Interpretation: The economic production lot size (ELS) is to be calculated.
Concept Introduction: ELS (economic production lot size) refers to lot size where total cost is minimum on consideration of balance between ordering cost and carrying cost
B
Interpretation: The setup cost and inventory holding cost per annum are to be calculated.
Concept Introduction: Setup is the cost to borne by the company for making ready of machinery to produce a fresh batch of goodsand inventory holding cost refers to costs associated with unsold stock
C
Interpretation: The TBO or cycle length for the ELS should be calculated.
Concept Introduction: TBO orcyclelength for ELS is division of ELS by demand
D
Interpretation: The production time per lot should be calculated.
Concept Introduction:Dividing lot size with production rate is production rate
Want to see the full answer?
Check out a sample textbook solutionChapter C Solutions
Operations Management: Processes and Supply Chains, Student Value Edition Plus MyLab Operations Management with Pearson eText -- Access Card Package (11th Edition)
- Arthur Meiners is the production manager of Wheel-Rite, a small producer of metal parts. Wheel-Rite supplies Cal-Tex, a larger assembly company, with 10,000 wheel bearings each year. This order has been stable for some time. Setup cost forWheel-Rite is $40, and holding cost is $.60 per wheel bearing per year. Wheel-Rite can produce 500 wheel bearings per day. Cal-Tex is a just-in-time manufacturer and requires that 50 bearings be shipped to it each business day.a) What is the optimum production quantity?b) What is the maximum number of wheel bearings that will be ininventory at Wheel-Rite?c) How many production runs of wheel bearings will Wheel-Ritehave in a year?d) What is the total setup 1 holding cost for Wheel-Rite?arrow_forwardNestle Ltd. produces its premium plant food in 50 Kg bags. Demand is 100,000 Kgs. per week and the plant operates 50 weeks each year Nestle can produce 250,000 Kgs. per week. The setup cost is OMR 200 and the annual holding cost rate is OMR 1 per bag What is the optimal (time) length of uptime in years? a 0.031 b. 0.039 C. 0.023 D. 0.033 E. None is correctarrow_forwardThe annual demand for the Super Thrive brand plant food manufactured by Cumberbatch and Dunst Indoor Plants Company is 120,000 pounds. The annual holding cost (also known as carrying charge) is $0.05 per pound, and Operations Manager Kirsten Benedict has calculated the cost of setting up machinery for making the plant food to be $20. 1) What is the annual holding (carrying) cost for the EOQ that you calculated ? plz send answer fast.arrow_forward
- Arthur Meiners is the production manager of WheelRite,a small producer of metal parts. Wheel-Rite supplies CaiTex,a larger assembly company, with 10,000 wheel bearings eachyear. This order has been stable for some time. Setup cost forWheel-Rite is $40, and holding cost is $.60 per wheel bearing peryear. Wheel-Rite can produce 500 wheel bearings per day. CalTexis a just-in-time manufacturer and requires that 50 bearingsbe shipped to it each business day.a) What is the optimum production quantity?b) What is the maximum number of wheel bearings that will be in inventory at Wheel-Rite?c) How many production runs of wheel bearings will Wheel-Rite have in a year?d) What is the total setup + holding cost for Wheel-Rite?arrow_forwardArthur Meiners is the production manager of Wheel-Rite, a small producer of metal parts. Wheel-Rite supplies Cal-Tex, a larger assembly company, with 9,700 wheel bearings each year. This order has been stable for some time. Setup cost for Wheel-Rite is $39, and holding cost is $0.60 per wheel bearing per year. Wheel-Rite can produce 450 wheel bearings per day. Cal-Tex is a just-in-time manufacturer and requires that 48 bearings be shipped to it each business day. a) What is the optimum production quantity?units (round your response to the nearest whole number).arrow_forwardA local company produces an erasable programmable read-only memory (EPROM) for severalindustrial clients. It has experienced a relatively flat demand of 2,500 units per year for theproduct. The EPROM is produced at a rate of 10,000 units per year. The accounting departmenthas estimated that it costs $50 to initiate a production run, each unit costs the company $2 tomanufacture, and the cost of holding is based on a 30 percent annual interest rate. Determinethe optimal size of a production run, the length of each production run, and the average annualcost of holding and setup. What is the maximum level of the on-hand inventory of the EPROMs?arrow_forward
- Arthur Meiners is the production manager of Wheel-Rite, a small producer of metal parts. Wheel-Rite supplies Cal-Tex, a larger assembly company, with 11,200 wheel bearings each year. This order has been stable for some time. Setup cost for Wheel-Rite is $39, and holding cost is $0.50 per wheel bearing per year. Wheel-Rite can produce 510 wheel bearings per day. Cal-Tex is a just-in-time manufacturer and requires that 51 bearings be shipped to it each business day. a) What is the optimum production quantity? 1393 units (round your response to the nearest whole number). b) What is the maximum number of wheel bearings that will be in inventory at Wheel-Rite? units (round your response to the nearest whole number).arrow_forwardArthur Meiners is the production manager of Wheel-Rite, a small producer of metal parts. Wheel-Rite supplies Cal-Tex, a larger assembly company, with 11,200 wheel bearings each year. This order has been stable for some time. Setup cost for Wheel-Rite is $39, and holding cost is $0.50 per wheel bearing per year. Wheel-Rite can produce 510 wheel bearings per day. Cal-Tex is a just-in-time manufacturer and requires that 51 bearings be shipped to it each business day. a) What is the optimum production quantity? response to the nearest whole number). units (round yourarrow_forwardA shop that makes candles offers a scented candle, which has a monthly demand of 500 boxes. Candles can be produced at a rate of 47 boxes per day. The shop operates 20 days a month. Assume that demand is uniform throughout the month. Setup cost is $61 for a run, and holding cost is $8 per box on a monthly basis. Determine the the economic run size: a. 60 b. 128 c. 88 d. 187arrow_forward
- Arthur Meiners is the production manager ofWheel-Rite, a small producer of metal parts. Wheel-Rite supplies Cal-Tex, a larger assembly company, with 10,000 wheelbearings each year. This order has been stable for some time.Setup cost for Wheel-Rite is $40, and holding cost is $.60 perwheel bearing per year. Wheel-Rite can produce 500 wheel bearings per day. Cal-Tex is a just-in-time manufacturer andrequires that 50 bearings be shipped to it each business day.a) What is the optimum production quantity?b) What is the maximum number of wheel bearings that willbe in inventory at Wheel-Rite?c) How many production runs of wheel bearings will WheelRite have in a year?d) What is the total setup 1 holding cost for Wheel-Rite?arrow_forward1. A service station uses 2500 oil filters during the course of a year, and this usage is constant throughout the year. These oil filters are purchased from a supplier 100 miles away for $15 each, and the lead time is 2 days. The holding cost per oil filter per year is $1.50 (or 10% of the unit cost) and the ordering cost is $18.75. There are 250 working days per year. A) the service manager recognizes that although he knows the lead time is 2 days, the average daily demand usually varies. He kept records and has determined that the average daily demand is normally distributed with a standard deviation of 2.5 units. If he would like to maintain a service level of 90%, what should his re-order point be?arrow_forwardArthur Meiners is the production manager of Wheel-Rite, a small producer of metal parts. Wheel-Rite supplies Cal-Tex, a larger assembly company, with 9,600 wheel bearings each year. This order has been stable for some time. Setup cost for Wheel-Rite is $41, and holding cost is $0.70 per wheel bearing per year. Wheel-Rite can produce 490 wheel bearings per day. Cal-Tex is a just-in-time manufacturer and requires that 52 bearings be shipped to it each business day. a) What is the optimum production quantity? units (round your response to the nearest whole number).arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.