Engineering Economy
16th Edition
ISBN: 9780133582819
Author: Sullivan
Publisher: DGTL BNCOM
expand_more
expand_more
format_list_bulleted
Question
Chapter 13, Problem 6P
To determine
Degrees of dependency.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Why are benefit cost ratios inappropriate for evaluating alternative projects?
Describe the net future worth of the project?
Define the term cost-reduction project?
Knowledge Booster
Similar questions
- The authors mention in a few places in the chapter that benefits are overestimated while costs tend to be underestimated—they called this the “optimist’s bias.” What do they mean by this, and what effect can it have on the fair evaluation of projects?arrow_forwardIn the table below presented the data on the investment in the renewable energy source (wind farm). This wind farm will be located in the scenic area (has a visual impact on the communities close by). Costs are estimated as follows: Construction cost = $750,000 Maintenance cost = $5,000 per year for the next 15 years Cost of dismantling at the end of 15-year lifespan = $35,000 Compensation for view loss = $25 annually per household for 2,000 household Benefits as follows: Market value of electricity = $150,000 per year Directions: 1. Construct the table for CBA analysis 2. Calculate present value (PV) of costs and benefits using the CBA table 3. Conduct a CBA test (as difference between present value of benefits and costs) 4. Make a decision on investment (Yes/No)arrow_forwardUS Airways owns a piece of land near the Pittsburgh International Airport. The land originally cost USAirways $375,000. The airline is considering building a new training center on this land. US Airwaysdetermined that the proposal the new facility is acceptable if the original cost of the land is used in theanalysis, but the proposal does not meet the airline’s project acceptance criteria if the land cost is above$850,000. A developer recently offered US Airways $2.5 million for the land.Explain fully if US Airways should build the training facility at this location or not.arrow_forward
- a) Describe, in general, the flow of the decision-making process in economic engineering. b) Calculate the equilibrium price and quantity corresponding to a scenario with a demand curve represented by Cd = 1600 - 30Pb and a supply curve represented by Co = 1400 + 70Pb. c) Calculate the new quantities supplied and demanded for the scenario of letter 'b', assuming a 10% increase in the equilibrium price found above.arrow_forwardAnalyse the various issues which influence industry standards used in project costmanagement.arrow_forwardDescribe in detail why a project with a Present Worth (PW) equal to or greater than zero is economically justifiablearrow_forward
- The following data are for two mutually exclusive projects: PW(benefits) PW(operating and maintenance costs) PW(capital costs) Project A $20,000,000 $5,000,000 $5,000,000 Project B $15,500,000 $8,000,000 $1,000,000 (a) What is the benefit-cost ratio for Project A (to two decimal points): Number (b) What is the benefit-cost ratio for Project B (to two decimal points): Number (c) What is the modified benefit-cost ratio for Project A (to two decimal points)? Number (d) What is the modified benefit-cost ratio for Project B (to two decimal points)? Number (e) What is the benefit-cost ratio for the increment between projects (to two decimal points)? Number (f) What is the Present Worth of Project A? Number (g) What is the Present Worth of Project B? Number (h) Which is the preferred project (enter either 'A' or 'B')?arrow_forwardPlease answer only a. & b. Oscar has owned a Ford automobile dealership for over 25 years. Since he has been heavily involved in the sales of cars, Oscar believes that there are 3 different types of customers with the following willingness to pays: Sunroof Navigation System Customer A $3,000 $1,200 Customer B $1,800 $600 Customer C $150 $1,800 Although not realistic, assume that incremental costs are $0. As the owner of the dealerships, Oscar has the final say on pricing for each customer. Suppose that Oscar knows the willingness to pay of Customer A, B and C as soon as he meets them. What price should Oscar charge to each customer to maximize profits? What is the total amount of profits for the 3 customers and what is the total amount of consumer surplus for the 3 customers? Show your…arrow_forwardFor each of the following problems, (a) draw the cash flow diagram (as needed); (b) present clean and clear manual solutions to the problem; (c) highlight the final answer (only the final answer as required by the problem) by enclosing it within a box. Identify each of the following costs associated with owning an automobile as direct (D) or indirect (I). Assume a direct cost is one that is directly attributable to the number of miles driven. License plate Driver’s license Gasoline Highway toll fee Oil change Repairs after collision Gasoline tax Monthly loan payment Annual inspection fee Garage rentalarrow_forward
- I have a question about the following question. What is the annual breakeven production quantity (use above data, show work)? IceLess is an anti-icing solution sold in gallon plastic jugs. It is poured into the windshield washer bottle of your car. Wash your windshield and the solution prevents the glass from icing over for about four hours. Production incurs the following fixed and variable costs. It is priced initially at $5.50 per gallon. Fixed costs (per year) Variable Costs per gallon Rent: $18000 Glycol: $1.50 Utilities: 13200 FreezeFree 312: .50 Managerial salaries: 20000 Mfg labor: .20 Flammability permit: 12000 Packaging: .20 Other fixed expense: 2400 Inert ingredients: .60 Total fixed: $65600 Advertising: .30 Total: $3.30arrow_forwardAnswer the 2nd bullet point only (Engineering Economics)arrow_forwardIt is the sum of all costs that are incurred periodically and continuously in order that the project in which an investment has been made may be operated, produce a commodity or service and distribute and sell that commodity or service. Salvage cost Profit Operating cost Fixed costarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Managerial Economics: Applications, Strategies an...EconomicsISBN:9781305506381Author:James R. McGuigan, R. Charles Moyer, Frederick H.deB. HarrisPublisher:Cengage Learning
Managerial Economics: Applications, Strategies an...
Economics
ISBN:9781305506381
Author:James R. McGuigan, R. Charles Moyer, Frederick H.deB. Harris
Publisher:Cengage Learning