Engineering Economy, Student Value Edition (17th Edition)
Engineering Economy, Student Value Edition (17th Edition)
17th Edition
ISBN: 9780134838137
Author: William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher: PEARSON
Question
Book Icon
Chapter 10, Problem 15P
To determine

Calculate the capitalized worth.

Blurred answer
Students have asked these similar questions
In a city by a river, flood damage to businesses and homes averages $5,000,000 per year. A proposed levee system would prevent all flood damage, at a cost of $50,000,000 to construct and $3,000,000 per year for maintenance and interest. The city proposes to finance the construction by selling bonds; these bonds would have a 20-year term and pay 6% interest on par value. The bonds will be renewed at maturity for the same term and at the same interest rate. The benefit-cost ratio for the levee system is A. less than 0.5 B. greater than 0.5 but less than 1.0 C. greater than 1.0 but less than 1.5 D. greater than 1.5
A PAM partner company won a tender to provide clean water distribution facilities in an area that is being developed as a tourist area. There are 2 alternatives that can be taken in implementing the project. The first alternative requires construction and installation costs of IDR 10 million per kilometer with maintenance costs of IDR 0.35 million per kilometer per year. The remaining value is estimated at IDR 1 million per kilometer at the end of the 20th year. The second alternative requires construction and installation costs of IDR 7 million per kilometer with maintenance costs of IDR 0.40 million per kilometer per year. The remaining value is estimated at IDR 1.2 million per kilometer at the end of the 20th year. If the company chooses the first alternative, the length of the pipe that must be installed is 10 kilometers, and if the second alternative the length of the cable is 16 kilometers. Determine which alternative is more efficient using MARR = 11%!
Engineering Economics (Ilustrative Problem): A tunnel through a mountain is being considered as a replacement for an existing stretch of highway in southern Mindanao. The existing road is a steep, narrow, winding two-lane highway that has been the site of numerous fatal accidents. The accidents average to 2.05 fatalities and 3.35 “serious injuries” per year. It has been projected that the tunnel will significantly reduce the frequency of accidents, with estimates of not more than 0.15 fatalities and 0.35 “serious injuries” per year. Initial capital investment requirements, including land acquisition, tunnel excavation, lighting, roadbed, and preparation, are estimated to be Php45 M. Annual upkeep costs for the tunnel will be significantly less than for the existing highway, resulting in an annual savings of Php85,000. For purposes of this analysis, a “value per life saved” of Php1 M will be applied, along with an estimate of Php750,000 per “serious injury” for medical costs.  Apply the…
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
ENGR.ECONOMIC ANALYSIS
Economics
ISBN:9780190931919
Author:NEWNAN
Publisher:Oxford University Press
Text book image
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Text book image
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Text book image
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Text book image
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Text book image
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education