Mylab Operations Management With Pearson Etext -- Access Card -- For Operations Management: Sustainability And Supply Chain Management (13th Edition)
bartleby

Concept explainers

Question
Book Icon
Chapter B, Problem 25P
Summary Introduction

To solve: The following linear programming problem graphically.

Introduction:

Linear programming:

It is a linear optimization technique followed to develop the best outcome for the linear programming problem. The outcome might be to maximize profit, minimize cost, or to determine the optimal product mix. The outcome will take the constraints present in achieving the solution into consideration.

Iso-cost line method:

The iso-cost line method is a technique used to find the optimal solution of a linear programming problem. A parallel line is drawn and moved downward, towards the axis, until it touches the last corner point in the feasible region which has the lowest cost.

Blurred answer
Students have asked these similar questions
Assuming the following: Warehouse 1 has outbound goods volume - 2,500 units Warehouse 2 has outbound goods volume - 1,300 units Warehouse 3 has outbound goods volume - 5,000 units Given the assumptions and grid coordinates above, the following: d1x= 200, d2x= 300, d3x= 100, d1y= 50, d2y= 100, d3y= 150 And V1= 2,500, V2= 1,300, V3= 5,000 Which is equal to: Cx= (200 x 2,500) + (300 x 1,300) + (100 x 5,000) / (2,500 + 1,300 + 5,000) = 158 Cy= (50 x 2,500) + (100 x 1,300) + (150 x 5,000) / (2,500 + 1,300 + 5,000) = 114   Use the numerical example set up above to demonstrate how the centre of gravity location technique is used.
Solve the problem using Linear programming model formulations, slack variables, and graphical solutions to determine the optimal product mix that will maximize profit. A company produces two products,A and B, which have profits of 9.00 in product A and 7.00 in product B. Each unit of product must be processed on two assembly lines, where the required production times are as follows           Hours/unit Product Line 1 Line 2     A 12 4     B 4 8 Total Hours 60 40 What would be the effect on the optimal solution if the profit for product B was increased from 7.00 to 15.00? Solve with graphical solutions. What would be the effect on the optimal solution if the production time on line 1 was reduced to 40 hours? Solve with graphical solutions.
The Pee Tool Shop has four heavy presses it uses to stamp out prefabricated metal covers and housings for electronic consumer products. All four presses operate differently and are of different sizes. Currently the firm has a contract to produce three products. The contract calls for 400 units of product 1; 570 units of product 2; and 320 units of product 3. The time (in minutes) required for each product to be produced on each machine is as follows: Required: USE MS EXCEL BY SOLVING BE DETAILED WITH FORMULAS EXAMPLE (SUMPRODUCTB1:B2)
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Text book image
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Text book image
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Text book image
Business in Action
Operations Management
ISBN:9780135198100
Author:BOVEE
Publisher:PEARSON CO
Text book image
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Text book image
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.