b)(i) If there are only three resource skills available ource load chart based on the resource constraint.
Q: (a) how many production operations (b) how many workers will be required in the plant. (c) how much…
A: Processing time is the time taken to convert the raw materials and resources into finished products…
Q: b. Suppose that the number of workers at each stage are as follows: Stage Number of Workers A 4 D E…
A: Output at each stage: The output of stage A = 605per hour = 12 per hour The output of stage B =…
Q: Bill builds benches in a small shop and he plans to operate five 8-hour days perweek. Each bench has…
A: Lead Time Lead Time is the time is passed from the inception of the production to the end of it. It…
Q: a) The cycle time for the production of a PDA = enter your response here
A: Project schedule helps in calculating different values all related to the production cycle like the…
Q: 2
A: I have solved the second question for you. The data for 124) question is missing. Kindly find in…
Q: given information: which step is in bottleneck=30 min for tan leather 60/30=2 briefcases per hr…
A: Annual capacity= 8*250*2 =4000 briefcases
Q: linois Furniture, Inc, produces all types of office furniture. The "Executive Secretary" is a chair…
A: Note: - As it is specified to answer only subpart e, we will answer subpart e here. Given data is
Q: Shown below are the tasks, times, and precedence requirements for the work required to assemble a…
A: Tasks are the works that are given to the employees or people. A production line is a collection of…
Q: Shown below are the tasks, times, and precedence requirements for the work required to assemble a…
A: The production line is the set of machines in a systematic manner for assembling of product in an…
Q: Monique Food Processing Company produces light snacks that can be heated in a microwave. The…
A: Note:-We’ll answer the first three subparts of the question since the exact one wasn’t specified.…
Q: Describe the techniques to deal with bottleneck operations and some of those techniques that does…
A: A process bottleneck is a work stage that gets more work demands than it can process at its greatest…
Q: The following is a list of activities that must be completed in order to assemble a car. Draw the…
A: Note: - Since we can answer only up to 3 subparts we will answer subparts 1, 2, and 3 for your…
Q: Tailwind, Inc., produces high-quality but expensive training shoes for nmners. The Tailwind shoe,…
A: Activity Immediate Predecessors Duration A - 1 B A 3 C B 2 D B 4…
Q: 1. The following precedence network is used for assembling a product. You have been asked to achieve…
A: A project schedule network diagram shows the sequence of the task that are performed to complete a…
Q: (a) T. Smunt Manufacturing Corp. has the process displayed below. The drilling operation occurs…
A: Since we only answer up to 3 sub-parts, we’ll answer the first 3. Please resubmit the question…
Q: • What is the labor content? • Assuming a demand rate of 50 watches per hour, what is the takt time?…
A: As per Bartleby guidelines, we can only solve one question at a time. Below is the solution:-
Q: Develop a resource-constrained schedule in the loading chart that follows to see not use more than 9…
A: Below is the solution:-
Q: All Smiles Dental Clinic would like to develop a hygienist master schedule for the treatment of…
A: MPS involves the schedules of production wherein the employees have to process orders as per the…
Q: Cycle Time and Throughput Rate. b. Identify the…
A: Cycle time is the proportion between required demand and total available time. Throughput time…
Q: A work cell is scheduled to build 120 digital light processor (DLP) assemblies each week. These…
A: Demand= 120 dlp Work time (cell)= 6.5 hours×5= 32.5 hours= 1950 minutes Takt time= Work time of…
Q: he Action Toy Company has decided to manufacture a new train set, the production of which is broken…
A: Note, Since you have posted multiple parts of the question in the same questions, we will be…
Q: Given the following line balance data in the table below. For eight hours of operating time per day…
A: Line balancing is a creation system that includes balancing administrator and machine time to…
Q: . How many standard hours are needed to run an order of 200 pieces if the setup timeis 1.3 hours and…
A: 200 Pieces Setup time = 1.3 hours Run Time = 0.3 hours per piece Efficiency = 130% Utilization = 70%…
Q: • What is the labor content? • Assuming a demand rate of 50 watches per hour, what is the takt time?…
A: As per Bartleby guidelines, we can only solve the first three subparts of one question at a…
Q: is goal is to produce 1,000 bicycles per standard 40-hour workweek, Time Task Precedence Tasks (sec)…
A: Given: His goal is to produce 1000bicycles in 40hours workweek First we have to calculate the cycle…
Q: A small formwork subcontractor is awarded to erect formwork. It has been estimated 75labor-days. The…
A: Production is the process of converting inputs into finished products and services for the…
Q: The desired daily output for an assembly line is 540 units. This assembly line will operate 720…
A: Line balancing is a process which allocate activity to right workstation based on different…
Q: Suppose the times for the individual operations for the in-line skate assembly are as follows: Task…
A: Given- Desired output is 100 units per hour.We know that- 1 hour = 60 min × 60 sec = 3600…
Q: An assembly line is to be designed to operate 7.5 hours per day and supply a steady demand of 300…
A: Given that - Demand = 300 units Operating time = 7.5 hours per day
Q: Canine Kernels Company (CKC) manufactures two differenttypes of dog chew toys (A and B, sold in…
A: Production of a product comprises of various stages of sub-parts prepared. Every sub-part or stage…
Q: Q2: Six processes are to be laid out in six areas along a long corridor at Linda Babat Accounting…
A: Every pair of connected nodes in the network is associated with a specific demand. The demand will…
Q: a. what is the bottleneck of this process? b. what is the hourly capacity of the process?
A: Bottleneck station refers to the the one which has the lowest output per unit time. The output at…
Q: Calculate the efficiency of the newly design process.
A: A line balancing efficiency indicates the proportion between total task time and total workstation…
Q: 1. An assembly line with 17 tasks is to be balanced. The longest task is 2.4 minutes, and the total…
A: Given data,Operational time (OT) = 450 minutes a dayLongest task = 2.4 minutes Total time for all…
Q: #2.1] The setup from quiz 1 questions 4 & 5 is repeated below: "Consider software projects flowing…
A: The bottleneck process refers to the chain of project management, which reduces the capacity of the…
Q: What is the objective of assembly-line balancing? How would you deal with the situation where one…
A: The objective of the assembly line balancing is to efficiently arrange the machines, tasks, and…
Q: A visa application process from a Tumaritis country can be described in the chart below. The head of…
A: a. The difference between bottleneck and constraints are: Sl. No. Bottlenecks Constraints 1…
Q: c Golf Cart c golf cart Time on Hand 1 0 10
A: Given: Parts List for Electric Golf Cart Lead Time Quantity on Hand Electric golf cart 1 0…
Q: Master schedules are expressed in three different waysdepending on whether the process is…
A: Master Scheduling is the intricate planning process that tracks manufacturing output and matches…
Q: Compute the unit cost for the handles produced by the Pattern Department, assuming that process…
A: THE ANSWER IS AS BELOW:
Q: Golding Manufacturing, a division of Farnsworth Sporting, Inc., produces two different models of…
A: 1) Total units accounted for = Units completed + Unit (End WIP)…
Q: Draw a process fl ow diagram of your last doctor’s offi cevisit. Identify bottlenecks. Did any…
A: Small Introduction of Flow Diagram/ Flow Chart A flowchart is a two-dimensional graphic…
Q: Analyze bottleneck resources and apply TOC principles to controlling a process.
A: The theory of is based on the concept of elevation of the bottleneck. Efficiency should be maximized…
Q: Professional Image Briefcases is an exclusive producer of handcrafted, stylish cases. The company…
A:
Q: a. Contrast the meanings of the terms job enlargement and job enrichment. b. What is the purpose of…
A: Delegation refers to the process of assigning the responsibility to the particular job profile along…
Q: Klassen Toy Company, Inc., assembles two parts(parts I and 2): Part I is first processed at…
A: A bottleneck is a position of blockage in a manufacturing system (like an assembly line or a…
Q: Bill’s Barbershop has two barbers available to cut customers’hair. Both barbers provide roughly the…
A: Answer: We can see from the figure, shown in the question that every customer has first go through…
Q: a. Construct a precedence diagram and compute the lead time for the process. b. If the demand for…
A:
Q: A production process consists of a three-step operation. The scrap rate is 10 percent for the…
A: A three-step process Scrap rate at step-1 = 10% = 0.10 Scrap rate at step-2 = 6% = 0.06 Scrap rate…
Step by step
Solved in 2 steps with 3 images
- Q.1.2 Using a suitable example each, describe what the following project planning process activities involve: a. Establish project objective; b. Define scope; c. Create a Work Breakdown Structure (WBS); d. Estimate activity durations; e. Sequencing activities.Q2 - The following information has been gathered for a project plan: Activity Immediate Predecessor Duration (Days) A ------ 5+1*1 B ------ 3+1*1 C A 4+2*1 D A 8+1*1 E B 4+1*1 F C 6+2*1 G D,E,F 5+1*1 H E 6+2*1 I G,H 3+1*1 J H 8+1*1 Calculate the total slack and free slack of each activity. Find the critical path(s) and deduce the project duration. Find one merge activity and two parallel activities.Q. Exercise Figure 5.1 is a project WBS with cost apportioned by percentages. If the total project cost is estimated to be $600,000, what are the estimated costs for the following deliverables? a. Design b. programming c. In-house testing What weaknesses are inherent in this estimating approach? (Check the image) WBS figure.
- Jabez Contractors installs network routers. Using the CPM method and in reference to the table provided comment on the expected completion time of the projectand identify the activities that neeD to be prioritised by the project manager. (Nodiagram is required) TABLE- PROJECT INSTALLATION Activity Predecessor optimistic Most Likely Pessismistic Estimated time A - 4 7 10 7 B - 2 9 10 8 C A,B 2 5 8 5 D C 16 19 28 20 E C 6 9 24 11 F E 1 7 13 7 G C 4 10 28 12 H D,F 2 5 14 6 I G 5 8 17 9 J H,I 2 5 8 5Construct a network diagram for this project? TABLE 1: Activities and duration project Duration in weeks __________________________________ Activity Proceeding activity Optimistic Most likely Pessimistic A - 2 3 3 B - 10 12 15 C A 4 5 8 D B 2 2 2 E A, D 3 3 3 F…Draw a network diagram showing the linkage between these activities from start to finish. For the diagram, each activity should be labelled alphabetically ie. A, B, C… etc. PERT Formula: TE = (O + 4T + P) / 6 TE = Pert Expected Time Duration, O = Optimistic estimate, P = Pessimistic estimate, T = Most Likely (Typical) estimate Activity Predecessor Optimistic Most Likely Pessimistic Duration Duration in Weeks A — 2 3 4 B — 4 5 7 C B 1 2 3 D C & E 0.5 1 1.5 E B 0.5 1 1.5 F C 2 3 4 G F 2 3 4
- a) Explain the purposes of a dummy activity in a network diagram. (b) Table 1 shows the activities of a project and their durations. Table 1Activity Preceding Activity Duration (Days)A – 9B – 3C A 8D A 2E A 3F C 2G C 6H C 1J B,D 4K F,J 1L E,H,G,K 2M E,H 3N L,M 4 i. Draw the project network.ii. Determine its critical path and completion time.iii. Calculate the total float for the non-critical chains. 2. a) Outline FOUR different types of stockholding casts. b) i) Explain the periodic review system of inventory control.ii) State TWO disadvantages of the periodic review system. c) Explain FOUR major functions of an office. d) A common trend in the office management in many large manufacturing organizations today is to set up an ‘organization and method’ (O&M) team, which is normally directly answerable to the Chief Executive Officer. Highlight FOUR responsibilities of such a team. 3. a) State FOUR objectives of maintenance in a manufacturing plant. b) Explain the purpose of the…IT PROJECT MANAGEMENT :EX 1.2 Define a project with help of example and explain briefly the Project Life Cycle and the phases involved?To be able to meet delivery dates, a project consultant intimates that a project should be analyzed with activities as follows: ACTIVITY IMMEDIATE PREDECESSOR EXPECT DURATION (WEEKS) A. Initial discussion none 3 B. product design none 5 C. Market survey B 3 D. market evaluation A,C 4 E. product costing D 8 F. sales plan C 2 G. product pricing F 4 H. prototype F 2 I. master inform B 5 J.prototype testing HEG 3 (i) Draw a network to represent the various activities of the project.(ii) Draw up a table showing for each activity, the earliest and latest start and finish times and total float/slack.(iii) Determine the critical path and project duration.(iv) As a management science student, advise the management about the effect on the project completion time If the start time of activity A is delayed by 3weeks, activity G is delayed by 8 weeks
- Table 7.8 contains data for the installation of new equipment in a manufacturing process at Excello Corporation. Your company is responsible for the installation project. Indirect costs are $15,000 per week, and a penalty cost of $9,000 per week will be incurred by your company for every week the project is delayed beyond week 9.a. What is the shortest time duration for this project regardless of cost?b. What is the minimum total cost associated with completing the project in 9 weeks?c. What is the total time of the minimum-cost schedule?Q: (a) How value engineering can reduce overall project duration? Can you give any practical example? (b) What will be the difference in duration of dummy activity for simple and complex arrow networks? (c) Draw arrow network for the following given project. Picture of table is attached at the end.Q1: You have the following activities of a project and the time to complete each one (note that the time in weeks) Required: 1 - Draw a network of project activities 2 - Determine the project implementation schedule. 3 - Calculate the completion time for the project implementation and the slack time for each activity. Activity Duration Star Finish Slack ES LS EF LF 1-2 2 1-3 5 2-4 9 2-5 7 2-6 12 3-6 10 4-6 7 4-7 8 5-7 3 6-8 5 7-8 6 8-9 4 Q2: Draw the Network Diagram and determine the Critical Path and duration of the project (in days) Activity Duration Predecessor(s) A 2 ----- B 5 ----- C 9 A D 7 A E 12 A F 10 B, C G 7 D H 8 E I 3 F J 5 H, G K 6 I, J L 4 H, G M 3…