In evaluating projects, LeadTech’s engineers use a rate of 15%. One year ago a robotic transfer machine was installed at a cost of $38,000. At the time, a 10-year life was estimated, but the machine has had a downtime rate of 28%, which is unacceptably high. A $12,000 upgrade should fix the problem, or a labor-intensive process costing $3500 in direct labor per year can be substituted. The plant estimates indirect plant expenses at 60% of direct labor, and it allocates front office overhead at 40% of plant expenses (direct and indirect). The robot has a value in other uses of $15,000. What is the difference between the EUACs for upgrading and switching to the labor-intensive process?
In evaluating projects, LeadTech’s engineers use a rate of 15%. One year ago a robotic transfer machine was installed at a cost of $38,000. At the time, a 10-year life was estimated, but the machine has had a downtime rate of 28%, which is unacceptably high. A $12,000 upgrade should fix the problem, or a labor-intensive
Trending now
This is a popular solution!
Step by step
Solved in 2 steps