arrow_forward
- A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). Q a) is the bottleneck. 6 units/hr Sawing 2.4 units/hr Sanding Drilling 2 units/hr Welding 5 units/hr Assembly 0.7 units/hr Assembly 0.7 units/hr Assembly 0.7 units/hr OUarrow_forwardTed Short, manager of procurement at the Lake Luna Medical Center (LLMC), is starting a process to examine at the general process that is followed at his center for procurement of medical supplies at his facility. His first step is to develop a flowchart for the current process that employees at his center follow. He has asked you to draw that flowchart for him and make any obvious changes to shorten the process. Here are the key steps that are followed: The LLMC employee fills out a paper requisition and sends that to his department head for approval. The department secretary first examines the requisition to see if all needed information is present. If it is, then she sends to the department head for approval. If not, she returns to the employee for any needed corrections. The employee then returns the requisition to the department secretary for review again. Requisitions with the correct information are sent to the department head. The department head reviews the item to determine…arrow_forwardCanine Kernels Company (CKC) manufactures two differenttypes of dog chew toys (A and B, sold in 1,000-count boxes)that are manufactured and assembled on three differentworkstations (W, X, and Y) using a small-batch process (seeFigure 5.12). Batch setup times are negligible. The flowchartdenotes the path each product follows through the manu-facturing process, and each product’s price, demand perweek, and processing times per unit are indicated as well.Purchased parts and raw materials consumed during pro-duction are represented by inverted triangles. CKC can makeand sell up to the limit of its demand per week; no penaltiesare incurred for not being able to meet all the demand. Eachworkstation is staffed by a worker who is dedicated to workon that workstation alone, and is paid $6 per hour. Totallabor costs per week are fixed. Variable overhead costs are$3,500/week. The plant operates one 8-hour shift per day, or40 hours/week. Which of the three workstations, W, X, or Y,has the highest…arrow_forward
- A process sheet is a type of:Group of answer choices bill of material. route sheet. work order. assembly chart. assembly drawing.arrow_forwardWhat is the advantage of a simple segmentation that does not require loading all of the segments of a process by including the nonresident segments automatically when needed?arrow_forwardEach A (finished product) requires 1 of component B and 2 of component C. Each B requires 2 of part D and 1 of part E and each C requires 1 of part D and 1 of part F.If the demand for product A is 50 units., and there are 15 units of B on hand and 50 units of C, how many units of Part D will be needed?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY