Question
Chapter C, Problem 5P
Summary Introduction
To determine: The total cost of the given transportation problem.
Introduction: The major objective of the transportation problem is to minimize the distributing cost of a product from a source to an origin. Transportation problem is one of the type of linear programming.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Problem 1.9
Question Help ▼
Brown's, a local bakery, is worried about increased costs particularly energy. Last year's records can provide a fairly good estimate of the parameters for this year.
Wende Brown, the owner, does not believe things have changed much, but she did invest an additional $2,500 for modifications to the bakery's ovens to make them
more energy efficient. The modifications were supposed to make the ovens at least 20% more efficient. Brown has asked you to check the energy savings of the new
ovens and also to look over other measures of the bakery's productivity to see if the modifications were beneficial. You have the following data to work with:
Last Year
Now
Production (dozen)
Labor (hours)
Capital Investment ($)
Energy (BTU)
1,600
1,600
350
320
15,000
17,500
2,800
3,000
or
Energy productivity increase = 7.14 % (enter your response as a percentage rounded to two decimal places and include a minus sign if necessary).
Capital productivity increase =
(enter your…
Question-1- Read the scenario and answer the question below. Use separate heading to answer each point. The maximum limit of words-count in each part is 300 words:
“When demand for future resources is expected to decrease, the company can start to plan ways to shed the capacity so that it will not be burdened with significant excess capacity in future quarters”.
Identify the strategy of capacity to be used by the company. State the reason to choose the strategy.
Explain the scenario in the context of Resource Planning. How this will be reflected in Annual Operations plan.
Question 5The management of CDC Construction Pioneers have decided to build 900 new apartments in the Kasoa area due to the influx of immigrant workers into the country. Two Architectural Companies have provided building plans and technical schematics for the project. Management are happy with the proposals of both Standard apartment and Deluxe apartment. After investigating the steps involved in construction, management determined that each apartment complex built will require some resources. Management analysed each of the bids and concluded that if the plans of Standard apartment are built, it requires 0.7 days in foundation works, 0.5 days in the masonry, 1 day in finishing, and 0.1 days in painting works. Deluxe apartment will require 1 day in foundation works, 0.83 days in the masonry, 0.67 days in finishing, and 0.25 days in the painting works. Management estimate that, 630 days for foundation works, 600 days for masonry, 708 days for finishing and 135 days for 11painting works…
Chapter C Solutions
Operations Management
Ch. C - Question: 1. What are the three information needs...Ch. C - Question: 2. What are the steps in the intuitive...Ch. C - Prob. 3DQCh. C - Prob. 4DQCh. C - Prob. 5DQCh. C - Prob. 6DQCh. C - Prob. 7DQCh. C - Prob. 8DQCh. C - Prob. 9DQCh. C - Prob. 10DQ
Ch. C - Prob. 11DQCh. C - Prob. 12DQCh. C - Prob. 13DQCh. C - Prob. 1PCh. C - Question: C.2 Consider the transportation table...Ch. C - Prob. 3PCh. C - Prob. 4PCh. C - Prob. 14PCh. C - Prob. 5PCh. C - Question: C.7 The three blood banks in Seminole...Ch. C - Question: C.8 In Solved Problem C 1 (page 728),...Ch. C - Question: C.9 For the following Gregory Bier...Ch. C - Prob. 8PCh. C - Prob. 9PCh. C - Prob. 10PCh. C - Question: C.12 Dana Johnson Corp. is considering...Ch. C - Prob. 1CS
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Question 2: Consider the following model: Minimize Z = 3x, + 2x2, subject to 2r, + x2 2 10 -3x, + 2x2 s 6 2 6 X1 + X2 and X, 2 0, X2 2 0. Part a) Solve it using graphical technique. Part b) Write its dual model and explain how we can find dual optimal solutions from primal solutions.arrow_forwardquestion: By how much can I increase the profit per Small Sofa before the solution shifts to another corner point?arrow_forwardQUESTION ONE A) Use graphical methodto solve following LP problem. Maximize z = 2x, + x subiect to the constraints X,+ 2x, < 10 x, + 2x, S1 B)Jse the penalty (Big - M) method to solve the following LP problem. Minimize Z = x, + 2x, + 3x, - x subject to the constraints X1+ 2x, + 3x3 = 15 2x1 + 2x, +5x = 20 X1 + 2x, + x3 +x = 10arrow_forward
- QUESTION THREEGiven the LP below:a) Solve the problem using big M-methodMinimize Z = 3X1 +4X2s.t 4X1 + X2 ≥ 30−X1 − 4X2 ≤ −184X1 + 3X2 ≥ 28X1, X2, ≥ 0arrow_forwardQuestion 9 ADM Security Consultants is a small security service company, whose specialty is providing security on a short term basis for single events such as concerts. The company has an offsite technical team of operators that back up the security personnel that are onsite The following table shows the staffing requirements of the technical team on each day of the week. These operators work long hours and management.wishes to create a staffing schedule that ensures each operator gets two consecutive days off. Schedule each operator, guaranteeing two consecutive days off MO TUE WED THUR FRI SAT SUN Requirement 2. 4. 2arrow_forwardQUESTION 6 1 pc In the simplex method, if there is a tie (equality) between decision variable and a slack (or surplus) variable in C-Z row for a maximization LP, selected. should be O decision variable O Slack variable O Any variable with highest posative value O surplus variablearrow_forward
- Question 1. Busch Gardens Sweets is preparing for the Halloween rush. They prepare two sizes of Peanut/Raisin Ghoulish Delight and need to calculate how many bags of deluxe and standard mixes they can produce. • The deluxe mix takes 0.9 of a pound of raisins and 0.4 of a pound of peanuts.• The standard mix takes 0.7 of a pound of raisins and 0.6 of a pound of peanuts.The shop has 100 pounds of raisins and 70 pounds of peanuts. The profit on the deluxe mix is $1.80 and the standard mix profit is $1.60. The owner wants no more than 110 bags of each type prepared. Do not forget the non-negativity constraint and remember that you cannot sell partial bags (whole numbers only). Use Excel Solver Question 2. Take a screenshot (snip tool) of you excel spreadsheet and save it.arrow_forwardQuestion: B) Identify The Economic Order Quanitity And Consider The Implications For Making An Error In Calculating Economic Order Quanitity. This problem has been solved! See the answer b) Identify the economic order quanitity and consider the implications for making an error in calculating economic order quanitity.arrow_forwardQuestion 27 Variable cells Final Reduced Objective Allowable Allowable Value Cost Coefficient Increase Decrease Cell Name $B$6 Activity 1 0 425 500 1E+30 425 $C$6 Activity 2 27.5 0.0 300 500 300 $D$6 Activity 3 0 250 400 1E+30 250 Constraints Final Shadow Constraint Allowable Allowable Value Price R.H. Side Increase Decrease Cell Name $E$2 Benefit A 110 0 60 50 1E+30 $E$3 Benefit B 110 75 110 1E+30 46 $E$4 Benefit C 137.5 0 80 57.5 1E+30 If the coefficient for Activity 2 in the objective function changes to $400, then the objective function value: A) will increase by $100. B) will increase by $7,500. OC) will remain the same. D) will increase by $2,750.arrow_forward
- QUESTION THREE A) Use the simplex method to solve the following LP problem. Maximize Z = 3x, + 5x, + 4x, subiect to the constraints 2x, + 3x, < 8 2x, + 5x, < 10 3x, + 2x, + 4x3 S 15 B)Find the solution using two-phase method Minimize Z =x, + 2x, + 3x3 - x4 Subject to the constraints 5x, + 7x, +4x 57 -4x, +7x, + 5x, 2 -2 3x, + 4x, + 6x, 2 29/, CIWrite the dual ofthe following LP problem Maximize Z = x, + 2x, + 3x3 Subject to the constraints X1 + x2 + x3S 10 2x, - x2 - x3 < 2 2x, - 2x, - 3x, S6arrow_forwardQuestion 4 You are currently working on a project to be completed in 20 months. The budget of the project is R12 000 000. Six months have passed, and the schedule says that 30% of the work should be completed. To date R2 800 000 has been spent already, however on a closer review; you find that only 15% of work has been completed. 4.1. Calculate the project's Planned Value (PV). 4.2. Calculate the project's Earned Value (EV). 4.3. Calculate the project's Cost Variance (CV) and determine if the project is under budget or over budget. 4.4. Calculate the project's Schedule Variance (SV) and determine if the project is behind schedule or ahead of schedule.arrow_forwardQuestion 38 Pasensya Ka Na Ha God Bless Co., an investment company, is constructing a complex of four residential rental buildings that will have more than 100 units. The complex is in a geographic area that has a long rainy season. Which of the following steps would likely be most essential to monitoring and mitigating the risk of rain damage? a. Assuring compliance with local codes during construction b. Establish a reserve for capital expenditures, if needed c. Actively encouraging renters to report possible problems d. Monthly inspection by internal maintenance staff and annual assessment by external engineering firms Question 39 Which of the following is the best approach in assessing an organization's risk management approach? a. Consider multiple components of an organization's industry, culture, and objectives to determine the most effective risk management approach b. Find out what is the most common framework being used by competitors in the industry c.…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.