Traffic and Highway Engineering - With Mindtap
5th Edition
ISBN: 9781305360990
Author: Garber
Publisher: CENGAGE L
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 13, Problem 22P
To determine
The short report of proposal and recommendation of building bypass around CBD in a medium-sized city.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A)You are a transportation planner working for a city government and you are preparing yourself for a public hearing to discuss a future proposed road infrastructure project. The project will require claiming private land from three neighbors who live in the city. Write an outline of what you will state (say) during this public hearing.
B)As a transportation planner, you may be required to prepare a Parking Management Plan. Explain clearly how you would go be developing such a
What are the steps that an engineer should take if he/she is requested to evaluate the need for a new highway to replace the existing one?
Create a new highway design. Choose any area of the Philippines where you believe a road infrastructure would be necessary to enhance the city's or province's current transportation system and stimulate the local economy.
This study must include the following:
- Considering alignment, cross-section, pavement design, signage use, and safety features during design or improvement.
-Create a maintenance and rehabilitation plan for the new highway you propose, or for the proposed renovation of the current highway.
Chapter 13 Solutions
Traffic and Highway Engineering - With Mindtap
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- Describe the process of environmental impact assessment (EIA) in transportation projects.arrow_forwardWhat is the experts` opinion and feedback on Pasig River Expressway Projectarrow_forwardThree designs have been proposed to improve traffic flow at a major intersection in a heavily traveled suburban area. The first alternative involves improved traffic signaling. The second alternative includes traffic-signal improvements and intersection widening for exclusive left turns. The third alternative includes extensive reconstruction, including a grade separation structure. The construction costs, as well as annual maintenance and user costs, are listed in the following table for each alternative. Determine which alternative is preferred based on economic criteria if the analysis period is 20 years and the annual interest rate is 15%. Show that the result is the same using the present worth, equivalent annual cost, benefit–cost ratio, and rate-of-return methods.arrow_forward
- Three designs have been proposed to improve traffic flow at a major intersection in a heavily traveled suburban area. The first alternative involves improved traffic signaling. The second alternative includes traffic-signal improvements and intersection widening for exclusive left turns. The third alternative includes extensive reconstruction, including a grade separation structure. The construction costs, as well as annual maintenance and user costs, are listed in the following table for each alternative. Determine which alternative is preferred based on economic criteria if the analysis period is 20 years and the annual interest rate is 15%. Show that the result is the same using the present worth, equivalent annual cost, benefit–cost ratio, and rate-of-return methods. Alternatives Capital Cost ($) Annual Maintence ($) Annual User Cost ($) Salvage Value ($) Present Condition 0 15,000 600,000 0 Traffic Signal 340,000 10,000 450,000 25,000 Intersection Widening 850,000 5,000…arrow_forwardThe Pokuase Interchange is a newly commissioned four-tier interchange that connects the Nsawam Road to the George Walker Bush Highway. The Road Ministry and the Ghana Police Service are worried about hawkers, passengers that are likely to board vehicles at prescribed venues, road fittings thieves as well as the indiscriminate use of the roads by both drivers and commuters. As a planner, identify and justify the use of a planning theory or theories that you would recommend to ensure safe and efficient use of the road.arrow_forwardThe City of Gainesville and FDOT, in an attempt to proactively address the growing need for capacity in the western area of Gainesville, has identified a potential alignment for a new freeway to UF campus. The FDOT district has contracted you to design this new freeway and identify any additional concerns with this potential freeway. Note that this is an open question, and you may need to make the following assumptions during your work: Lane width (e.g., 12 ft. or 11 ft) Shoulder width (e.g., 6 ft.) Interchange density (e.g., 1 interchange/2 miles) Number of lanes (e.g., 3 or 2 lanes each direction) Hourly volume V= * D*AADT (e.g., =10%, directional distribution D=50%) A design structural number (e.g., SN= 5.0) The following traffic characteristics are expected on this freeway: AADT=30,000 veh PHF=0.95 85% passenger cars Two 2-kip single axles 7% RVs One 10-kip single axle One 24-kip tandem axle 5% single-unit trucks One 12-kip single axle Two 32-kip tandem axles 3% tractor-trailer…arrow_forward
- Give detail information about the Condition and Capacity, Operation and Maintenance, Resilience of roads in Texas and give recommendations on how they can be improved.arrow_forwardDescribe the steps that an engineer should follow if you were asked to determine the need to design a new highway to replace the current one.arrow_forwardwhat is socioeconomic characteristics in urban transportation planning?arrow_forward
- Below is a link to an intersection. Provide two different design solutions that would reduce conflicts at the intersection. Explain your solution and provide a brief rational as to how it would reduce conflicts. (Assume that property is not an issue and that buildings in the area can be relocated and don't worry about cost)arrow_forward1. Research about Project Management for Road & Bridge Projects. 2. Give example projects for roads and bridges on how they do the project and the problems they encounter during the project.arrow_forwardWhat are steps and strategies of transportation planningarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning