Engineering Economy, Student Value Edition (17th Edition)
17th Edition
ISBN: 9780134838137
Author: William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Question
Chapter 10, Problem 14P
(a):
To determine
Calculate the benefit cost ratio.
(b):
To determine
Calculate the change in benefit cost ratio.
(c):
To determine
Best alternative.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Why are benefit cost ratios inappropriate for evaluating alternative projects?
Cost-effectiveness analysis (CEA) differs from benefit/cost analysis (B/C) in that: (a) CEA cannot handle multiple alternatives (b) CEA compares alternatives on the basis of a specific outcome rather than solely on monetary units (c) CEA cannot handle independent alternatives (d) CEA is more time consuming and resource intensive
Where is the salvage value placed in a conventional B/C ratio? Why? How is it handled mathematically?
Chapter 10 Solutions
Engineering Economy, Student Value Edition (17th Edition)
Ch. 10 - Prob. 1PCh. 10 - Prob. 2PCh. 10 - Prob. 3PCh. 10 - A retrofitted space-heating system is being...Ch. 10 - Prob. 5PCh. 10 - Prob. 6PCh. 10 - Prob. 7PCh. 10 - Prob. 8PCh. 10 - Prob. 9PCh. 10 - Prob. 10P
Ch. 10 - Prob. 11PCh. 10 - Prob. 12PCh. 10 - Prob. 13PCh. 10 - Prob. 14PCh. 10 - Prob. 15PCh. 10 - Prob. 16PCh. 10 - Four mutually exclusive projects are being...Ch. 10 - Two municipal cell tower designs are being...Ch. 10 - Prob. 19PCh. 10 - Prob. 20PCh. 10 - Prob. 21PCh. 10 - Prob. 22PCh. 10 - You have been requested to recommend one of the...Ch. 10 - Prob. 24PCh. 10 - Prob. 25PCh. 10 - Prob. 26FECh. 10 - Prob. 27FECh. 10 - Prob. 28FECh. 10 - Prob. 29FECh. 10 - Prob. 30FECh. 10 - Prob. 31FE
Knowledge Booster
Similar questions
- Two alternatives, identified as X and Y, are evaluated using the B/C method. Alternative Y has a higher total cost than X. If the B/C ratios are 1.2 and 1.0 for alternatives X and Y, respectively, which alternative should be selected? Whyarrow_forward____ are defined as costs which are incurred regardless of the alternative action chosen in a decision-making problem.arrow_forwardIndicate true (T) or False (F) _______Results of economic analysis is always the same regardless of which economic evaluation criterion (such as B/C ratio, IRR, etc.) is used. _______Two transportation services are substitutes if their cross elasticities are positive. _______Travel time costs are mainly dependent on the vertical and horizontal alignments. _______User benefits are achieved from an investment option if it reduces total user costs. _______Traffic mobility improvements will always cut back vehicle emissions.arrow_forward
- For a complete and correct incremental B/C analysis method for multiple alternatives, which of the following does the method NOT require? a. Čalculation of the B/C ratio of each alternative b. The identification of all relevant alternatives c. Ranking the order of the projects (smallest to largest denominator) d. Calculation of the B/C ratio for incremental cash flowsarrow_forwardIt asks for modified B/C ratio.arrow_forwardQuestion # 14: Economic "Sustainability" and Environmental “Impact" Analysis : A country of 150 million Population with a per-capita income (A) of $ 25,000.00/year, Technological Capability Index ( T ) = .70 or 70%, with a skilled workforce (WF) of 75 million people ~ o Calculate the "SUSTAINABILITY IMPACT" and/or Economic viability of that country ?arrow_forward
- From the following data, use the conventional B/C ratio for a project that has a 20-year life to determine if it is economically justified. Use an interest rate of 8% per year. Consequences To the People Annual benefits = $135,000 per year Annual disbenefits = $10,000 per year The B/C ratio is The project is [[(Click to select) To the Government First cost = $700,000 Annual cost Annual savings $141,000 per year $30,000 per year E =arrow_forwarda. Based on PW method, Design Z is more economical. b. The modified B/C ratio of Design Y is The modified B/C ration of Design Z is (Round to two decimal places) (Round to two decimal places) c. The incremental B/C ratio is (Round to two decimal places) Therefore, based on the B/C ratio method, Design Z is more economical d. The discounted payback period of Design Y is The discounted payback period of Design Z is years (Round to one decimal place) years (Round to one decimal place) Investment cost Annual revenue Annual cost Useful life Salvage value Net PW Therefore, based on the payback period method, Design y would be preferred. (e) Why could the recommendations based on the payback period method be different from the other two methods? ⒸA. because the payback period method ignores the cash flows after the payback period O B. because the payback period gives more weight to the cash flows after the payback period C Design Y Design Z $140,000 $275,000 $57,659 $96.354 $17.618 $31,687 15…arrow_forwardWhich of the following best describes what an input problem measures? resources/time money taxes productionarrow_forward
- The benefits associated with a nuclear power plant cooling water filtration project located on the Ohio River are $12,000 per year forever, starting in year 1. The costs are $25,000 in year O and $25,000 at the end of year 2. At /= 10% per year, calculate the B/C ratio to determine if the project is justified economically. The B/C ratio will be [ The project is economically [justifedarrow_forwardIs the Benefit-cost analysis a decision-making tool for systematically developing useful information about the desirable and undesirable effects of public projects?arrow_forwardThe following data is provided for a PPP project. To the People To the Government Benefits $95,000 per year beginning now Cost $1.8 million now and $200,000 every 3 years Disbenefits $60,000 per year Savings $115,000 per year 1--Calculate the conventional benefit/cost ratios using an interest rate of 12% per year and an infinite project period. The conventional B/C ratio is . 2--Calculate the modified benefit/cost ratios using an interest rate of 12% per year and an infinite project period. The modified B/C ratio is .arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you