find the mximum possible order of S5
The dependencies between the 10 activities listed in the table above are as follows:• The project starts with two activities—A, and B—which can be done concurrently.• When activity A is finished, activity C can start• When activity B is finished, activities D and E can start• When both activities C and D are finished, activity F can start• When activity E is finished, activity G can start• When activity F is finished, activity H can start• When both activities G and H are finished, activity I can start• When activity G is finished, activity J can start• The project is complete when activities I and J are finished
Questions1. Organize the information above in an activity precedence table showing the activity, precedent and duration (calculated using the PERT weighted average formula and round to the nearest integer).2. Draw an AON network diagram and calculate its early start, early finish, late start and late finish times, floats (Free and total) for each activity. Make sure you…
Anela is a computer scientist who is formulating a large and complicated program for a type of data processing. She has three ways of storing and retrieving data: cloud storage, disk, or hard drive. As an experiment, she sets up her program in three different ways: one using cloud storage, one using disks, and the other using a hard drive. Then she makes four test runs of this type of data processing on each program. The time required to execute each program is shown in the following table (in minutes). Use a 0.01 level of significance to test the hypothesis that the mean processing time is the same for each method.
Hard Drive
Cloud
Disks
8.4
6.8
7.2
9.3
9.6
6.8
8.1
7.0
9.6
8.3
7.9
8.6
(ii) Find the sample test statistic. (Round your F Ratio to two decimal places. Round all other answers to four decimal places.)
(vi) In the case of one-way ANOVA, make a summary table. (Round your answers to three decimal places.)
Chapter 8 Solutions
EXCURSIONS IN MODERN MATH. >ANNOT.<
Ch. 8 - For the digraph shown in Fig. 8-25, find a.the...Ch. 8 - For the digraph shown in Fig. 8-26, find Figure...Ch. 8 - For the digraph in Fig. 8-25, find a.all path of...Ch. 8 - For the digraph in Fig. 8-26, find a.a path of...Ch. 8 - For the digraph in Fig. 8-25, find a.all cycles of...Ch. 8 - For the digraph in Fig. 8-26, find a.all cycles of...Ch. 8 - Prob. 7ECh. 8 - For the digraph in Fig.8-26, find a.all vertices...Ch. 8 - a.Draw a digraph with vertex-set V={A,B,C,D} and...Ch. 8 - a.Draw a digraph with vertex-set V={A,B,C,D} and...
Ch. 8 - Prob. 11ECh. 8 - Consider the digraph with vertex-set V={V,W,X,Y,Z}...Ch. 8 - Prob. 13ECh. 8 - Prob. 14ECh. 8 - Prob. 15ECh. 8 - A mathematics textbook consists of 10 chapters....Ch. 8 - Prob. 17ECh. 8 - The digraph in Fig. 8-29 is an example of a...Ch. 8 - Prob. 19ECh. 8 - Wobble, a start-up company, is developing a search...Ch. 8 - A project consists of eight tasks labeled A...Ch. 8 - A project consists of eight tasks labeled A...Ch. 8 - Prob. 23ECh. 8 - Prob. 24ECh. 8 - Prob. 25ECh. 8 - A ballroom is to be set up for a large wedding...Ch. 8 - Prob. 27ECh. 8 - Prob. 28ECh. 8 - Exercises 29 through 32 refer to a project...Ch. 8 - Exercises 29 through 32 refer to a project...Ch. 8 - Prob. 31ECh. 8 - Exercises 29 through 32 refer to a project...Ch. 8 - Prob. 33ECh. 8 - Exercises33 and 34 refer to the Martian Habitat...Ch. 8 - Prob. 35ECh. 8 - Prob. 36ECh. 8 - Prob. 37ECh. 8 - Using the priority list G,F,E,D,C,B,A, schedule...Ch. 8 - Prob. 39ECh. 8 - Using the priority list G,F,E,D,C,B,A, schedule...Ch. 8 - Prob. 41ECh. 8 - Prob. 42ECh. 8 - Prob. 43ECh. 8 - Use the decreasing-time algorithm to schedule the...Ch. 8 - Prob. 45ECh. 8 - Use the decreasing-time algorithm to schedule the...Ch. 8 - Prob. 47ECh. 8 - Consider the project described by the digraph...Ch. 8 - Consider the project described by the digraph...Ch. 8 - Consider the project described by the digraph...Ch. 8 - Consider the project digraph shown in Fig.8-40....Ch. 8 - Consider the project digraph shown in Fig.8-40....Ch. 8 - Prob. 53ECh. 8 - Consider the project digraph shown in Fig.8-41....Ch. 8 - Schedule the Apartments Unlimited project given in...Ch. 8 - Schedule the project given in Exercise26 Table8-5...Ch. 8 - Consider the project described by the project...Ch. 8 - Consider the project digraph shown in Fig.8-43,...Ch. 8 - Prob. 59ECh. 8 - Symmetric and totally asymmetric digraphs. A...Ch. 8 - Prob. 61ECh. 8 - Let W represent the sum of the processing times of...Ch. 8 - You have N=2 processors to process M independent...Ch. 8 - You have N=3 processors to process M independent...Ch. 8 - You have N=2 processor to process M+1 independent...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, subject and related others by exploring similar questions and additional content below.Similar questions
- Anela is a computer scientist who is formulating a large and complicated program for a type of data processing. She has three ways of storing and retrieving data: cloud storage, disk, or hard drive. As an experiment, she sets up her program in three different ways: one using cloud storage, one using disks, and the other using a hard drive. Then she makes four test runs of this type of data processing on each program. The time required to execute each program is shown in the following table (in minutes). Use a 0.01 level of significance to test the hypothesis that the mean processing time is the same for each method. Hard Drive Cloud Disks 8.8 7.5 7.1 8.8 9.2 6.6 8.0 7.2 10.2 7.6 7.9 8.0 (i) Give the value of the level of significance. (ii) Find the sample test statistic. (Round your F Ratio to two decimal places. Round all other answers to four decimal places.) (vi) In the case of one-way ANOVA, make a summary table. (Round your answers to three decimal places.)…arrow_forwardSuppose a company charges a premium of $150 per year for an insurance policy for storm damage to roofs. Actuarial studies show that in case of a storm, the insurance company will pay out an average of $8000 for damage to a composition shingle roof and an average of $12,000 for damage to a shake roof. They also determine that out of every 10,000 policies, there are 7 claims per year made on composition shingle roofs and 11 claims per year made on shake roofs. What is the company’s expected value (i.e., expected profit) per year of a storm insurance policy? What annual profit can the company expect if it issues 1000 such policies? Determine the probability of a composition shingle roof claim out of 10,000 = ______ Determine the probability of a shake roof claim out of 10,000 = ______ How many claims are made out of 10,000? = _______ What is the probability of no claims out of 10,000? = _______ How much does each shingle roof claim cost the company, don’t forget each person pays $150…arrow_forwardIn the production process of a company, 4 units of a certain input are used daily. It happens that the different formulations of this input can affect the yield of the process as well as the level of environmental pollution. On a given day the company has 40 units of this input in stock and they can be classified according to the table below:arrow_forward
- a pollster wnats to minimize the effect the order of the questions has on a person's response to a survey. how many different surveys are required to cover all possible arrangements if there are 9 questions on the survey?arrow_forwardconsidered a data 1,3,5,7,9,11,13,15,17,19,21,......81. how many iteration are required in linear searcharrow_forwarda) Final marks in Maria's Data Management class are based on 70% for term work, 15% for theexam, and 15% for the final course project. What term mark did Maria receive if her final markwas 90 and she received 85 on the exam and 97 on her final project? Show all working out. b)arrow_forward
- An educational software company wants to compare the effectiveness of its computer animation for teaching biology with that of a textbook presentation. The company gives a biology pretest to each of a group of high school juniors, and then divides them into two groups. One group uses the animation, and the other studies the test. The company retests all students and compares the increase in biology test scores in the two groups b. If the group using the computer animation has a much higher average increase in test scores than the group using the textbook, what conclusions, if any, could the company drawarrow_forwardA clinical test on humans of a new drug is normally done in three phases. Phase I is conducted with a relatively small number of healthy volunteers. For example, a phase I test of a specific drug involved only 88 subjects. Assume that we want to treat 88 healthy humans with this new drug and we have 1212 suitable volunteers available. Complete parts (a) through (c) below. a. If the subjects are selected and treated in sequence, so that the trial is discontinued if anyone displays adverse effects, how many different sequential arrangements are possible if 88 people are selected from the 1212 that are available? Choose the correct answer below. A. 19 comma 958 comma 40019,958,400 B. 40 comma 32040,320 C. 479 comma 001 comma 600479,001,600 D. 495495 b. If 88 subjects are selected from the 1212 that are available, and the 88 selected subjects are all treated at the same time, how many different treatment groups are possible? There are…arrow_forwardA coding supervisor has two full-time coders who average 35 productive hours per week. A standard of 20 minutes per chart has been established as the departmental coding standard. The facility anticipates an increase in the number of discharges since a new wing to the facility is nearing completion. It is anticipated that the number of discharges will increase to a total of 300 discharges to be coded per week. Will new staff be required and, if so, how many additional coders will be needed?arrow_forward
- It has been suggested that daily production of a subassembly would be increased if better lighting were installed and background music and free coffee and doughnuts were provided during the day. Management agreed to try the scheme for a limited time. A listing of the number of subassemblies produced per week before and after the new work environment for each employee follows. Employee Past Production Record Production after Installing, Lighting, Music, etc. JD 23 33 SB 26 26 MD 24 30 RCF 17 25 MF 20 19 UHH 24 22 IB 30 29 WWJ 21 25 OP 25 22 CD 21 23 PA 16 17 RRT 20 15 AT 17 9 QQ 23 Show your work, please. Thanks!arrow_forwardIt has been suggested that daily production of a subassembly would be increased if better lighting were installed and background music and free coffee and doughnuts were provided during the day. Management agreed to try the scheme for a limited time. A listing of the number of subassemblies produced per week before and after the new work environment for each employee follows. Employee Past Production Record Production after Installing, Lighting, Music, etc. JD 23 33 SB 26 26 MD 24 30 RCF 17 25 MF 20 19 UHH 24 22 IB 30 29 WWJ 21 25 OP 25 22 CD 21 23 PA 16 17 RRT 20 15 AT 17 9 QQ 23 30 FIND: State the decision rule and show your work: Reject H0 if T ≤ : Compute T and arrive at a decision (Show your work). T = ____________ , do not reject H0.arrow_forwardAnela is a computer scientist who is formulating a large and complicated program for a type of data processing. Anela has three ways of storing and retrieving data: cloud storage, disk, or hard drive. As an experiment, Anela sets up her program in three different ways: one using cloud storage, one using disks, and the other using a hard drive. Then Anela makes four test runs of this type of data processing on each program. The time required to execute each program is shown in the following table (in minutes). Use a 0.01 level of significance to test the hypothesis that the mean processing time is the same for each method. Hard Drive Cloud Disks 8.7 7.2 7.0 9.3 9.1 6.4 7.9 7.5 9.8 8.0 7.7 8.2arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Linear Algebra: A Modern IntroductionAlgebraISBN:9781285463247Author:David PoolePublisher:Cengage LearningAlgebra & Trigonometry with Analytic GeometryAlgebraISBN:9781133382119Author:SwokowskiPublisher:Cengage
Linear Algebra: A Modern Introduction
Algebra
ISBN:9781285463247
Author:David Poole
Publisher:Cengage Learning
Algebra & Trigonometry with Analytic Geometry
Algebra
ISBN:9781133382119
Author:Swokowski
Publisher:Cengage
Hypothesis Testing using Confidence Interval Approach; Author: BUM2413 Applied Statistics UMP;https://www.youtube.com/watch?v=Hq1l3e9pLyY;License: Standard YouTube License, CC-BY
Hypothesis Testing - Difference of Two Means - Student's -Distribution & Normal Distribution; Author: The Organic Chemistry Tutor;https://www.youtube.com/watch?v=UcZwyzwWU7o;License: Standard Youtube License