Question
Book Icon
Chapter 11, Problem 8P

a)

Summary Introduction

To determine: Consequences and advantages of the alternatives for a given scenario.

Introduction:

Capacity planning is the process of planning the required production output based on the requirement or the demand that is predicted.

b)

Summary Introduction

To determine: The option Person X would recommend.

Introduction:

Capacity planning is the process of planning the required production output based on the requirement or the demand that is predicted.

c)

Summary Introduction

To determine: The way the problem differs from other aggregate problems.

Introduction:

Capacity planning is the process of planning the required production output based on the requirement or the demand that is predicted.

Blurred answer
Students have asked these similar questions
Approximately 40 percent of a medical clinic’s weekly incoming calls for doctors’ appointments occur on Monday. Due to this large workload, 20 percent of the callers receive a busy signal and have to call back later. The clinic has one clerk for each two departments to handle incoming calls. Each clerk handles calls for the same departments all week and thus is familiar with the doctors’ hours, scheduling practices, and idiosyncrasies. Consider the following alternatives to solve thi problem: ∙ Continue the present system, which results in some customer inconvenience, loss of business, and perceived poor service. About 1000 patients attempt to call the clinic on Mondays. The clinic has 50,000 patients in all. ∙ Expand the phone lines and add more people to handle the peak load. The estimated cost for adding two more lines and two clerks is $60,000 per year. ∙ Install a computer to speed up appointments. In this case, the peak load could be handled with the current personnel. The…
An insurance company receives 220 calls per day from customers who lodge insurance claims. The call center is open from 8 a.m. to 5 p.m. The arrival of calls follows a Poisson process. Looking at the intensity of arrival of calls, we can distinguish three periods during the day: the period 8 a.m. to 11 a.m., the period 11 a.m. to 2 p.m. and the period 2 p.m. to 5 p.m. During the first period, around 60 calls are received. During the 11 a.m. to 2 p.m. period, 120 calls are received, and during the 2 p.m. to 5 p.m. period, 40 calls are received. A customer survey has shown that customers tend to call between 11 a.m. and 2 p.m. because during this time they have a break at work. Statistical analysis shows that the durations of calls follow an exponential distribution. According to the company’s customer service charter, customers should not wait more than 1 min on average for their call to be answered.   •   Assume that the call center can handle 70 calls per hour using 7 call center…
An emergency room (ER) at a Prisma Health Hospital has 10 total beds it can hold patients, i.e., the capacity of the queueing system of this ER is 10. Patients arrive to the ER at a rate of 5 per hour. Therefore, we have that λn = 6 for n = 0, 1, . . . , 9 and λ10 = 0 for this queueing system. A patient is seen by an ER doctor as the ‘service’ of this queueing system. The amount of time required for an ER doctor to treat a patient is exponentially distributed with a mean of .4 hours. We seek the minimum number of ER doctors so that the expected time of a patient waiting to be seen (so the Wq) is less than or equal to 15 minutes (.25 hours). You should begin by analyzing s = 1 and show any calculations that were used to determine Wq for each number of servers that you considered until you meet the target metric.
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,