MindTap Engineering for Garber/Hoel's Traffic and Highway Engineering, 5th Edition, [Instant Access], 1 term (6 months)
MindTap Engineering for Garber/Hoel's Traffic and Highway Engineering, 5th Edition, [Instant Access], 1 term (6 months)
5th Edition
ISBN: 9781305577398
Author: Nicholas J. Garber; Lester A. Hoel
Publisher: Cengage Learning US
Question
Book Icon
Chapter 10, Problem 6P
To determine

The three components of total control delay of a given lane group.

Blurred answer
Students have asked these similar questions
An intersection of four phase signal with the movements allowed in each phase and corresponding analysis and saturation flow rates shown in table pictute below. Calculate the sum of flow ratios for critical lane groups.
A signalized intersection has two lane groups. The two WBT lanes (lane group #1) have a total volume of 863 pc/h and an average control delay of 24.5 seconds. The one WBL lane (lane group #2) has a volume of 203 pc/h and an average control delay of 36.5 seconds. What is the approach's LOS? Group of answer choices LOS A LOS D LOS C LOS B
3. An intersection approach has two lane groups: left-turn lane group, and through/right-turn lane group. The control delay is 37 seconds/vehicle for the left-turn lane group, and 27 seconds/vehicle for the through/right-turn lane group. The analysis flow rate is 97 vehicles/hour for the left-turn lane group, and 450 vehicles/hour for the through/right-turn lane group. Calculate the approach control delay and write the corresponding level of service (LOS) for the approach in the box below.

Chapter 10 Solutions

MindTap Engineering for Garber/Hoel's Traffic and Highway Engineering, 5th Edition, [Instant Access], 1 term (6 months)

Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning