To solve: The following linear programming problem graphically.
Introduction:
Linear programming:
It is a linear optimization technique followed to develop the best outcome for the linear programming problem. The outcome might be to maximize profit, minimize cost, or to determine the optimal product mix. The outcome will take the constraints present in achieving the solution into consideration.
Iso-cost line method:
The iso-cost line method is a technique used to find the optimal solution of a linear programming problem. A parallel line is drawn and moved downward, towards the axis, until it touches the last corner point in the feasible region which has the lowest cost.
Want to see the full answer?
Check out a sample textbook solutionChapter B Solutions
MyLab Operations Management with Pearson eText -- Access Card -- for Operations Management: Sustainability and Supply Chain Management
- Solve the linear programming problem. (If there is no solution, enter NO SOLUTION.) Minimize z = x + y Subject to 4x + y ≥ 50 x + 4y ≥ 50 x ≤ 23 y ≤ 23 Minimum value is z = at(x, y) = ( , )arrow_forwardThe following diagram represents a flow network. Each edge is labeled with its capacity, the maximum amount of stuff that it can carry. a. Formulate an algebraic model for this problem as a maximum flow problem. b. Develop a spreadsheet model and solve this problem. What is the optimal flow plan for this network? What is the optimal flow through the network?arrow_forwardA plant has sufficient capacity to manufacture any combination of four different products (A, B, C, D). For each product, time is required to be invested in four different machines, which is expressed in hours per kilogram of product, as shown in the following table as shown in the following table: (attached image) Each machine has an availability of 60 hours per week. Products A, B, C and D can be sold at $9, $7, $6 and $5per kilo, respectively. Variable labor costs are $2 per hour for machines 1 and 2, and $3 per hour for machines 3 and 4. The material costs for each kilogram of product A are $4. The material costs for each kilogram of products B, C, D and D are $4 each kilogram of products B, C and D are $1. What needs to be done:Formulate a profit-maximizing PL model given the maximum demand per product shown in the table (there are 16 variables). Note: The picture is in spanish, but I mean... is pretty easy to understandarrow_forward
- Show your step-by-step process using THE SPECIAL PURPOSE LINEAR PROGRAMMING: MODI TRANSPORTATION METHOD to solve this problem. XYZ Incorporated has received a contract to supply gravel to three new road projects located at three different locations. Project A needs 174 truckloads, Project B needs 204 truckloads, and Project C needs 143 truckloads. The company has three gravel warehouses located in three different places. Warehouse 1 has 158 truckloads available, warehouse 2 has 184, and warehouse 3 has 179. The cost of transportation from the warehouse to the projects are: from warehouse 1 to Projects A, B, C = Php 4, Php 8, Php 8 per truckload respectively. From warehouse 2 to Projects A, B, C = Php 16, Php 24, Php 16 per truckload respectively. From warehouse 3 to Projects A, B, C = Php 8, Php 16, Php 24 per truckload respectively. The objective is to design a plan of distribution that will Minimize the cost of transportation.arrow_forwardA plant has sufficient capacity to manufacture any combination of four different products (A, B, C, D). For each product, time is required to be invested in four different machines, which is expressed in hours per kilogram of product, as shown in the following table as shown in the following table: (attached image) Each machine has an availability of 60 hours per week. Products A, B, C and D can be sold at $9, $7, $6 and $5per kilo, respectively. Variable labor costs are $2 per hour for machines 1 and 2, and $3 per hour for machines 3 and 4. The material costs for each kilogram of product A are $4. The material costs for each kilogram of products B, C, D and D are $4 each kilogram of products B, C and D are $1. What needs to be done:Formulate a profit-maximizing PL model given the maximum demand per product shown in the table (there are 16 variables). Note: do the exercise by hand, or do it digitally, but not in excel.arrow_forwardFind the optimal solution to this linear programming problem. Min 3X+3Y s.t. 12X+4Y>=60 10X+5Y>=60 4X+8Y>=36 X,Y>=0 (X,Y) = ( )arrow_forward
- ACE Company uses a job-costing system at its Marikina plant. The plant has a Machining Department and an Assembly Department. Its job-costing system has two direct-cost catergories direct materials, and direct manufacturing labor) and two manufacturing overhead cost pools (the Machining Department, allocated using actual machine-hours, and the Assembly Department, allocated using actual direct manufacturing labor cost. The 2020 budget for the plant is as follows: Machining Dept. Assembly Dept. Manufacturing Overhead P 1 ,800,000 P 3,600,000 Direct Manufacturing Labor cost 1,400,000 2,000,000 Direct Manufacuring Labor-hours 100,000 200,000 Machine-hours 50,000 200,000 The company uses a budgeted overhead rate for allocating overhead to production orders on a machine-hour basis n Machining and on a direct…arrow_forwardInstructions: Solve using Excel Solver. Create the linear programming model and get the optimal solution to the problem. (Follow the steps and format in the photo below) 1. A company manufactures two products X1 and X2 on three machines A, B, and C. X1 requires 1 hour on machine A and 1hour on machine B and yields a revenue of Php 30. Product X2 requires 2 hours on machine A and 1 hour on machine B and 1 hour on machine C and yields revenue of PhP 50. In the coming planning period the available time of three machines A, B, and C are 2000 hours, 1500 hours and 600 hours respectively. Find the optimal product mix.arrow_forwardA firm operates two types of machines A and B as shown in the table. Type A Type B Maximum Space Available Floor Space Available 3 2 18 Number of Workers 5 3 30 The ratio of machines of type A to those of type B should be greater than one. Tasks Define the term linear programming Write down four inequalities to represent the information above. If the profit from using type A machine is Shs 6000 per hour and that of B is Shs 9000 per hour, write down the expression for the profit in terms of and Find the number of machines of each type that should be in operation to give the maximum profit. Hence find the maximum profit What advice do you give to this company’s managerarrow_forward
- Find the optimal solution to this linear programming problem. Min 5X + 6Y s.t. 3X + Y ≥ 15 X + 2Y ≥ 13 3X + 2Y ≥ 31 X, Y ≥ 0arrow_forwardSunseel Industries produces two types of raw materials, A and B, with a production cost of $4 and $8 per unit, respectively. The combined production of A and B must be at least 700 units per month. The factory is expected to produce at least 400 units of B and not more than 1200 units of A each month. The processing times for A and B are observed to be 5 hours and 4 hours, respectively. A total of 3000 production hours are available per month. Develop a linear program that Sunseel Industries can use to determine the number of units of each raw material to produce that will meet the demand and minimize the total cost.arrow_forwardA company manufactures two products Q and W on three machines A, B and C. Q requires 1 hrs on machine A, 1 hr on machine B and C and yields a revenue of USD 3. Product W requires 2 hrs on machine A and 1 hr on machine B and C and yields revenue of USD 5. In the comming period the available time of three machines A, B and C are 2000 hrs, 1500 hrs and 600 hrs respectively. Find the optimal product mix.arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.