CONNECT F/OPERATIONS MGMT
14th Edition
ISBN: 9781264344963
Author: Stevenson
Publisher: INTER MCG
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 10, Problem 16P
Summary Introduction
To determine: The number of replacement needed.
Introduction: Quality is a measure of excellence or a state of being free from deficiencies, defects and important variations. It is obtained by consistent and strict commitment to certain standards to attain uniformity of a product to satisfy consumers’ requirement.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
50 motor generators are inspected per day from a stable process. The best estimate of the fraction of nonconforming is 0.076. Determine the centeral line and control limits. On a particular day, 5 nonconforming generators were discovered. Is this process in or out of control? For the information given in the problem, construct a np-chart
The Watson Electric Company produces incandescent light bulbs. The following data on the number of lumens for 40-watt light bulbs were collected when the process was in control. The standard deviation of the process is 15.
Calculate control limits for an x-bar chart with 3-sigma limit and draw the chart.
Since these data were collected, some new employees were hired. A new sample obtained the following readings: 625, 592, 612, and 650. Is the process still in control?
Specifications for a metal shaft are much wider than the machine used to make the shafts is capableof. Consequently, the decision has been made to allow the cutting tool to wear a certain amountbefore replacement. The tool wears at the rate of .004 centimeter per piece. The process has a naturalvariation, σ, of .02 centimeter and is normally distributed. Specifications are 15.0 to 15.2 centimeters.A three-sigma cushion is set at each end to minimize the risk of output outside of the specifications.How many shafts can the process turn out before tool replacement becomes necessary?
Chapter 10 Solutions
CONNECT F/OPERATIONS MGMT
Ch. 10.2 - Prob. 1.1RQCh. 10.2 - Prob. 1.2RQCh. 10.4 - Prob. 1.1RQCh. 10.4 - Prob. 1.2RQCh. 10 - Prob. 1DRQCh. 10 - Prob. 2DRQCh. 10 - Prob. 3DRQCh. 10 - Prob. 4DRQCh. 10 - Prob. 5DRQCh. 10 - Prob. 6DRQ
Ch. 10 - Prob. 7DRQCh. 10 - Prob. 8DRQCh. 10 - Prob. 9DRQCh. 10 - Prob. 10DRQCh. 10 - Prob. 11DRQCh. 10 - Prob. 12DRQCh. 10 - Prob. 13DRQCh. 10 - Prob. 14DRQCh. 10 - Prob. 15DRQCh. 10 - Prob. 16DRQCh. 10 - Prob. 1TSCh. 10 - Prob. 2TSCh. 10 - Prob. 3TSCh. 10 - Prob. 1CTECh. 10 - Prob. 2CTECh. 10 - Prob. 3CTECh. 10 - Prob. 4CTECh. 10 - Prob. 1PCh. 10 - Prob. 2PCh. 10 - Prob. 3PCh. 10 - Prob. 4PCh. 10 - Prob. 5PCh. 10 - Prob. 6PCh. 10 - Prob. 7PCh. 10 - Prob. 8PCh. 10 - Prob. 9PCh. 10 - Prob. 10PCh. 10 - Prob. 11PCh. 10 - Prob. 12PCh. 10 - Prob. 13PCh. 10 - Prob. 14PCh. 10 - Prob. 15PCh. 10 - Prob. 16PCh. 10 - Prob. 17PCh. 10 - A production process consists of a three-step...Ch. 10 - Prob. 19PCh. 10 - Prob. 20PCh. 10 - Prob. 21PCh. 10 - Prob. 22PCh. 10 - Prob. 23PCh. 10 - Prob. 24PCh. 10 - Prob. 25PCh. 10 - Prob. 26PCh. 10 - Prob. 27PCh. 10 - Prob. 28PCh. 10 - Prob. 29PCh. 10 - Prob. 1.1CQCh. 10 - Prob. 2.1CQCh. 10 - Prob. 2.2CQCh. 10 - Prob. 2.3CQCh. 10 - Prob. 2.4CQ
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- At Webster Chemical Company, lumps in the caulking compound could cause difficulties in dispensing a smooth bead from the tube. Even when the process is in control, an average of four lumps per tube of caulk will remain. Testing for the presence of lumps destroys the product, so an analyst takes random samples. The following results are obtained: Tube No. Lumps Tube No. Lumps Tube No. Lumps 1 6 5 6 9 5 2 5 6 4 10 0 3 0 7 1 11 9 4 4 8 6 12 2 Determine the c-chart two-sigma upper and lower control limits for this process. Is the process in statistical control?arrow_forwardStudies on a machine that molds plastic water pipe indicate that when it is injecting1-inch diameter pipe, the process standard deviation is 0.05 inches. The one-inchpipe has a specification of 1-inch plus or minus 0.10 inch. What is the processcapability index (Cp) if the long-run process mean is 1 inch?arrow_forwardA travel agency is concerned with the accuracy and appearance of itineraries prepared for its clients. Defects can include errors in times, airlines, flight numbers, prices, car rental information, lodging, charge card numbers, and reservation numbers, as well as typographical errors. As the possible number of errors is nearly infinite, the agency measures the number of errors that do occur. The current process results in an average of five errors per itinerary. a. What are the two-sigma control limits for these defects? The UCLc equals _______________ and the LCLc equals ____________________ (Enter your responses rounded to three decimal places. If your answer for LCLc is negative, enter this value as 0.) b. A client scheduled a trip to Dallas. Her itinerary contained five errors. Interpret this information. A. The number of defects is within the control limits, so it is assumed that the process is not in control. B. The number of defects is within the…arrow_forward
- One of the stages in the process of making denim cloth at the Southern Mills Company is to spin cotton yarn onto spindles for subsequent use in the weaving process. Occasionally the yarn breaks during the spinning process, and an operator ties it back together. Some number of breaks is considered normal; however, too many breaks may mean that the yarn is of poor quality. In order to monitor this process, the quality-control manager randomly selects a spinning machine each hour and checks the number of breaks during a 15-minute period. Following is a summary of the observations for the past 20 hours. Construct a c-chart using 3 limits for this process and indicate if the process was out of control at any time.arrow_forwardThe Watson Electric Company produces incandescent light bulbs. The following data on the number oflumens for 40-watt light bulbs were collected when the process was in control. a. Calculate control limits for an R-chart and an x-chart.b. Since these data were collected, some new employees were hired. A new sample obtained the following readings: 625, 592, 612, and 635. Is the process still in control?arrow_forwardIf a process is neither capable nor in control, which of the following is the first step to be taken? 1) Redesign the equipment 2) Remove sources of special causes of variation 3) Determine the process capability index 4) Remove common causes of variationarrow_forward
- Control charts for X-bar and R, using a subgroup size of 5, are to be applied to control thecritical dimension of a certain manufacturing process. Specifications call for a nominal dimension of1,250.000 + 0.050 mm. The process is believed to have a σ of 0.015 mm Determine appropriate control limits for the X-bar and R charts. a) After 12 subgroups have been drawn and X-bar and R plotted on the charts, a computation of X-double bar give 1,250.015. b1) What is the probability that a value of X-bar will fall within the limits if this is the true value of the mean setting? b2) What is the probability that all 12values fall within the control limits? b) Make the necessary calculations to determine if the process can meet specifications by solvingfor Cp, Cpu, CpL, Cpk . Assume a normal distribution of product output. Illustrate how the processwould look like relative to the result of the computations of the process capability analysis.arrow_forwardA company making tires for bikes is concerned about the exact width of its cyclocrosstires. The company has a lower specification limit of 22.8 mm and an upper specification limit of 23.2 mm. The standard deviation is 0.15 mm and the mean is 23 mm.What is the process capability index for the process?arrow_forwardA metal fabricator produces connecting rods with an outer diameter that has a 1 ± .01–inch specification. A machine operator takes several sample measurements over time and determines the sample mean outer diameter to be 1.002 inches with a standard deviation of .003 inch.a. Calculate the process capability index for this example.b. What does this figure tell you about the process?arrow_forward
- At Quick Car Wash, the wash process is advertised to take less than 7 minutes. Consequently, management has set a target average of 390 seconds for the wash process. Suppose the average range for a sample of 10 cars is 11 seconds. Use the accompanying table to establish control limits for sample means and ranges for the car wash process. The UCL Subscript x overbar equals seconds and the LCL Subscript x overbar equals seconds. (Enter your responses rounded to two decimal places.)arrow_forwardJohn Bruno owns a factory producing electric cords. John observes that recently the number of cords with defect has increased. He monitors the 3 processing machines for 30 days for 100 cords per observation per machine. The results of John Bruno’s observations are presented in the table below.What can he do to make sure that the number of cords with defect to go down? Date Number of Rejects by Cause Number of observations Machine Bad Wind Twisted cord Broken Leads Abraded cord Broken cord Wrong wire Failed Electrical Test 1 100 1 0 1 3 1 0 0 1 100 2 2 1 0 0 2 5 0 100 3 0 0 0 5 0 0 3 2 100 1 1 0 4 0 0 0 0 100 2 3 1 0 0 1 3 0 100 3 0 0 1 6 0 0 0 3 100 1 1 0 0 2 0 0 0 100 2 0 0 0 0 0 3 0 100 3 0 0 1 4 0 0 3 4 100 1 0 0 3 0 0 0 0 100 2 0…arrow_forwardA quality inspector took five samples in five hours, each with four observations, of the length time for glue to dry. The analyst compute the mean of each sample and the computed the grand mean. All values are in minutes. Use this information to obtain three-sigma control limits for means. It is known from previous experience that the standard deviation of the process is 0.02 minutes. Draw a control chart Please provide a step-by-step solutionarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.