Redo Problem 12.3 using Coyle and Castello’s methods for estimating both Qp and Qs.
12.3 A 500 mm diameter and 20 m long concrete pile is driven into a sand where γ = 18.5 kN/m3 and ϕ′ = 32º. Assuming δ′ = 0.7ϕ′ and K = 1.5 Ko, determine the load-carrying capacity of the pile, with a factor of safety of 3. Use Meyerhof’s method [Eq. (12.18)] for computing the point load-carrying capacity Qp, and Eqs. (12.42) and (12.43) for computing the load-carrying capacity of the pile shaft Qs.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
Consider a 15 m long concrete pile with a cross section of 0.45 m x 0.45 m fully embedded in sand.For the sand, unit weight, γ = 17 kN/m3 and soil friction angle, ϕ’ = 35o. Estimate the ultimate point??? with each of the following:1.1 Meyerhof’s method (Ans: 1014 kN)1.2 Vesic’s method (Ans: 1754 kN)1.3 Coyle and Castello’s method (Ans: 2479 kN)
Consider a 13.5 m long concrete pile with a diameter of 0.45 m fully embedded
in sand. For the sand, given unit weight, ? = 17.5 kN/m3
; and soil friction angle,
ϕ’ = 36
o
. Estimate the frictional resistance according to Coyle and Castello’s
method.
A square prestressed concrete pile with a cross section 0.3 m by 0.3 m is driven 15 m into overconsolidated clays with properties as defined: From the ground surface to a depth of 7 m, the unit weight is 17 kN/m3 and the shear strength cohesion cu is 70 kPa; below 7 m, the soil unit weight is 18.5 kN/m3 and cohesion is 105 kPa. Use the total stress α-method to calculate both the design downward axial capacity and upward axial capacity, using a factor of safety of 3 (downward and upward).
Chapter 12 Solutions
Principles of Foundation Engineering (MindTap Course List)
Ch. 12 - Prob. 12.1PCh. 12 - A 20 m long concrete pile is shown in Figure...Ch. 12 - A 500 mm diameter are 20 m long concrete pile is...Ch. 12 - Redo Problem 12.3 using Coyle and Castellos...Ch. 12 - A 400 mm 400 mm square precast concrete pile of...Ch. 12 - Determine the maximum load that can be allowed on...Ch. 12 - A driven closed-ended pile, circular in cross...Ch. 12 - Consider a 500 mm diameter pile having a length of...Ch. 12 - Determine the maximum load that can be allowed on...Ch. 12 - Prob. 12.10P
Ch. 12 - Prob. 12.11PCh. 12 - Prob. 12.12PCh. 12 - A concrete pile 16 in. 16 in. in cross section is...Ch. 12 - Prob. 12.14PCh. 12 - Solve Problem 12.13 using Eqs. (12.59) and...Ch. 12 - Prob. 12.16PCh. 12 - Prob. 12.17PCh. 12 - A steel pile (H-section; HP 310 125; see Table...Ch. 12 - Prob. 12.19PCh. 12 - A 600 mm diameter and 25 m long driven concrete...Ch. 12 - Redo Problem 12.20 using Vesics method, assuming...Ch. 12 - Prob. 12.22PCh. 12 - Prob. 12.23PCh. 12 - Solve Problem 12.23 using the method of Broms....Ch. 12 - Prob. 12.25PCh. 12 - Solve Problem 12.25 using the modified EN formula....Ch. 12 - Solve Problem 12.25 using the modified Danish...Ch. 12 - Prob. 12.28PCh. 12 - Prob. 12.29PCh. 12 - Figure 12.49a shows a pile. Let L = 15 m, D (pile...Ch. 12 - Redo Problem 12.30 assuming that the water table...Ch. 12 - Refer to Figure 12.49b. Let L = 18 m, fill = 17...Ch. 12 - Estimate the group efficiency of a 4 6 pile...Ch. 12 - The plan of a group pile is shown in Figure...Ch. 12 - Prob. 12.35PCh. 12 - Figure P12.36 shows a 3 5 pile group consisting...Ch. 12 - Prob. 12.37P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- In Problem 18.4, find the maximum bending moment in the sheet pile and determine the required section modulus, assuming an allowable stress of 190 MN/m2. 18.4 Refer to Figure 18.13. Given L1 = 1.5 m, L2 = 3 m; for the sand, =33, =16.5kN/m3, sat=19.0kN/m3; and, for the clay, c=50kN/m2, =0, sat=20kN/m3. Determine the depth of sheet pile required, allowing for a 50% increase from the theoretical estimate.arrow_forwardA 500 mm diameter are 20 m long concrete pile is driven into a sand where = 18.5 kN/m3 and = 32. Assuming = 0.7 and K = 1.5 Ko, determine the load-carrying capacity of the pile, with a factor of safety of 3. Use Meyerhofs method [Eq. (12.18)] for computing the point load-carrying capacity Qp, and Eqs. (12.42) and (12.43) for computing the load-carrying capacity of the pile shaft Qs.arrow_forwardIn Problem 14.6, assume that Dactual = 1.3 Dtheory.a. Determine the theoretical maximum moment.b. Using Rowe’s moment reduction technique, choose a sheet-pile section. Take E = 210 x 103 MN/m2 and σall = 210,000 kN/m2.arrow_forward
- The section of a 4 x 4 group pile in a layered saturated clay is shown in Figure P 9.29. The piles are square in cross section (356 mm x 356 mm). The center-to-center spacing (d) of the piles is 1 m. Determine the allowable load bearing capacity of the pile group. Use FS = 3 and Table 9.10.arrow_forwardA 400 mm 400 mm square precast concrete pile of 15 m length is driven into a sand where = 18.0 kN/m3 and = 33. Assuming = 0.7 and K = 1.4 Ko, determine the load-carrying capacity of the pile with a factor of safety of 3. Use Meyerhofs method [Eq. (12.18)] for computing the point load-carrying capacity Qp, and Eqs. (12.42) and (12.43) for computing the load-carrying capacity of the pile shaft Qs.arrow_forwardA 600 mm diameter and 25 m long driven concrete pile carries a column load of 1200 kN. It is estimated that the shaft carries 900 kN and the point carries 300 kN. Determine the settlement of the pile head using the Poulos and Davis method with the following data: Es = 25 MN/m2, Ep = 30,000 MN/m2, and s = 0.2arrow_forward
- Refer to Figure 18.13. Given L1 = 1.5 m, L2 = 3 m; for the sand, =33, =16.5kN/m3, sat=19.0kN/m3; and, for the clay, c=50kN/m2, =0, sat=20kN/m3. Determine the depth of sheet pile required, allowing for a 50% increase from the theoretical estimate.arrow_forwardA 400-mm diameter and 15 m long concrete pile is driven into a sand where = 18.0 kN/m3 and = 31. Assuming = 0.65 and K = 1.4 Ko, determine the load carrying capacity of the pile with a factor of safety of 3.arrow_forwardProblem #1 The figure below shows a cantilever sheet-pile wall penetrating a granular soil. Here, L1 = 4 m, L2 = 8 m, unit weight above water table= 16.1 kN/m3, saturated unit weight = 5 18.2 kN/m3, and friction angle of sand = 32 degrees. a. What is the theoretical depth of embedment, D? b. For a 30% increase in D, what should be the total length of the sheet piles? c. Determine the theoretical maximum moment of the sheet pile. d. If the allowable flexural stress = 170 MPa, compute the required section modulus of the sheet pile.arrow_forward
- A 300 mm diameter steel pipe pile with 10 mm wall thickness is to be driven to a depth of 15 m in a stiff clay having ET = 100 MPa. The side friction capacity, ΣfnAs, is 750 kN and the toe bearing capacity, q'nAt, is 210 kN. The expected service load will be 310 kN. Using the Fleming simplified method, compute the expected settlement. Assume fn is constant along the length of the pile.arrow_forwardA 600mm diameter pile is embedded in 3 layers of dense sand at a depth of 17m. Nq = 86. The groundwater table is situated between Layers 2 and 3. The layers have the following properties: Layer 1: γ = 16.9 kN/m3. 3m thick. Layer 2: γ = 17.6 kN/m3. 5.5m thick. Layer 3: γsat = 19.65 kN/m3. K is 0.9 and tan α = 0.37. The factor of safety is 3.0. What is the allowable axial load capacity of the pile in kN? 5476.785 1750.169 1127.606 2439.011 None of the choices 2365.846 Please answer this asap. For upvote. Thank you very mucharrow_forwardA 600mm diameter pile is embedded in 3 layers of dense sand at a depth of 17m. Nq = 86. The groundwater table is situated between Layers 2 and 3. The layers have the following properties: Layer 1: γ = 16.9 kN/m3. 3m thick. Layer 2: γ = 17.6 kN/m3. 5.5m thick. Layer 3: γsat = 19.65 kN/m3. K is 0.9 and tan α = 0.37. The factor of safety is 3.0. What is the skin friction resistance of the pile in kN? What is the skin friction resistance of the pile in kN? None of the choices 1684.170 1477.156 1257.150 1322.744 866.118 Please answer this asap. For upvote. Thank you very mucharrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Principles of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781337705028Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage LearningFundamentals of Geotechnical Engineering (MindTap...Civil EngineeringISBN:9781305635180Author:Braja M. Das, Nagaratnam SivakuganPublisher:Cengage LearningPrinciples of Foundation Engineering (MindTap Cou...Civil EngineeringISBN:9781305081550Author:Braja M. DasPublisher:Cengage Learning
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Fundamentals of Geotechnical Engineering (MindTap...
Civil Engineering
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781305081550
Author:Braja M. Das
Publisher:Cengage Learning
How to build angle braces; Author: Country Living With The Harnish's;https://www.youtube.com/watch?v=3cKselS6rxY;License: Standard Youtube License