The cost of a window air conditioner was $340 and had a markup on cost percentage of 50%. During a spring promotion, the selling price was reduced by $100. The required overheads and operatings profit for the air conditioner are 15% and 35% of cost respectively. For full marks your answers should be ropunded to the nearest cent. What is the regular selling price? What is the profit at the sale price ? What is the break - even price?
Cost-Volume-Profit Analysis
Cost Volume Profit (CVP) analysis is a cost accounting method that analyses the effect of fluctuating cost and volume on the operating profit. Also known as break-even analysis, CVP determines the break-even point for varying volumes of sales and cost structures. This information helps the managers make economic decisions on a short-term basis. CVP analysis is based on many assumptions. Sales price, variable costs, and fixed costs per unit are assumed to be constant. The analysis also assumes that all units produced are sold and costs get impacted due to changes in activities. All costs incurred by the company like administrative, manufacturing, and selling costs are identified as either fixed or variable.
Marginal Costing
Marginal cost is defined as the change in the total cost which takes place when one additional unit of a product is manufactured. The marginal cost is influenced only by the variations which generally occur in the variable costs because the fixed costs remain the same irrespective of the output produced. The concept of marginal cost is used for product pricing when the customers want the lowest possible price for a certain number of orders. There is no accounting entry for marginal cost and it is only used by the management for taking effective decisions.
The cost of a window air conditioner was $340 and had a markup on cost percentage of 50%. During a spring promotion, the selling price was reduced by $100. The required
What is the regular selling price?
What is the profit at the sale price ?
What is the break - even price?
Step by step
Solved in 2 steps