To determine
Select the alternative.
Expert Solution & Answer
Explanation of Solution
Time period is denoted by n and the interest is denoted by i. Equivalent annual cost (EUAC) of alternate nothing can be calculated as follows.
Equivalent annual cost of alternate nothing is $10,000.
Increasing rate is denoted by f. Equivalent annual cost (EUAC) of alternate culvert can be calculated as follows.
Equivalent annual cost of alternate culvert is $7,688. The equivalent annual cost is lower for the alternate culvert. Thus, select alternate culvert.
Want to see more full solutions like this?
Subscribe now to access step-by-step solutions to millions of textbook problems written by subject matter experts!
Students have asked these similar questions
"A financial investor has $31,000 to invest. The choices have been narrowed down to the following two options.-OPTION 1:Invest in a foreign bond that will mature in one year. This will entail an immediate brokerage fee of $100. For simplicity, assume that the bond will provide interest of $2,470, $2,130, or $1,527 over the one-year period and that the probabilities of these occurrences are assessed to be 0.29, 0.43, and 0.28, respectively.-OPTION 2:Invest in a $31,000 certificate with a savings-and-loan association. Assume that this certificate has an effective annual rate of 5.6%.Which form of the investment should the investor choose in order to maximize her expected financial gains? Enter the expected net gain (total return - initial investment - fee) of the preferred option."
Hudson Corporation is considering three options for managing its data processing operation: continuing with its own staff, hiring an outside vendor to do the managing (referred to as outsourcing), or using a combination of its own staff and an outside vendor. The cost of the operation depends on future demand. The annual cost of each option (in thousands of dollars) depends on demand as follows:
Demand
Staffing Options
High
Medium
Low
Own staff
650
650
600
Outside vendor
900
600
300
Combination
800
650
500
If the demand probabilities are 0.2, 0.5, and 0.3, which decision alternative will minimize the expected cost of the data processing operation?What is the expected annual cost associated with that recommendation?Expected annual cost = $
Construct a risk profile for the optimal decision in part (a).The input in the box below will not be graded, but may be reviewed and considered by your instructor.What is the probability of the cost…
Find the expected value assuming the risk factor is 30 % and the interest rate 12%, if you will receive $20,000 one year from today.please show work
Chapter 12 Solutions
EBK ENGINEERING ECONOMY
Ch. 12 - Prob. 1PCh. 12 - Prob. 2PCh. 12 - A new snow making machine utilizes technology that...Ch. 12 - Prob. 4PCh. 12 - Prob. 5PCh. 12 - Prob. 6PCh. 12 - Prob. 7PCh. 12 - Prob. 8PCh. 12 - Prob. 9PCh. 12 - Prob. 10P
Ch. 12 - Prob. 11PCh. 12 - Prob. 12PCh. 12 - Prob. 13PCh. 12 - Prob. 14PCh. 12 - Prob. 15PCh. 12 - Prob. 16PCh. 12 - Prob. 17PCh. 12 - Prob. 18PCh. 12 - Prob. 19PCh. 12 - Prob. 20PCh. 12 - Prob. 21PCh. 12 - Prob. 22PCh. 12 - If the interest rate is 8% per year, what decision...Ch. 12 - Prob. 24PCh. 12 - Prob. 25PCh. 12 - Prob. 26SE
Knowledge Booster
Similar questions
- A manager has to decide whether to prepare a bid or not. It costs P5,000 to prepare the bid. If the bid is submitted, the probability that the contract will be awarded is 50%. If the company is awarded the contract, it may earn an income of P100,000 if it succeeds, or pay a fine of P8,000 if it fails. The probability of success is estimated to be 80%. What is the expected value if the contract is awarded?arrow_forwardAn aggressive investment in Industry 4.0 next-generation technology has the potential to save your company $7M if it is very successful, or $3M if it is moderately successful, but it will cost $2M if it fails. The relative risk for the project is $1.25M. The company has a risk tolerance of $1 million and has assigned a utility value of .777 based on an exponential utility function for this investment. What is the value of a safe investment that the company would just as soon choose rather than investing in the IT project? A. $2M B. $1.5M C. 52.75 D. $1.25Marrow_forwardYou live in an area where there is a possibility of a massive earthquake, so consider purchasing earthquake insurance for your home at an annual cost of $180. The probability of an earthquake damaging your home in the course of a year is 0.001. If this occurs, you estimate that the cost of the damage (fully covered by insurance) will be $160,000. Your total assets (including the house) are worth $250,000. a) Apply the maximum expected value decision rule to determine the alternative (to buy insurance or not) that maximizes the value of your assets after one year. b) You developed a utility function that measures the value of your assets in x dollars (x ≥ 0). This utility function is U(x) = √x. Compare the utility of reducing the total of your assets for the next year by a value equal to the value of the insurance, with the expected utility next year of not purchasing tremor insurance. Should you purchase the insurance?arrow_forward
- The probabilities that the life of a machine will vary from 6 to 12 years are given in the table below. The expected life of the machine is ____________. Life , Years 6 7 8 9 10 11 12 Probability 0.10 0.15 0.25 0.15 0.20 0.10 0.05arrow_forwardA new product has the following profit projections and associated probabilities: Profit Probability $150,000 0.10 $100,000 0.25 $ 50,000 0.20 $0 0.15 -$ 50,000 0.20 -$100,000 0.10 Use the expected value approach to decide whether to market the new product. Because of the high dollar values involved, especially the possibility of a $100,000 loss, the marketing vice president has expressed some concern about the use of the expected value approach. As a consequence, if a utility analysis is performed, what is the appropriate lottery? Assume that the following indifference probabilities are assigned. Do the utilities reflect the behavior of a risk taker or a risk avoider? Profit Indifference Probability $100,000 0.95 $ 50,000 0.70 $0 0.50 -$ 50,000 0.25arrow_forwardA road between Fairbanks and Nome, Alaska, will have a most likely construction cost of $7 million per mile. Doubling this cost is considered to have a probability of 30%, and cutting it by 25% is considered to have a probability of 10%. The state’s interest rate is 4%, and the road should last 25 years before major reconstruction. What is the probability distribution of the equivalent annual construction cost per mile?arrow_forward
- A manager must decide how many machines of a certain type to buy. The machines will be used to manufacture a new gear for which there is increased demand. The manager has narrowed the decision to two alternatives: buy one machine or buy two. If only one machine is purchased and demand is more than it can handle, a second machine can be purchased at a later time. However, the cost per machine would be lower if the two machines were purchased at the same time. The estimated probability of low demand is .30, and the estimated probability of high demand is .70. The net present value associated with the purchase of two machines initially is 950,000 if demand is low and 1,300,000 if demand is high. The net present value for one machine and low demand is 900,000. If demand is high, there are three options. One option is to do nothing, which would have a net present value of 1,000,000. A second option is to subcontract; that would have a net present value of 1,400,000. The third option is to…arrow_forwardThe current average diesel price is about 145 pence per litre. Your friend firmly believes that the average diesel price will shoot over 160 pence per litre for the Christmas period due to supply and logistics problems while you think, with the mitigation policies from the government, that there is a 60% probability that it will remain below 160 pence per litre. The two of you decide to bet on the outcome with x pounds: if you win, your friend pays you x pounds and vice versa. Your current wealth is 5,000 pounds which is also the maximum amount you can bet. As an expected utility maximiser, should you bet, and why or why not? If you do bet, what is the optimal amount that you should bet to maximise your expected utility?arrow_forwardPlayers would draw a card from a standard 52 card deck. Whatever card they drew determined what they won. If they draw a face card (Jack, King, Queen) then they win $5. If they draw an Ace, they win $15. For all other cards, they win nothing. A. Fill out the probability distribution table with the probabilities of each possible outcome for this game. Round decimals to four places. x $15 $5 $0 P(x) B. What is the expected value of the distribution above? (Round to the nearest cent, two decimal places.) C. If players were charged $2 per game, would they make and average profit on the games over time, or would they take an average loss over time? D. If players were charged $3 per game, would they make and average profit on the games over time, or would they take an average loss over time?arrow_forward
- A drug company is considering investing $100 million today to bring a weight loss pill to the market. At the end of one year, the firm will know the payoff; there is a 0.50 probability that the pill will sell at a high price and generate $37 million per year of profit forever and a 0.50 probability that the pill will sell at a low price and generate $I million per year of profit forever. The interest rate is 10%. Suppose the firm decides to wait one year to determine whether the pill will sell at a high or low price. The firm will not invest if it learns that the pill will sell at a low price. What is the net present value of waiting one year to make the investment?O $88 millionO$122.72 millionO $201.22 millionO $64.5 millionarrow_forwardThe management of First American Bank was concerned about the potential loss that might occur in the event of a physical catastrophe such as a power failure or a fire. The bank estimated that the loss from one of these incidents could be as much as $100 million, including losses due to interrupted service and customer relations. One project the bank is considering is the installation of an emergency power generator at its operations headquarters. The cost of the emergency generator is $800,000, and if it is installed, no losses from this type of incident will be incurred. However, if the generator is not installed, there is a 10% chance that a power outage will occur during the next year. If there is an outage, there is a .05 probability that the resulting losses will be very large, or approximately $80 million in lost earnings. Alternatively, it is estimated that there is a .95 probability of only slight losses of around $1 million. Using decision tree analysis, determine whether the…arrow_forwardIt is well established that indoor air quality (IAQ) has a significant effect on general health and productivity of employees at a workplace. A study showed that enhancing IAQ by increasing the building ventilation from 5 cfm (cubic feet per minute) to 20 cfm increased the productivity by 0.25 percent, valued at $90 per person per year, and decreased the respiratory illnesses by 10 percent for an average annual savings of $39 per person while increasing the annual energy consumption by $6 and the equipment cost by about $4 per person per year (ASHRAE Journal, December 1998). For a workplace with 120 employees, determine the net monetary benefit of installing an enhanced IAQ system to the employer per year.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Managerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning