Textbook Question
Chapter 9, Problem 19P
Because of the expected high demand for Mach 10, Creative Leisure has decided to increase manufacturing time available to produce the Mach 10 (see Problem 9.17).
- a. If demand remained the same but 300 minutes were available each day on the assembly line, how many workstations would be needed?
- b. What would be the efficiency of the new system, using the actual number of workstations from (a)?
- c. What would be the impact on the system if 400 minutes were available?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
An assembly line made up of 10 operators currently operates with the following standard minute times at each workstation.
What is the efficiency of the line?
Workstation
Standard Minutes to Perform Operation
1
1.20
2
1.23
3
1.42
4
1.18
5
1.20
6
1.36
7
1.41
8
1.06
9
1.11
10
1.40
Don't copy from other websites.
Describe what is flow, space, in facility design?
Monique Food Processing Company produces light snacks that can be heated in a microwave. The following steps are included in the process:
Steps
Description
Capacity (Units/Hour)
1
Prepare food
200
2
Measure and place in plastic pouch
175
3
Prepare cardboard box
200
4
Insert pouch into box
300
5
Shrink-wrap box
200
What is the system capacity, and which is the bottleneck department?
How much slack (unused capacity) is available in other departments?
How much system capacity can be gained by adding capacity to the bottleneck?
What are the key factors that determine when to add capacity?
Why would an organization want to reduce its capacity?
Chapter 9 Solutions
Mylab Operations Management With Pearson Etext -- Access Card -- For Operations Management: Sustainability And Supply Chain Management (13th Edition)
Ch. 9 - Prob. 1EDCh. 9 - Prob. 1DQCh. 9 - Prob. 2DQCh. 9 - Prob. 3DQCh. 9 - Prob. 4DQCh. 9 - Prob. 5DQCh. 9 - Prob. 6DQCh. 9 - Prob. 7DQCh. 9 - Prob. 8DQCh. 9 - What are the requirements for a focused work...
Ch. 9 - Prob. 10DQCh. 9 - Prob. 11DQCh. 9 - Prob. 12DQCh. 9 - Prob. 13DQCh. 9 - Prob. 14DQCh. 9 - Prob. 15DQCh. 9 - Prob. 16DQCh. 9 - Explain the concept of cross-docking.Ch. 9 - What is a heuristic? Name several that can be used...Ch. 9 - Prob. 1PCh. 9 - Prob. 2PCh. 9 - Three departmentsmilling (M), drilling (D), and...Ch. 9 - Roy Creasey Enterprises, a machine shop, is...Ch. 9 - Prob. 5PCh. 9 - Prob. 6PCh. 9 - Prob. 7PCh. 9 - Six processes are to be laid out in six areas...Ch. 9 - Stanford Rosenberg Computing wants to establish an...Ch. 9 - Illinois Furniture, Inc., produces all types of...Ch. 9 - Sue Helms Appliances wants to establish an...Ch. 9 - The Action Toy Company has decided to manufacture...Ch. 9 - The following table details the tasks required for...Ch. 9 - Tailwind, Inc., produces high-quality but...Ch. 9 - Prob. 18PCh. 9 - Because of the expected high demand for Mach 10,...Ch. 9 - Prob. 20PCh. 9 - Suppose production requirements in Solved Problem...Ch. 9 - The preinduction physical examination given by the...Ch. 9 - Samuel Smith's company wants to establish an...Ch. 9 - Prob. 8PCh. 9 - Prob. 9PCh. 9 - Prob. 25PCh. 9 - Prob. 26PCh. 9 - Prob. 27PCh. 9 - Prob. 1CSCh. 9 - Prob. 2CSCh. 9 - Prob. 3CSCh. 9 - Prob. 4CSCh. 9 - Prob. 1.1VCCh. 9 - Prob. 1.2VCCh. 9 - Prob. 1.3VCCh. 9 - Prob. 1.4VCCh. 9 - Prob. 1.5VCCh. 9 - Prob. 1.6VCCh. 9 - Prob. 2.1VCCh. 9 - Prob. 2.2VCCh. 9 - Prob. 2.3VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- What are the benefits that the POI program can bring to Starwood? Canthese benefits be extended to other processes and properties within theStarwood system?arrow_forwardCalifornia Gardens, Inc., prewashes, shreds, and dis-tributes a variety of salad mixes in 2-pound bags. Doug Voss, Operations VP, is considering a new Hi-Speed shredder to replacethe old machine, referred to in the shop as “Clunker.” Hi-Speedwill have a fixed cost of $85,000 per month and a variable costof $1.25 per bag. Clunker has a fixed cost of only $44,000 permonth, but a variable cost of $1.75. Selling price is $2.50 per bag.a) What is the crossover point in units (point of indifference) forEric Limon/ Shutterstock the processes? b) What is the monthly profit or loss if the company changes tothe Hi-Speed shredder and sells 60,000 bags per month?c ) What is the monthly profit or loss if the company stays withClunker and sells 60,000 bags per month?arrow_forward(3) The following information is given about an assembly line. The desired output rate is 360 units per 8-hour day. Task Time (sec) Immediate Predecessor(s) A 30 - B 25 A C 40 A, B D 45 B E 25 B F 28 C, E G 16 D H 40 F, G a. How many stations are required for the most efficient balance you can achieve? b. Balance the line according to the most following tasks rule. c. What is the idle time per unit for your solution? d. Identify the bottleneck for your solution.arrow_forward
- A) Which step in this process is the bottleneck? =30 min for tan leather B) How many briefcases are processed at the bottleneck workstation per hour?=60/30=2 briefcases per hr C) What is the throughput time of the overall process?=30+15+10+10+10 Throughput = 75 minutes given the above information please answer qestions 1-3 below. If the manufacturing facility operates 8 hours per day, 250 days a year, what is the annual capacity of this manufacturing process. Assume the company decides to hire additional workers in order to duplicate the bottleneck step identified in part a so that there are 3 of these workstations instead of 1. Redraw the diagram showing the flow of the revised process. Answer parts a through d again based on the new process created in part e?arrow_forwardThe State department of motor vehicle, attempts toperform an analysis of the driver’s licence renewal operations. Inthe past each renewal process followed six steps to be performedand took one hour to finish. Calculate the daily productivity,assuming that the working time is eight hours per day.In an effort to improve performance, State department reengineered the whole process, i.e. eliminated some steps, merged someothers, etc. As a result the renewal time of each process droppedto half-hour. However, from time to time during the day, thereare some unexpected failures, which result in delays up to an hourper day. Has the modified process impact productivity?arrow_forwardDraw a process fl ow diagram of your last doctor’s offi cevisit. Identify bottlenecks. Did any activities occur in parallel?arrow_forward
- A production process consists of a three-step operation. The scrap rate is 14 percent for the first step and 8 percent for the other two steps. a. If the desired daily output is 492 units, how many units must be started to allow for loss due to scrap? (Do not round intermediate calculations. Round up your final answer to the next whole number.) b. If the scrap rate for each step could be cut in half at every operation, how many units would this save in terms of the scrap allowance? (Do not round intermediate calculations. Round up your final answer to the next whole number.) c. If the scrap represents a cost of $10 per unit, how much is it costing the company per day for the original scrap rate (i.e. the Part a scrap rate)? (Round your final answer to the nearest whole number.)arrow_forwardThe Sail-Sea is a boat manufacturer. The assembly location is available for production of 60 boats for240 minutes per day.Given the information in the table,c) What is the efficiency of the assembly lined) What is the idle time per boat producede) Assign the tasks to workstations using the most follower methodf) What is the maximum theoretical capacity this line can achieve in 240 minutes task performance time(min) task must follow task listed below a 1 - b 1 a c 2 a d 1 c e 3 c f 1 c g d, e, f h 2 b i 1 g, harrow_forwardwhat are a couple of real-life examples of design capacity, utilization, and efficiency in organizations?arrow_forward
- A small firm intends to increase the capacity of a bottleneck operation by adding a new machine. Two alternatives, A and B, have been identified, and the associated costs and revenues have been estimated. Annual fixed costs would be $36,000 for A and $31,000 for B; variable costs per unit would be $7 for A and $11 for B; and revenue per unit would be $18. a. Determine each alternative’s break-even point in units. (Round your answer to the nearest whole amount.) b. At what volume of output would the two alternatives yield the same profit (or loss)? (Round your answer to the nearest whole amount.) c. If expected annual demand is 15,000 units, which alternative would yield the higher profit (or the lower loss)?arrow_forwardA. Draw the appropriate network for this project b. What would the cycle time be if the goal is to produce 20 units per month (the plant operates 160 hours per month)? c. What is the number of workstations needed? d. Balance the process. e. What is the efficiency of the balanced processarrow_forwardAn assembly line is to be designed to operate 13 hours per day and supply a steady demand of 325 units per day. Here are the tasks and their performance times: TASK PRECEDINGTASKS PERFORMANCE TIME (SECONDS) TASK PRECEDINGTASKS PERFORMANCETIME (SECONDS) a — 48 g d 43 b — 58 h e 38 c — 73 i f 23 d a 63 j g 33 e b 88 k h, i 53 f c 23 l j, k 67 A) What is the efficiency of your line balance? B) Suppose demand increases by 10 percent. How would you react to this? Assume that you can operate only 13 hours per day in regular time. (Round your answers to the nearest whole number.)arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.
Process selection and facility layout; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=wjxS79880MM;License: Standard YouTube License, CC-BY