Question
Book Icon
Chapter 10, Problem 28P

a)

Summary Introduction

To determine: The normal time for the operation.

Introduction: The time study is the basis that helps set the standard time; it would time a sample of the performance of the worker.

a)

Expert Solution
Check Mark

Answer to Problem 28P

The normal time is calculated as 77.8 minutes.

Explanation of Solution

Given information:

The observed time and performance rating for each element is given as follows:

Element Performance rating Observation (minutes)
1 2 3 4 5
Prepare daily reports 120 35 40 33 42 39
Photocopy results 110 12 10 36a 15 13
Label and package reports 90 3 3 5 5 4
Distribute reports 85 15 18 21 17 45b

a refers to the photocopying machine being broken

b refers to the delay in allowance factor

Formulae to calculate normal time:

Average time=Observationsn

Normal time=Average time×Performance rating

Calculate normal time:

Element Performance rating Observation (minutes) Average time Normal time
1 2 3 4 5
Prepare daily reports 120% 35 40 33 42 39 37.8 45.36
Photocopy results 110% 12 10 36a 15 13 12.5 13.75
Label and package reports 90% 3 3 5 5 4 4 3.6
Distribute reports 85% 15 18 21 17 45b 17.75 15.09

Calculate the average time to prepare daily reports:

The average time is calculated by taking an average of the observation given, which is a summation of 35, 40, 33, 42, and 39 and dividing the result by 5. Hence, the average is 37.8 minutes.

Average time=Observationn=35+40+33+42+395=1895=37.8 minutes

Calculate the average time to photocopy results:

The average time is calculated by taking an average of the observation given, which is a summation of 12, 10, 15, and 13 and dividing the result by 4. Hence, the average is 12.5 minutes.

Average time=Observationn=12+10+15+134=504=12.5 minutes

Note: The observation with (Xa) should not be considered while calculating the average time.

Calculate the average time to label and package reports:

Average time=Observationn=3+3+5+5+45=205=4.0 minutes

The average time is calculated by taking an average of the observation given, which is a summation of 3, 3, 5, 5, and 4 and dividing the result by 5. Hence, the average is 4 minutes.

Calculate the average time to distribute reports:

Average time=Observationn=15+18+21+174=714=17.75 minutes

The average time is calculated by taking an average of the observation given, which is a summation of 15, 18, 21, and 17 and dividing the result by 4. Hence, the average is 17.75 minutes.

Note: The observation with (Xb) should not be considered while calculating the average time.

Calculate the normal time to prepare daily reports:

The normal time is calculated by multiplying average time and performance rating. The average time is calculated as 37.8 minutes, and performance rating is given as 120%. Hence, the normal time is 45.36 minutes.

Normal time=Average time×Performance rating=37.8×120%=37.8×1.2=45.36 minutes

Calculate the normal time to photocopy results:

The normal time is calculated by multiplying average time and performance rating. The average time is calculated as 12.50 minutes, and performance rating is given as 110%. Hence, the normal time is 13.75 minutes.

Normal time=Average time×Performance rating=12.50×110%=12.50×1.1=13.75 minutes

Calculate the normal time to label and package reports:

The normal time is calculated by multiplying average time and performance rating. The average time is calculated as 4.0 minutes, and performance rating is given as 90%. Hence, the normal time is 3.6 minutes.

Normal time=Average time×Performance rating=4.0×90%=4.0×0.9=3.6 minutes

Calculate the normal time to distribute reports:

The normal time is calculated by multiplying average time and performance rating. The average time is calculated as 17.75 minutes, and performance rating is given as 85%. Hence, the normal time is 15.09 minutes.

Normal time=Average time×Performance rating=17.75×85%=17.75×0.85=15.09 minutes

Calculate the total normal time:

The normal time is calculated by adding the normal time to prepare daily reports, photocopy results, label and package reports, and distribute reports.

Normal time=Sum of normal times=45.36+13.75+3.6+15.09=77.8 minutes

Hence, the total normal time is 77.8 minutes.

b)

Summary Introduction

To determine: The standard time for the operation.

Introduction: Time study is the basis that helps set the standard time; it would time a sample of the performance of the worker.

b)

Expert Solution
Check Mark

Answer to Problem 28P

Thestandard time is calculated as 91.53 minutes.

Explanation of Solution

Given information:

The allowance is given as 15%. The observed time and performance rating for each element is given as follows:

Element Performance rating Observation (minutes)
1 2 3 4 5
Prepare daily reports 120 35 40 33 42 39
Photocopy results 110 12 10 36a 15 13
Label and package reports 90 3 3 5 5 4
Distribute reports 85 15 18 21 17 45b

a refers to the photocopying machine being broken

b refers to the delay in allowance factor

Formula to calculate standard time:

Standard time=Normal time1Allowance factor

Calculate standard time:

The standard time is calculated by dividing the normal time with the value attained by subtracting the allowance factor from 1. Normal time is calculated as 77.8 minutes and allowance factor is calculated as 15%

Standard time=Normal time1Allowance factor=77.8 minutes10.15=77.8 minutes0.85=91.53 minutes

Hence, standard time is 91.53 minutes.

c)

Summary Introduction

To determine: The number of the sample size to prepare reports.

Introduction: The sample size is required to determine the number of observations that are necessary to find the true cycle time.

c)

Expert Solution
Check Mark

Answer to Problem 28P

The sample size to prepare reports is 15, to photocopy results is 44, label, and package reports is 96, and to distribute reports is 31 samples.

Explanation of Solution

Given information:

The confidence level is 95% and accuracy is ±5%.

Element Performance rating Observation (minutes)
1 2 3 4 5
Prepare daily reports 120 35 40 33 42 39
Photocopy results 110 12 10 36a 15 13
Label and package reports 90 3 3 5 5 4
Distribute reports 85 15 18 21 17 45b

Formula to determine the required number of observation:

n=(zshx¯)2

n refers to the number of observations required

z refers to the table value for the confidence level

s refers to the standard deviation

h refers to an accuracy level

x(bar) refers to the average observed time

Determine a proper number of observation required:

Element Mean observed time s Sample
Prepare daily reports 37.8 3.7 15
Photocopy results 12.5 2.1 44
Label and package reports 4 1 96
Distribute reports 17.75 2.5 31

Calculate the standard deviation to prepare daily reports:

The standard deviation can be calculated by dividing two values. The first value can be calculated by adding the square of the value attained by subtracting the mean observed value from each observation. The second value can be attained by subtracting 1 from the number of samples and the results should be square rooted. The standard deviation to prepare the daily report is 3.7.

s=(Sample observationx¯)2n1=(3537.8)2+(4037.8)2+(3337.8)2+(4237.8)2+(3937.8)251=54.84=3.7

Calculate the standard deviation to photocopy results:

The standard deviation can be calculated by dividing two values. The first value can be calculated by adding the square of the value attained by subtracting the mean observed value from each observation. The second value can be attained by subtracting 1 from the number of samples and the results should be square rooted. The standard deviation to photocopy results is 2.1.

s=(Sample observationx¯)2n1=(1212.5)2+(1012.5)2+(1512.5)2+(1312.5)241=133=2.1

Calculate the standard deviation to label and package reports:

The standard deviation can be calculated by dividing two values. The first value can be calculated by adding the square of the value attained by subtracting the mean observed value from each observation. The second value can be attained by subtracting 1 from the number of samples and the results should be square rooted. The standard deviation to label and package reports is 1.

s=(Sample observationx¯)2n1=(34)2+(34)2+(54)2+(54)2+(44)251=44=1

Calculate the standard deviation to distribute reports:

The standard deviation can be calculated by dividing two values. The first value can be calculated by adding the square of the value attained by subtracting the mean observed value from each observation. The second value can be attained by subtracting 1 from the number of samples and the results should be square rooted. The standard deviation to distribute reports is 2.5.

s=(Sample observationx¯)2n1=(1517.75)2+(1817.75)2+(2117.75)2+(1717.75)241=18.753=2.5

Calculate the sample size to prepare daily reports:

It is calculated by multiplying the z value of 1.96, the standard deviation that is given as 3.7, and dividing the result with the multiple of the accuracy level and average observed time that is given as 0.05 and 37.8, respectively. Hence, the required number of observations is 15 samples.

n=(zshx¯)2=(1.96×3.70.05×37.8)2=(7.2521.89)2=14.7215 samples

Calculate the sample size to photocopy results:

It is calculated by multiplying the z value of 1.96, the standard deviation that is given as 2.1, and dividing the result with the multiple of the accuracy level and average observed time that is given as 0.05 and 12.5, respectively. Hence, the required number of observations is 44 samples.

n=(zshx¯)2=(1.96×2.10.05×12.5)2=(4.1160.625)2=43.3744 samples

Calculate the sample size to label and package reports:

It is calculated by multiplying the z value of 1.96, the standard deviation that is given as 1, and dividing the result with the multiple of the accuracy level and average observed time that is given as 0.05 and 4, respectively. Hence, the required number of observations is 96 samples.

n=(zshx¯)2=(1.96×10.05×4)2=(1.960.2)2=96.0496 samples

Calculate the sample size to distribute reports:

It is calculated by multiplying the z value of 1.96, the standard deviation that is given as 2.5, and dividing the result with the multiple of the accuracy level and average observed time that is given as 0.05 and 17.75, respectively. Hence, the required number of observations is 31 samples.

n=(zshx¯)2=(1.96×2.50.05×17.75)2=(4.90.8875)2=30.4831 samples

Hence, the normal time for the process is 77.8 minutes and standard time for the process is 91.53 minutes. The sample size to prepare reports is 15, to photocopy results is 44, label and package reports are 96, and to distribute reports is 31 samples.

Want to see more full solutions like this?

Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
1) Job design specifies the tasks that constitute a job for an individual or a group. Briefly describe the five components of job design?
What are the differences among job enrichment, job enlargement, job rotation, job specialization, and employee empowerment?
QUESTION 15 are a type of standing plan that are designed to give explicit instructions on how to complete a recurring task. A. Guidelines B. Rules C. Policies D. Procedures
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Text book image
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Text book image
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Text book image
Business in Action
Operations Management
ISBN:9780135198100
Author:BOVEE
Publisher:PEARSON CO
Text book image
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Text book image
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.