Question
Chapter 10, Problem 27P
Summary Introduction
To determine: The number of observations required.
Introduction: Thesample size is required to determine the number of observations that are necessary to find the true cycle time.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Claudine Soosay recorded the following times assembling a watch:
Observation No.
1
2
3
4
5
6
7
8
Performance rating is given as 95%.
a) The average time of Claudine for the operation =
Time (minutes)
0.11
0.09
0.11
0.09
0.15
0.10
0.09
0.10
Observation No.
9
10
11
12
13
14
15
16
minutes (round your response to three decimal places).
Time (minutes)
0.11
0.09
0.11
0.10
0.11
0.12
0.14
0.10
QUESTION 6
A Taguchi loss determination:
A component has a target dimension value of 50 mm.
It is considered a complete loss of $23 if the deviation exceeds +/- 1.5 mm.
Determine the loss if a component measures 20.2 mm.
Round your answer to the nearest penny, if applicable.
QUESTION 7
A business process has the following parameters:
Process mean: 90
Upper Specification Limit 100
Lower Specification Limit 80
Process Standard Deviation: 3.25
Determine the process Capability Ratio Round your answer to 3 decimal places, if applicable.
K
Claudine Soosay recorded the following times assembling a watch:
Observation No.
1234567co
8
Time (minutes)
0.12
0.10
0.11
0.11
0.15
0.10
0.10
0.10
Observation No.
9
10
11
12
13
14
15
16
Time (minutes)
0.11
0.08
0.11
0.10
0.10
0.11
0.14
0.08
Chapter 10 Solutions
EBK OPERATIONS MANAGEMENT
Ch. 10 - Prob. 1DQCh. 10 - Prob. 2DQCh. 10 - Prob. 3DQCh. 10 - Prob. 4DQCh. 10 - Prob. 5DQCh. 10 - Prob. 6DQCh. 10 - Prob. 7DQCh. 10 - Prob. 8DQCh. 10 - Prob. 9DQCh. 10 - Prob. 10DQ
Ch. 10 - Prob. 11DQCh. 10 - Prob. 12DQCh. 10 - Prob. 13DQCh. 10 - Prob. 14DQCh. 10 - Prob. 1PCh. 10 - Draw an activity chart for a machine operator with...Ch. 10 - Prob. 3PCh. 10 - Prob. 4PCh. 10 - Prob. 5PCh. 10 - Prob. 6PCh. 10 - Prob. 7PCh. 10 - Prob. 8PCh. 10 - Prob. 9PCh. 10 - Prob. 10PCh. 10 - Prob. 11PCh. 10 - Prob. 12PCh. 10 - Prob. 13PCh. 10 - Prob. 14PCh. 10 - Prob. 15PCh. 10 - Prob. 16PCh. 10 - Prob. 17PCh. 10 - Prob. 18PCh. 10 - Prob. 19PCh. 10 - Prob. 20PCh. 10 - Prob. 21PCh. 10 - Prob. 22PCh. 10 - Prob. 23PCh. 10 - Prob. 24PCh. 10 - Prob. 25PCh. 10 - Prob. 26PCh. 10 - Prob. 27PCh. 10 - Prob. 28PCh. 10 - Prob. 29PCh. 10 - Prob. 30PCh. 10 - Prob. 31PCh. 10 - Prob. 32PCh. 10 - Prob. 33PCh. 10 - Prob. 34PCh. 10 - Prob. 35PCh. 10 - Prob. 36PCh. 10 - Prob. 37PCh. 10 - Prob. 38PCh. 10 - Prob. 1CSCh. 10 - Prob. 2CSCh. 10 - Prob. 3CSCh. 10 - Prob. 4CSCh. 10 - Prob. 1VCCh. 10 - Prob. 2VCCh. 10 - Prob. 3VCCh. 10 - Prob. 4VC
Knowledge Booster
Similar questions
- Time left 1:06:0- In a fabric manufacturing factory, the quality control process using control charts from SPC. In an hour there are a total of 5 samples are taken each having 4 observations regarding the thickness of fabric in measured in millimeters. In a particular hour, the sample means (X-bar) are noted to be: 156.46, 199.62, 189.31, 102.22, and112.09 respectively. In the same sample, the corresponding ranges are: 11.97, 12.17, 13.94, 11.86, and 11.83 respectively. What are the lower and upper control limits for the R chart? O a. 0,28.17 O b. 0,31.17 OC None is correct O d. 0,24.71 O e. 0,30.47 Of. 0,29.17 US PAGE NEXT PAGE O # C a pe here to search Prt F10 F12 %23 & 2 . 3 5 6 V. 8. R T. Y U P 41 S F J G y H K L / C V } BYN i 10 Alt Alt Ctrlarrow_forwardsubject: quality control What evidence is there that Six Sigma has been implemented in how many organizations in the world?arrow_forwardSee images for question details.arrow_forward
- An analyst has been asked to prepare an estimate of the proportion of time that a turret lathe operator spends adjusting the machine, with 90% confidence level. Based on previous experience, the analyst believes the proportion will be approximately 30%. a. If the analyst uses sample size of 400 observations, what is the maximum error that will be associated with the estimate? b. What sample size would the analyst need in order to have the maximum error be no more than +/- 5%?arrow_forwardDetermine the standard time of the process using the below-recorded observations. Hint: remove unusual time observationsarrow_forwardQuestion : A process that is considered to be in control measures an ingredient in ounces. Below are the last ten samples (each of size n=5) taken. The population standard deviation is 1.36. SAMPLE 1 2 3 4 5 6 7 8 9 10 5 6 9 10 9 10 9 12 8 9 8 9 9 8 12 11 9 9 6 10 6 8 5 7 10 8 10 9 4 12 4 7 3 8 8 6 12 10 4 11 5 4 2 9 8 6 8 6 5 7 Using information from the above table: Calculate the standard deviation of the sample means, σ×. Determine the control limits for the mean chart, using A2 and σ× if z=3. Determine the control limits for the range chart. Construct mean (using A2) and range control charts by using information from (ii) and (iii). Comment on your results.arrow_forward
- Question 3 A coffee producer wishes to produce new 50-gram pack for people who like to bring their own coffee when they travel. The producer asked your help to monitor the quality of the process by setting up the appropriate control charts. Based on the data shown in the table, is the process in control? Sample 2 3 4 5 6 7 8 9 2 3 4 Values for A2, D3 and D4 Sample Size n 10 1 54.5 50.6 51.1 52.7 51.7 5 6 7 8 9 10 11 51.1 54.0 53.2 51.9 A2 D3 1.88 0 1.02 0 0.73 0 0.58 0 0.48 0 0.42 0.08 0.37 0.14 0.34 0.18 0.31 0.22 0.29 0.26 12 0.27 0.28 Show all your workings clearly. 2 54.3 53.5 54.3 52.1 51.2 Observation 51.5 52.3 50.4 50.2 D4 3.27 2.57 2.28 2.11 2.00 1.92 1.86 1.82 1.78 1.74 1.72 3 53.8 53.2 50.4 51.3 54.7 54.7 54.7 53.4 50.2 4 50.4 54.9 50.7 51.0 54.3 50.4 51.4 51.4 52.9arrow_forwardPrepare a run diagram for this emergency call data. Use five-minute intervals (i.e., count the calls received in each five- minute interval. Use intervals of 0-4, 5-9, etc.). Note: Two or more calls may occur in the same minute; there were three operators on duty this night. What can you conclude from the run chart? Call Time Call Time Call Time 1 2 3 4 5 6 7 8 9 10 11 1:03 1:06 1:09 1:11 1:12 1:17 1:21 1:27 1:28 1:29 1:31 12 13 14 15 16 17 18 19 20 21 22 1:36 1:39 1:42 1:43 1:44 1:47 1:48 1:50 1:52 1:53 1:56 23 24 25 26 27 28 29 30 31 32 33 1:56 2:00 2:00 2:01 2:02 2:03 2:03 2:04 2:06 2:07 2:08 Call 34 35 36 37 38 39 40 41 42 Time 2:08 2:11 2:12 2:12 2:13 2:14 2:14 2:16 2:19 a. re-organize the above data for your analysis (using five-minute intervals; 0-4, 5-9, etc) b. Provide your diagram that shows the number of emergency calls by eacn five-minute intervals from 1am to 2:20am c. what can you conclude from the chart?arrow_forwardEach year, Lord & Taylor, Ltd., sets up a giftwrapping station to assist its customers with holiday shopping. Preliminary observations of one worker at the stationproduced the following sample time (in minutes per package):3.5, 3.2, 4.1, 3.6, 3.9. Based on this small sample, what number of observations would be necessary to determine the truecycle time with a 95% confidence level and an accuracy of{5%?arrow_forward
- Refer to Table S6.1 - Factors for Computing Control Chart Limits (3 sigma) for this problem. Ross Hopkins is attempting to monitor a filling process that has an overall average of 715 mL. The average range R is 6 mL. For a sample size of 10, the control limits for 3-sigma x chart are: Upper Control Limit (UCL;) = mL (round your response to three decimal places). Lower Control Limit (LCL-) = mL (round your response to three decimal places). The control limits for the 3-sigma R-chart are: Upper Control Limit (UCLR) = mL (round your response to three decimal places). Lower Control Limit (LCLR) = mL (round your response to three decimal places).arrow_forwardA Methods and Measurements Analyst needs to develop a time standard for a certain task. The task involves use of a ruler, square, and portable electric saw to mark and cut the "notch" in a rafter (a standard carpentry task of home construction). In a preliminary study, he observed one of his workers performing this task five times. The observations were made in an air-conditioned, well-lit training facility, at ground level, with all tools and equipment clean and readily available. Observation: 1 2 3 4 5 Task time (seconds): 82 74 80 88 76 (a) What is the actual average time for this task? (b) What is the normal time for this task if the employee worked at a 10% faster pace than is typical for adequately trained workers? (c) What is standard time for this task if allowances sum to 12%? (d) If the analyst then thought more carefully about his experiment and decided that the allowances needed to be increased to match the real (outside, not…arrow_forwardA time study has revealed an average observed timeof 5 minutes, with a standard deviation of 1.25 minu tes. Thesefigures are based on a sample of 75 cycles. Is this sample largeenough for analyst Anand Paul to be 99.73% confident that thestandard time is within 5% of the true value?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.