EBK PRODUCTION AND OPERATIONS ANALYSIS
EBK PRODUCTION AND OPERATIONS ANALYSIS
7th Edition
ISBN: 9781478628385
Author: Olsen
Publisher: WAVELAND PRESS (ECONTENT)
bartleby

Concept explainers

Question
Book Icon
Chapter 11.9, Problem 35P
Summary Introduction

Interpretation: Contour lines for two facilities located at (0,0) and (0,10) , having weights 2 and 1 respectively needs to be drawn (Refer to Appendix 11-B).

Concept Introduction: The line that passes through or drawn through points having the same value is called a contour line.

Blurred answer
Students have asked these similar questions
A telecommunications system is going to be installed at a company site. Theswitching center that governs the system must be located in one of the five buildingsto be served. The goal is to minimize the amount of underground cabling required.In which building should the switching center be located? Assume a straight-linedistance measure.Building Location1 (10, 10)2 (0, 4)3 (6, 15)4 (8, 20)5 (15, 0)
Design a spreadsheet to compute the total rectilinear distance from a set of up to10 existing locations to any other location. Assume that existing locations areplaced in Columns A and B and the new location in cells D1 and E1. Initializecolumn A with the value of cell D1 and column B with the value of cell E1, so thatthe total distance will be computed correctly when there are fewer than10 locations.a. Suppose that existing facilities are located at (0, 0), (5, 15), (110, 120), (35, 25),(80, 10), (75, 20), (8, 38), (50, 65), (22, 95), and (44, 70), and the new facility is tobe located at (50, 50). Determine the total rectilinear distance of the new facilityto the existing facilities.b. Suppose the new facility in part (a) can be located only at x =0, 5, 10, . . . , 100and y = 0, 10, 20, . . . , 100. By systematically varying the x and y coordinates,find the optimal location of the new facility
(1) Find an optimal assignment of trucks to routes to minimize the total cost (using the Hungarian Method). B C 6 12 15 10 11 7 16 9 Truck / Route 1 2 3 4 Step la: Row subtraction (show your steps, e.g., see cell 1A) Truck / Route B 1 2 3 4 A 10 11 9 14 Step 1b: Column subtraction. Truck / Route 1 2 3 4 A 10-6=4 = = = = = B = с = C Step 2: Testing for optimal solution (show your lines covering the zero entries). What is the minimum number of lines required to cover all zeros? D 8 14 10 13 D = = D =
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Text book image
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Text book image
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Text book image
Business in Action
Operations Management
ISBN:9780135198100
Author:BOVEE
Publisher:PEARSON CO
Text book image
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Text book image
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.