monday real estatte 2
.docx
keyboard_arrow_up
School
TAFE NSW - Sydney Institute *
*We aren’t endorsed by this school
Course
NURSING RE
Subject
Civil Engineering
Date
Feb 20, 2024
Type
docx
Pages
12
Uploaded by DukeLorisPerson1010
Skills assessment
Criteria
Unit code, name and release number
CPPREP4161 - Undertake pre-auction processes (1)
Qualification/Course code, name and release number
CPP41419 - Certificate IV in Real Estate Practice (1)
Student details
Student number
Student name
Assessment Declaration
This declaration only needs to be completed if you are not submitting your assessment online.
This assessment is my original work and no part of it has been copied from any other source except where due acknowledgement is made.
No part of this assessment has been written for me by any other person except where
such collaboration has been authorised by the assessor concerned.
I understand that plagiarism is the presentation of the work, idea or creation of another person as though it is your own. Plagiarism occurs when the origin of the material used is not appropriately cited. No part of this assessment is plagiarised.
Student signature and Date
Document title: CPPREP4161_AE_Sk_2of3_LMS
Page 1 of 12
Resource ID: TBS_19_001_CPPREP4161_AE_Sk_2of3_LMS
STUDENT NAME:
Version:
20200909
Date created:
3 July 2020
For queries, please contact:
Technology and Business Services
TAFE Ultimo © 2020 TAFE NSW, Sydney
RTO Provider Number 90003 | CRICOS Provider Code: 00591E
This assessment can be found in the: Learning Bank
The contents in this document are copyright © TAFE NSW 2020, and should not be reproduced without the permission of the TAFE NSW. Information contained in this document is correct at time of printing: 17 February
2024. For current information please refer to our website or your teacher as appropriate.
Document title: CPPREP4161_AE_Sk_2of3_LMS
Page 2 of 12
Resource ID: TBS_19_001_CPPREP4161_AE_Sk_2of3_LMS
STUDENT NAME:
Assessment instructions
Table 1 Assessment instructions
Assessment details
Instructions
Assessment overview
The objective of this assessment is to assess your skills as would be required to when preparing an on-site auction property for auction day.
Assessment Event number
2 of 3
Instructions for this assessment
This is a skill-based assessment and will be assessing you on your ability to demonstrate the skills required in the unit.
This assessment is in one part:
Part 1: Case study scenario
The assessment also contains an assessment feedback form.
Submission instructions
Where possible, complete and submit this assessment online via the TAFE NSW online learning platform. Upload all the required assessment files in the assessment area on the online learning platform.
Alternatively, hand all required assessment files to your assessor for marking. Make sure you have added your name to the bottom
of each page of the assessment.
It is important that you keep a copy of all electronic and hardcopy
assessments submitted to TAFE NSW and complete the assessment declaration when you submit the assessment.
What do I need to do to achieve a satisfactory result?
To achieve a satisfactory result for this assessment, you must complete all parts outlined in the assessment instructions.
What do I need to provide?
Computer with internet access and Microsoft Office. Document title: CPPREP4161_AE_Sk_2of3_LMS
Page 3 of 12
Resource ID: TBS_19_001_CPPREP4161_AE_Sk_2of3_LMS
STUDENT NAME:
Assessment details
Instructions
What will the assessor provide?
Access to this assessment and supporting online resources.
Due date and time allowed
Fully online students should refer to their Training Plan for due dates, other students should refer to the Unit Assessment Guide for due dates.
Indicative time to complete this assessment is approximately one hour.
Supervision
This assessment may be completed unsupervised.
You may access referenced text, learning notes and other resources.
Your assessor may ask for additional evidence to verify the authenticity of your submission and confirm that the assessment task was completed by you.
Assessment feedback, review or appeals
In accordance with the TAFE NSW policy Manage Assessment Appeals, all students have the right to appeal an assessment decision concerning how the assessment was conducted and the outcome of the assessment. Appeals must be lodged within 14 working days
of the formal notification of the result of the assessment. If you would like to request a review of your results or if you have
any concerns about your results, contact your teacher or head teacher. If they are unavailable, contact the student administration officer.
Appeals are addressed in accordance with Every Student’s Guide to Assessment.
Document title: CPPREP4161_AE_Sk_2of3_LMS
Page 4 of 12
Resource ID: TBS_19_001_CPPREP4161_AE_Sk_2of3_LMS
STUDENT NAME:
Specific task instructions
The instructions and the criteria in the tasks and activities below will be used by the assessor
to determine whether the tasks and activities have been satisfactorily completed. Use these instructions and criteria to ensure you demonstrate the required skills and knowledge.
Document title: CPPREP4161_AE_Sk_2of3_LMS
Page 5 of 12
Resource ID: TBS_19_001_CPPREP4161_AE_Sk_2of3_LMS
STUDENT NAME:
Your preview ends here
Eager to read complete document? Join bartleby learn and gain access to the full version
- Access to all documents
- Unlimited textbook solutions
- 24/7 expert homework help
Related Questions
Quality Engineering question
A Production Engineer working in Company A wants to maintain a Standard Operation Procedure (SOP) for the mobile phone assembly line and also monitor status of production (traveler). Please advise him the necessary documentation to do it and help him regarding the type of information the document and records should contain.
Please answer in your own words. please don't use handwriting. Thank you
arrow_forward
When is the final certificate issued?
arrow_forward
Writing Task Statements
Scenario 2:
You are putting together a job description based on several interviews, observations, and surveys. You are wondering about the level of detail at which you should write the task statements (TS) for the job description. Which one of the following statements provides the most practical level of detail for job evaluation purposes? Examine each TS and indicate why it is not practical.
Prepares architectural plans for all types of buildings and city projects.
Extends blueprint on a desk to study its content.
Writes electrical work specifications to prepare architectural projects.
arrow_forward
What are shop drawings and sample submittal requirements forms?
arrow_forward
Develop a construction project scenario of your own and prepare a report of 1000 words describing every steps of construction project planning ?
arrow_forward
Who monitors the shop drawings and submittals?
arrow_forward
Any recommended papers or txt books on this matter?
arrow_forward
Drawings had been received, each drawing only contains the main product drawn on it, the name of the draughtsperson and the date. Each drawing is folded in half then in half again, with the white paper on the outside:
- Suggest and justify improvements could be made to the folding and storing processes and document control as care and control procedures.
arrow_forward
One-page resume that can be used when you apply for your dream jobs after 3-4 years when you graduate in Civil Engineering.
arrow_forward
- Present a design proposal, utilising a selected alternative construction method, and explain how it is ‘fit for purpose’ in the given context.
1- Produce a design proposal, using computer-aided drawing tools, utilising alternative construction methods.
2- Present a design proposal that utilises alternative methods of construction.
3- Evaluate the effectiveness of using computer-aided drawing software and BIM.
4- Justify the use of a chosen alternative construction method.
arrow_forward
What is the Certificate of Completion?
arrow_forward
What are the similarities and dissimilarities between RFI and shop drawings and submittals?
arrow_forward
A practicing civil engineer attached his signature and seal on a set of construction plans and documents. However, on the day he attached his signature and seal, his professional license as a civil engineer has already expired the day before, and his application for renewal is still pending upon submission of some requirements for renewal. Is the signature and seal valid and acceptable? Explain.
arrow_forward
Engineering - Construction
Cost Estimating
arrow_forward
The introduction section of a proposal includes:
Select one:
o a. Report organization
b. All points mentioned
c. Statement of the problem
d. The background
arrow_forward
Given ann assessment on the role of the course in your education for CONSTRUCTION MATERIALS AND TESTING. No plagiarism and it must be not less than 10 sentences.
For strict compliance.
Thank you!
arrow_forward
Find and evaluate 2 (two) construction processes or technologies in your work or everyday life that have either a poor or a good design in relation to occupational safety and health or public safety and health. Present your findings considering the design aspects, the User Experience, changes you propose or the design aspects that promote good design, and other supporting information via a maximum 1-page report for each design. Pictures, checklists, and other supporting materials can be added as appendices and are unlimited.
NOTE: I NEED PICTURES AND REFERENCES TO THESE ANSWERS
arrow_forward
Can a graduate in civil engineering course sign plans and supervise construction projects, even though he/she did not pass the board exam? Explain.
arrow_forward
Discuss the various types of quality standards used in IT and construction projects.
arrow_forward
Write short notes on any two of the following:
PPRA
a)
b) DPR
arrow_forward
Part 1: Take-home and Viva activity related to topics covered in LO1.
|You work as a mechanical software engineer in a mechanical company which provides modelling and
design services for different types of mechanical applications. Your main tasks are to analyze and assess
different designs and obtain optimal solutions prior to any prototyping or manufacturing step. Your
direct manager assigned you to work on specific tasks for different running projects.
Project 1:
Simply supported beams are usually used in structures due to their high stability and performance in resisting
shear stress and bending moment, they are applied in variety of applications such as steel-frame used for
advertisement cars' chassis and bridges. Your role in a structure design company is to analyze and design the
bridge based on simply supported beam theory. Your manager asked you to calculate the distribution of shear
force, bending moment and stress đue to bending for bridge modeled as simply supported beam…
arrow_forward
1. A contractor is to construct a tank to contain water for his construction project, given that the needed dimension of the tank are height of 2.40 meters and diameter of 2.80 meters, how many sheets of GI sheet are to be purchased for the cylindrical surface of the tank since the contractor already made the top and bottom of the tank. A GI sheet has a dimension of width 1.20 meters and height 2.40 meters.
2. How many drums of water can be contained in the tank if a drum is equal to 200 liters?
3. Since the contractor loves the color green, how many cans of green paint is needed to paint the water tank on all sides including top and bottom if each can of paint covers 0.70 square meters.
arrow_forward
List at least 4 skills/knowledge of Home Maintenance/Construction
arrow_forward
Case study
The contractor received a submittal package from the curtain wall subcontractor. Per the specifications, product
data, shop drawings, finish samples, fabrication sample, product test reports, field test reports, and design
analysis are required.
The product data, shop drawings, and finish samples are specified as action submittals, the other submittals are
specified to be informational submittals. The curtain wall shown on the drawings was a generic system and the
specifications provided a list of three acceptable systems, which had slightly different methods of fabrication and
attachment to the building structure.
When the curtain wall installation is 10% complete, the specifications call for the contractor to perform water
spray and air leakage tests. The results of these tests are to be submitted to the architect. The curtain wall
manufacturer prepared the action submittals, the product test reports, and the design analysis and gave them to
the subcontractor to submit.…
arrow_forward
How is the punch list prepared?
arrow_forward
Thank you for your help in advance
arrow_forward
SEE MORE QUESTIONS
Recommended textbooks for you
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning
Related Questions
- Quality Engineering question A Production Engineer working in Company A wants to maintain a Standard Operation Procedure (SOP) for the mobile phone assembly line and also monitor status of production (traveler). Please advise him the necessary documentation to do it and help him regarding the type of information the document and records should contain. Please answer in your own words. please don't use handwriting. Thank youarrow_forwardWhen is the final certificate issued?arrow_forwardWriting Task Statements Scenario 2: You are putting together a job description based on several interviews, observations, and surveys. You are wondering about the level of detail at which you should write the task statements (TS) for the job description. Which one of the following statements provides the most practical level of detail for job evaluation purposes? Examine each TS and indicate why it is not practical. Prepares architectural plans for all types of buildings and city projects. Extends blueprint on a desk to study its content. Writes electrical work specifications to prepare architectural projects.arrow_forward
- Any recommended papers or txt books on this matter?arrow_forwardDrawings had been received, each drawing only contains the main product drawn on it, the name of the draughtsperson and the date. Each drawing is folded in half then in half again, with the white paper on the outside: - Suggest and justify improvements could be made to the folding and storing processes and document control as care and control procedures.arrow_forwardOne-page resume that can be used when you apply for your dream jobs after 3-4 years when you graduate in Civil Engineering.arrow_forward
- - Present a design proposal, utilising a selected alternative construction method, and explain how it is ‘fit for purpose’ in the given context. 1- Produce a design proposal, using computer-aided drawing tools, utilising alternative construction methods. 2- Present a design proposal that utilises alternative methods of construction. 3- Evaluate the effectiveness of using computer-aided drawing software and BIM. 4- Justify the use of a chosen alternative construction method.arrow_forwardWhat is the Certificate of Completion?arrow_forwardWhat are the similarities and dissimilarities between RFI and shop drawings and submittals?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Architectural Drafting and Design (MindTap Course...Civil EngineeringISBN:9781285165738Author:Alan Jefferis, David A. Madsen, David P. MadsenPublisher:Cengage Learning
Architectural Drafting and Design (MindTap Course...
Civil Engineering
ISBN:9781285165738
Author:Alan Jefferis, David A. Madsen, David P. Madsen
Publisher:Cengage Learning