To determine
Concept Introduction:
Budgets:
Budgets are prepared to estimate the revenue, costs, receipts and payments for the business. There are several types of budgets prepared for a business. Few major types of budgets prepared are as follows:
- Sales
budget - Cash Collection budget
- Production budget
- Raw material purchase budget
- Expenses Budgets
- Cash disbursement budget
To Prepare:
The Direct Material Purchases Budget
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Direct materials purchases budgetCoca-Cola Enterprises (CCE) is the largest bottler of Coca-Cola® in Western Europe. The company purchases Coke® and Sprite® concentrate from The Coca-Cola Company (K0), dilutes and mixes the concentrate with carbonated water, and then fills the blended beverage into cans or plastic two-liter bottles. Assume that the estimated production for Coke and Sprite two-liter bottles at the Wakefield, UK, bottling plant is as follows for the month of May:
coke
153,000 two liter bottles
sprite
86,500 two litre bottles
In addition, assume that the concentrate costs $75 per pound for both Coke and Sprite and is used at a rate of 0.15 pound per 100 liters of carbonated water in blending Coke and 0.10 pound per 100 liters of carbonated water in blending Sprite. Assume that two liters ofcarbonated water are used for each two-liter bottle of finished product. Assume further that two-liter bottles cost $0.08 per bottle and carbonated water costs $0.06 per liter.…
Direct materials purchases budgetCoca-cola Enterprises (CCE) is the largest bottler of Coca-cola inWestern Europe. The company purchases Coke and Sprite concentrate
from The Coca-cola Company (KO), dilutes and mixes the concentratewith carbonated water, and then fills the blended beverage into cans orplastic two-liter bottles. Assume that the estimated production for Cokeand Sprite two-liter bottles at the Wakefield, UK, bottling plant is asfollows for the month of May:
CokeSprite
153,000 two-liter bottles86,500 two-liter bottles
In addition, assume that the concentrate costs $75 per pound for both Coke and Sprite and is used at a rate of 0.15 pound per 100 liters ofcarbonated water in blending Coke and 0.10 pound per 100 liters ofcarbonated water in blending Sprite. Assume that two liters ofcarbonated water are used for each two-liter bottle of finished product.Assume further that two-liter bottles cost $0.08 per bottle and carbonated water costs $0.06 per liter.Prepare a direct…
Direct Materials Purchases Budget
Soda Company is the largest bottler in Western Europe. The company purchases Brand 1 and Brand 2 concentrate from The Soda Company, dilutes and mixes the concentrate with carbonated water, and then fills the blended beverage into cans or plastic two-liter bottles. Assume that the estimated production for Brand 1 and Brand 2 two-liter bottles at the Wakefield, UK, bottling plant are as follows for the month of May:
Brand 1
134,000 two-liter bottles
Brand 2
102,000 two-liter bottles
In addition, assume that the concentrate costs $81 per pound for both Brand 1 and Brand 2 and is used at a rate of 0.2 pound per 100 liters of carbonated water in blending Brand 1 and 0.25 pound per 100 liters of carbonated water in blending Brand 2. Assume that two liters of carbonated water are used for each two-liter bottle of finished product. Assume further that two-liter bottles cost $0.098 per bottle and carbonated water costs $0.078 per liter.
Prepare a…
Chapter 13 Solutions
CengageNOWv2, 1 term Printed Access Card for Warren's Survey of Accounting, 8th
Ch. 13 - Static budgets are often used: A.By production...Ch. 13 - The total estimated sales for the coming year is...Ch. 13 - Dixon Company expects $650,000 of credit sales in...Ch. 13 - The actual and standard direct materials costs for...Ch. 13 - Bower Company produced 4,000 units of product. The...Ch. 13 - Prob. 1CDQCh. 13 - What is the manager’s role in a responsibility...Ch. 13 - Briefly describe the type of human behavior...Ch. 13 - Give an example of budgetary slack.Ch. 13 - What behavioral problems are associated with...
Ch. 13 - Prob. 6CDQCh. 13 - Prob. 7CDQCh. 13 - Under what circumstances would a static budget be...Ch. 13 - How do computerized budgeting systems aid firms in...Ch. 13 - What is the first step in preparing a master...Ch. 13 - Why should the production requirements set forth...Ch. 13 - Why should the timing of direct materials...Ch. 13 - Prob. 13CDQCh. 13 - Prob. 14CDQCh. 13 - Prob. 15CDQCh. 13 - Prob. 16CDQCh. 13 - Prob. 17CDQCh. 13 - Prob. 18CDQCh. 13 - What is meant by reporting by the "principle of...Ch. 13 - Prob. 20CDQCh. 13 - How are standards used in budgetary performance...Ch. 13 - a. What are the two variances between the actual...Ch. 13 - Prob. 23CDQCh. 13 - Prob. 24CDQCh. 13 - Prob. 25CDQCh. 13 - Prob. 26CDQCh. 13 - Flexible budget for selling and administrative...Ch. 13 - Static budget vs. flexible budget The production...Ch. 13 - Flexible budget for Fabrication Department...Ch. 13 - Sales and production budgets Ultimate Audio...Ch. 13 - Professional fees earned budget Day & Spieth,...Ch. 13 - Professional labor cost budget Based on the data...Ch. 13 - Direct materials purchases budget Zippy's Frozen...Ch. 13 - Prob. 13.8ECh. 13 - Prob. 13.9ECh. 13 - Production and direct labor cost budgets Levi...Ch. 13 - Factory overhead cost budget Nutty Candy Company...Ch. 13 - Cost of goods sold budget The controller of Pueblo...Ch. 13 - Prob. 13.13ECh. 13 - Schedule of cash collections of accounts...Ch. 13 - Schedule of cash payments Tadpole Learning Systems...Ch. 13 - Schedule of cash payments Organic Physical Therapy...Ch. 13 - Capital expenditures budget On August 1, 20Y4. the...Ch. 13 - Standard product cost Sorrento Furniture Company...Ch. 13 - Prob. 13.19ECh. 13 - Direct materials variances The following data...Ch. 13 - Standard direct materials cost per unit from...Ch. 13 - Standard product cost, direct materials variance...Ch. 13 - Direct labor variances The following data relate...Ch. 13 - Prob. 13.24ECh. 13 - Direct materials and direct labor variances At the...Ch. 13 - Prob. 13.26ECh. 13 - Factory overhead cost variances The following data...Ch. 13 - Prob. 13.28ECh. 13 - Factory overhead variance corrections The data...Ch. 13 - Prob. 13.30ECh. 13 - Sales, production, direct materials purchases, and...Ch. 13 - Sales, production, direct materials purchases, and...Ch. 13 - Sales, production, direct materials purchases, and...Ch. 13 - Sales, production, direct materials purchases, and...Ch. 13 - Budgeted income statement and supporting budgets...Ch. 13 - Budgeted income statement and supporting budgets...Ch. 13 - Budgeted income statement and supporting budgets...Ch. 13 - Budgeted income statement and supporting budgets...Ch. 13 - Budgeted income statement and supporting budgets...Ch. 13 - Budgeted income statement and supporting budgets...Ch. 13 - Prob. 13.2.7PCh. 13 - Budgeted income statement and supporting budgets...Ch. 13 - Cash budget The controller of Shoe Mart Inc. asks...Ch. 13 - Cash budget The controller of Shoe Mart Inc. asks...Ch. 13 - Direct materials and direct labor variance...Ch. 13 - Direct materials and direct labor, variance...Ch. 13 - Prob. 13.6.1PCh. 13 - Prob. 13.6.2PCh. 13 - Prob. 13.6.3PCh. 13 - Prob. 13.6.4PCh. 13 - Prob. 13.6.5PCh. 13 - Standards for nonmanufacturing expenses The...Ch. 13 - Prob. 13.7PCh. 13 - Prob. 13.1.1MBACh. 13 - Prob. 13.1.2MBACh. 13 - Prob. 13.1.3MBACh. 13 - Prob. 13.1.4MBACh. 13 - Prob. 13.1.5MBACh. 13 - Prob. 13.1.6MBACh. 13 - Prob. 13.2.1MBACh. 13 - Prob. 13.2.2MBACh. 13 - Prob. 13.2.3MBACh. 13 - Prob. 13.2.4MBACh. 13 - Process yield Hendrick Motorsports sponsors cars...Ch. 13 - Prob. 13.3.1MBACh. 13 - Prob. 13.3.2MBACh. 13 - Prob. 13.3.3MBACh. 13 - Prob. 13.3.4MBACh. 13 - Prob. 13.4.1MBACh. 13 - Prob. 13.4.2MBACh. 13 - Prob. 13.4.3MBACh. 13 - Prob. 13.4.4MBACh. 13 - Prob. 13.5.1MBACh. 13 - Prob. 13.5.2MBACh. 13 - Prob. 13.5.3MBACh. 13 - Prob. 13.5.4MBACh. 13 - Utilization rate Delta Air Lines (DAL) reported...Ch. 13 - Prob. 13.6.2MBACh. 13 - Prob. 13.6.3MBACh. 13 - Prob. 13.7.1MBACh. 13 - Prob. 13.7.2MBACh. 13 - Prob. 13.7.3MBACh. 13 - Ethics and professional conduct in business The...Ch. 13 - Prob. 13.2.1CCh. 13 - Prob. 13.2.2CCh. 13 - Prob. 13.3.1CCh. 13 - Prob. 13.3.2CCh. 13 - Objectives of the master budget Domino's Pizza LLC...Ch. 13 - Prob. 13.5.1CCh. 13 - Prob. 13.5.2CCh. 13 - Prob. 13.6CCh. 13 - Prob. 13.7C
Knowledge Booster
Similar questions
- Preparing a Direct Materials Purchases Budget Tulum Inc. makes a Mexican chocolate mix sold in 4-pound boxes. Planned production in units for the first 3 months of the coming year is: Each box requires 4.2 pounds of chocolate mix and one box. Company policy requires that ending inventories of raw materials for each month be 10% of the next months production needs. That policy was met for the ending inventory of December in the prior year. The cost of 1 pound of chocolate mix is 1.50. The cost of one box is 0.10. (Note: Round all unit amounts to the nearest unit. Round all dollar amounts to the nearest dollar.) Required: 1. Calculate the ending inventory of chocolate mix in pounds for December of the prior year and for January and February. What is the beginning inventory of chocolate mix for January? 2. Prepare a direct materials purchases budget for chocolate mix for the months of January and February. 3. Calculate the ending inventory of boxes for December of the prior year and for January and February. 4. Prepare a direct materials purchases budget for boxes for the months of January and February.arrow_forwardTransferred-In Cost Powers Inc. produces a protein drink. The product is sold by the gallon. The company has two departments: mixing and bottling. For August, the bottling department had 70,000 gallons in beginning inventory (with transferred-in costs of 283,000) and completed 262,500 gallons during the month. Further, the mixing department completed and transferred out 240,000 gallons at a cost of 957,000 in August. Required: 1. Prepare a physical flow schedule for the bottling department. 2. Calculate equivalent units for the transferred-in category. 3. Calculate the unit cost for the transferred-in category.arrow_forwardPreparing a Direct Materials Purchases Budget Patrick Inc. makes industrial solvents sold in 5-gallon drums. Planned production in units for the first 3 months of the coming year is: Each drum requires 5.5 gallons of chemicals and one plastic drum. Company policy requires that ending inventories of raw materials for each month be 15% of the next months production needs. That policy was met for the ending inventory of December in the prior year. The cost of one gallon of chemicals is 2.00. The cost of one drum is 1.60. (Note: Round all unit amounts to the nearest unit. Round all dollar amounts to the nearest dollar.) Required: 1. Calculate the ending inventory of chemicals in gallons for December of the prior year and for January and February. What is the beginning inventory of chemicals for January? 2. Prepare a direct materials purchases budget for chemicals for the months of January and February. 3. Calculate the ending inventory of drums for December of the prior year and for January and February. 4. Prepare a direct materials purchases budget for drums for the months of January and February.arrow_forward
- Transferred-In Cost Vigor Inc. produces an energy drink. The product is sold by the quart. The company has two departments: mixing and bottling. For May, the bottling department had 30,000 quarts in beginning inventory (with transferred-in costs of 63,000) and completed 140,000 quarts during the month. Further, the mixing department completed and transferred out 120,000 gallons at a cost of 237,000 in May. Required: 1. Prepare a physical flow schedule for the bottling department. 2. Calculate equivalent units for the transferred-in category. 3. Calculate the unit cost for the transferred-in category.arrow_forwardProduction budget Healthy Measures Inc. produces a Bath and Gym version of its popular electronic scale. The anticipated unit sales for the scales by sales region are as follows: The finished goods inventory estimated for March 1, for the Bath and Gym scale models is 11,800 and 8,100 units, respectively. The desired finished goods inventory for March 31 for the Bath and Gym scale models is 15,000 and 7,500 units, respectively. Prepare a production budget for the Bath and Gym scales for the month ended March 31.arrow_forwardPilsner Inc. purchases raw materials on account for use in production. The direct materials purchases budget shows the following expected purchases on account: Pilsner typically pays 25% on account in the month of billing and 75% the next month. Required: 1. How much cash is required for payments on account in May? 2. How much cash is expected for payments on account in June?arrow_forward
- Operating Budget, Comprehensive Analysis Allison Manufacturing produces a subassembly used in the production of jet aircraft engines. The assembly is sold to engine manufacturers and aircraft maintenance facilities. Projected sales in units for the coming 5 months follow: The following data pertain to production policies and manufacturing specifications followed by Allison Manufacturing: a. Finished goods inventory on January 1 is 32,000 units, each costing 166.06. The desired ending inventory for each month is 80% of the next months sales. b. The data on materials used are as follows: Inventory policy dictates that sufficient materials be on hand at the end of the month to produce 50% of the next months production needs. This is exactly the amount of material on hand on December 31 of the prior year. c. The direct labor used per unit of output is 3 hours. The average direct labor cost per hour is 14.25. d. Overhead each month is estimated using a flexible budget formula. (Note: Activity is measured in direct labor hours.) e. Monthly selling and administrative expenses are also estimated using a flexible budgeting formula. (Note: Activity is measured in units sold.) f. The unit selling price of the subassembly is 205. g. All sales and purchases are for cash. The cash balance on January 1 equals 400,000. The firm requires a minimum ending balance of 50,000. If the firm develops a cash shortage by the end of the month, sufficient cash is borrowed to cover the shortage. Any cash borrowed is repaid at the end of the quarter, as is the interest due (cash borrowed at the end of the quarter is repaid at the end of the following quarter). The interest rate is 12% per annum. No money is owed at the beginning of January. Required: 1. Prepare a monthly operating budget for the first quarter with the following schedules. (Note: Assume that there is no change in work-in-process inventories.) a. Sales budget b. Production budget c. Direct materials purchases budget d. Direct labor budget e. Overhead budget f. Selling and administrative expenses budget g. Ending finished goods inventory budget h. Cost of goods sold budget i. Budgeted income statement j. Cash budget 2. CONCEPTUAL CONNECTION Form a group with two or three other students. Locate a manufacturing plant in your community that has headquarters elsewhere. Interview the controller for the plant regarding the master budgeting process. Ask when the process starts each year, what schedules and budgets are prepared at the plant level, how the controller forecasts the amounts, and how those schedules and budgets fit in with the overall corporate budget. Is the budgetary process participative? Also, find out how budgets are used for performance analysis. Write a summary of the interview.arrow_forwardDirect Materials Purchases Budget Soda Company is the largest bottler in Western Europe. The company purchases Brand 1 and Brand 2 concentrate from The Soda Company, dilutes and mixes the concentrate with carbonated water, and then fills the blended beverage into cans or plastic two-liter bottles. Assume that the estimated production for Brand 1 and Brand 2 two-liter bottles at the Wakefield, UK, bottling plant are as follows for the month of May: Brand 1 62,000 two-liter bottles Brand 2 47,000 two-liter bottles In addition, assume that the concentrate costs $72 per pound for both Brand 1 and Brand 2 and is used at a rate of 0.2 pound per 100 liters of carbonated water in blending Brand 1 and 0.25 pound per 100 liters of carbonated water in blending Brand 2. Assume that two liters of carbonated water are used for each two-liter bottle of finished product. Assume further that two-liter bottles cost $0.087 per bottle and carbonated water costs $0.067 per liter. Prepare a direct…arrow_forwardDirect Materials Purchases Budget Soda Company is the largest bottler in Western Europe. The company purchases Brand 1 and Brand 2 concentrate from The Soda Company, dilutes and mixes the concentrate with carbonated water, and then fills the blended beverage into cans or plastic two-liter bottles. Assume that the estimated production for Brand 1 and Brand 2 two-liter bottles at the Wakefield, UK, bottling plant are as follows for the month of May: Brand 1 67,000 two-liter bottles Brand 2 51,000 two-liter bottles In addition, assume that the concentrate costs $70 per pound for both Brand 1 and Brand 2 and is used at a rate of 0.1 pound per 100 liters of carbonated water in blending Brand 1 and 0.15 pound per 100 liters of carbonated water in blending Brand 2. Assume that two liters of carbonated water are used for each two-liter bottle of finished product. Assume further that two-liter bottles cost $0.075 per bottle and carbonated water costs $0.055 per liter. Prepare a direct…arrow_forward
- Direct Materials Purchases Budget Coca-Cola Enterprises (CCE) is the largest bottler of Coca-Cola® in Western Europe. The company purchases Coke® and Sprite® concentrate from The Coca-Cola Company (K0), dilutes and mixes the concentrate with carbonated water, and then fills the blended beverage into cans or plastic two-liter bottles. Assume that the estimated production for Coke and Sprite two-liter bottles at the Wakefield, UK, bottling plant is as follows for the month of May: Coke 153,000 two-liter bottles Sprite 86,500 two-liter bottles In addition, assume that the concentrate costs $75 per pound for both Coke and Sprite and is used at a rate of 0.15 pound per 100 liters of carbonated water in blending Coke and 0.10 pound per 100 liters of carbonated water in blending Sprite. Assume that two liters of carbonated water are used for each two-liter bottle of finished product. Assume further that two-liter bottles cost $0.08 per bottle and carbonated water costs $0.06 per…arrow_forwardDirect Materials Purchases Budget Coca-Cola Enterprises is the largest bottler of Coca-Cola® in North America. The company purchases Coke® and Sprite® concentrate from The Coca-Cola Company, dilutes and mixes the concentrate with carbonated water, and then fills the blended beverage into cans or plastic two-liter bottles. Assume that the estimated production for Coke and Sprite two-liter bottles at the Dallas, Texas, bottling plant are as follows for the month of October: Coke 1,500,000 two-liter bottles Sprite 800,000 two-liter bottles In addition, assume that the concentrate costs $75 per pound for Coke and Sprite. The concentrate is used at a rate of 0.20 pound per 100 liters of carbonated water in blending Coke and at a rate of 0.15 pound per 100 liters of carbonated water in blending Sprite. Assume that two-liter bottles cost $0.04 per bottle and carbonated water costs $0.03 per liter. Prepare a direct materials purchases budget for October, assuming no changes between…arrow_forwardDirect Materials Purchases Budget Langer Company produces plastic items, including plastic housings for humidifiers. Each housing requires about 21 ounces of plastic costing $0.1 per ounce. Langer molds the plastic into the proper shape. Langer has budgeted production of the housings for the next 4 months as follows: Units July 3,500 August 4,400 September 4,900 October 6,300 Inventory policy requires that sufficient plastic be in ending monthly inventory to satisfy 30% of the following month's production needs. The inventory of plastic at the beginning of July equals exactly the amount needed to satisfy the inventory policy. Required: Prepare a direct materials purchases budget for July, August, and September, showing purchases in units and in dollars for each month and in total. If required, round the total purchase cost to nearest whole value.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Managerial AccountingAccountingISBN:9781337912020Author:Carl Warren, Ph.d. Cma William B. TaylerPublisher:South-Western College PubManagerial Accounting: The Cornerstone of Busines...AccountingISBN:9781337115773Author:Maryanne M. Mowen, Don R. Hansen, Dan L. HeitgerPublisher:Cengage Learning
Managerial Accounting
Accounting
ISBN:9781337912020
Author:Carl Warren, Ph.d. Cma William B. Tayler
Publisher:South-Western College Pub
Managerial Accounting: The Cornerstone of Busines...
Accounting
ISBN:9781337115773
Author:Maryanne M. Mowen, Don R. Hansen, Dan L. Heitger
Publisher:Cengage Learning