A company makes two types of products, A and B. These products are produced during a 40-hr work week and then shipped out at the end of the week. They require 20 and 5 kg of raw material per kg of product, respectively, and the company has access to 9500 kg of raw material per week. Only one product can be created at a time with production times for each of 0.04 and 0.12 hr, respectively. The plant can only store 550 kg of total product per week. Finally, the company makes profits of $45 and $20 on each unit of A and B, respectively. Each unit of product is equivalent to a kg.
(a) Set up the linear programming problem to maximize profit.
(b) Solve the linear programming problem graphically.
(c) Solve the linear programming problem with the simplex method.
(d) Solve the problem with a software package.
(e) Evaluate which of the following options will raise profits the most: increasing raw material, storage, or production time.
(a)
The linear programming problem to maximize the profit if the company makes profits of $45 on each unit of A and $20 on each unit of B.
Answer to Problem 1P
Solution:
The linear programming problem to maximize the profit is,
Subject to the constraints:
Explanation of Solution
Given Information:
Product A and B are produced during a 40-hr of work week.
Company has access to 9500 kg of raw material per week.
Company required 20 kg of raw material per kg of product A and 5 kg of raw material per kg of product B.
One product of A can be created in 0.04 hour and one product of B can be created in 0.12 hour.
Plant can store 550 kg of total product per week.
And, the company makes profits of $45 on each unit of A and $20 on each unit of B.
Assume
Therefore, total number of products is
But plant can store 550 kg of total product per week. Therefore, the storage constrain is,
Company required 20 kg of raw material per kg of product A and 5 kg of raw material per kg of product B. Therefore, total raw material per week is,
But the company has access to 9500 kg of raw material per week. Therefore, raw material constraint is,
One product of A can be created in 0.04 hour and one product of B can be created in 0.12 hour. Therefore, the total production time is,
Since, product A and B are produced during a 40-hr of work week. Therefore, the production time constraint is,
Since, the amount of product cannot be negative. Therefore, the positivity constraint is,
Now, the company makes profits of $45 on each unit of A and $20 on each unit of B. Therefore, maximum profit is,
Subject to the constraints:
(b)
To calculate: The solution of the linear programming problem,
Subject to the constraints:
By the graphical method.
Answer to Problem 1P
Solution:
The maximum value of P is approximately
Explanation of Solution
Given Information:
The linear programming problem,
Subject to the constraints:
Formula used:
The equation of a straight line is,
Where, m is the slope and C is the intercept of y.
Calculation:
Consider the linear programming problem,
Subject to the constraints:
Reformulate the constraints to straight lines by replacing inequality by equal sign and solving for
The above equations are the equation of straight lines and represent the constraints.
The value of P in the objective function
Plot all the straight lines.
The graph obtained is,
Hence, the maximum value of P is approximately
(c)
The solution of the linear programming problem,
Subject to the constraints:
By the Simplex method.
Answer to Problem 1P
Solution:
The values of variables are
Explanation of Solution
Given Information:
The linear programming problem,
Subject to the constraints:
Consider the provided linear programming problem,
Subject to the constraints:
First convert the above problem to standard form by adding slack variables.
As the constraints are subjected to less than condition, non- negative slack variables are added to reach equality.
Let the slack variables be
Thus, the linear programming model would be:
Subject to the constraints:
The above linear programming models consist of three non-basic variables
Now the apply the Simplex method and solve the above problem as:
Basic | Solution | Intercept | ||||||
1 | -45 | -20 | 0 | 0 | 0 | 0 | ||
0 | 20 | 5 | 1 | 0 | 0 | 9500 | 475 | |
0 | 0.04 | 0.12 | 0 | 1 | 0 | 40 | 1000 | |
0 | 1 | 1 | 0 | 0 | 1 | 550 | 550 |
The negative minimum, P is
The minimum ratio is 475 and it corresponds to basis variable S 1. So, the leaving variable is S 1.
Therefore, the pivot element is 20.
Basic | Solution | Intercept | ||||||
1 | 0 | -8.75 | 2.25 | 0 | 0 | 21375 | ||
0 | 1 | 0.25 | 0.05 | 0 | 0 | 475 | 1900 | |
0 | 0 | 0.11 | -0.002 | 1 | 0 | 21 | 190.9090 | |
0 | 0 | 0.75 | -0.05 | 0 | 1 | 75 | 100 |
The negative minimum, P is
The minimum ratio is 100 and it corresponds to basis variable S 3. So, the leaving variable is S 3.
Therefore, the pivot element is 0.75.
Basic | Solution | Intercept | ||||||
1 | 0 | 0 | 1.6667 | 0 | 11.6667 | 22250 | ||
0 | 1 | 0 | 0.0667 | 0 | -0.3333 | 450 | 1900 | |
0 | 0 | 0 | 0.0053 | 1 | -0.1467 | 10 | 190.9090 | |
0 | 0 | 1 | -0.0667 | 0 | 1.3333 | 100 | 100 |
Since
Hence, the values of variables are
(d)
The solution of the linear programming problem,
Subject to the constraints:
By the use of software.
Answer to Problem 1P
Solution:
The maximum profitis
Explanation of Solution
Given Information:
The linear programming problem,
Subject to the constraints:
Use excel solver as below, to solve the linear programming,
Step 1: Enter the coefficients of
Step 2: Use formulas in column D to find total are as below,
Step 3: click on Solver button under the Data Ribbon. Set the values in pertinent cells of Solver dialogue box as below:
Step 4: Press the solve button.
The result obtained as,
Hence, the maximum value profitis
(e)
The constraint among increasing raw material, storage or production time that gives the maximum profit.
Answer to Problem 1P
Solution:
The storage will give the maximum profit.
Explanation of Solution
Given Information:
The linear programming problem,
Subject to the constraints:
To obtain the maximum profit, the shadow price should be high.
Use excel as below to find the shadow price by generating the sensitivity report,
Follow same steps up to the step 4 of part (d) then select the report as sensitivity as below,
The sensitivity report for the linear programming problem is as follows:
From the above sensitivity report, it is observed that the storage has a high shadow price.
Hence, the storage will give the maximum profit.
Want to see more full solutions like this?
Chapter 15 Solutions
Numerical Methods For Engineers, 7 Ed
- What is a carrying capacity? What kind of model has a carrying capacity built into its formula? Why does this make sense?arrow_forwardIf during the following year it is predicted that each comedy skit will generate 30 thousand and each musical number 20 thousand, find the maximum income for the year. A television program director must schedule comedy skits and musical numbers for prime-time variety shows. Each comedy skit requires 2 hours of rehearsal time, costs 3000, and brings in 20,000 from the shows sponsors. Each musical number requires 1 hour of rehearsal time, costs 6000, and generates 12,000. If 250 hours are available for rehearsal and 600,000 is budgeted for comedy and music, how many segments of each type should be produced to maximize income? Find the maximum income.arrow_forwardThe half-life of radioactive iodine is 60 days. How much of a 50-mg sample will be left in 40 days?arrow_forward
- The half-life of radioactive iodine is 60 days. How much of a 50 mg sample will be left in 40 days?arrow_forwardThe half-life of magnesium-27 is 9.45 minutes. How much of a 10-mg sample will be left in 6 minutes?arrow_forwardSuppose the coal and steel industries form a closed economy. Every $1 produced by the coal industry requires $0.30 of coal and $0.70 of steel. Every $1 produced by steel requires $0.80 of coal and $0.20 of steel. Find the annual production (output) of coal and steel if the total annual production is $20 million.arrow_forward
- The half-life of a radioactive material is about 34.2 years. How much of the material is left after 20 years?arrow_forwardThe Douro Wine Company produces two kinds of wine — Douro Nectar and Douro Red. The wines are produced from 64 kilos of grapes the company has acquired this season. A 1,000-liter batch of Nectar requires 4 kilos of grapes, and a batch of Red requires 8 kilos. However, production is limited by the availability of only 50 cubic meters of storage space for aging. The processing time must be 120 hours. A batch of each type of wine requires 5 cubic meters of storage space. The processing time for a batch of Nectar is 15 hours, and the processing time for a batch of Red is 8 hours. Demand for Red is limited to seven batches but demand for Nectar is no less than five batches. The profit for a batch of Nectar is €9,000, and the profit for a batch of Red is €12,000. The company wants to determine the number of 1,000-liter batches of Nectar and Red to produce in order to maximize profit. Formulate a linear programming model for this problem.arrow_forwardA diesel engine uses type A filter and high-grade lubricating oil costing P55 per liter. With this filter, the oil and the filter have to be changed every 500hrs. of operation, and 5L of oil have to be added every 100hrs. This filter costs P1480 a piece. Eighty liters of oil fill the engine. Another type, filter B, costing of P1200 may be used with a lower grade of oil costing P48 per liter. However, if this filter is used, the oil and filter have to be changed every 300hrs and 10 liters are added after each 150hrs the engine is used. Hint: Consider the cost per hour.arrow_forward
- A plant is introducing time standards in one of its production departments. The department employs 96 workers. The average wage rate in the department is $13/hr, including fringe benefits. The workweek is 40 hr (2000 hr/yr). The average number of batches produced each year by a worker is 50 (1 batch/week), and the average batch size is 1196 parts. When time standards are used, the productivity increase is expected to be 18%. The application speed ratio of the work measurement techniques to be used is 150. The annual salary of each analyst is $51.5,000, including fringe benefits. Determine the annual savings in direct labor cost if the department's workload after standards are introduced is the same as before, meaning that fewer workers will be required. O 286000 $ O 520000 $ O 364000 S O442000 $arrow_forwardA candy company wants to produce 25 kilograms of a special 35% fat content chocolate to conform with customer dietary demands. To obtain this, a 50% fat content imported chocolate is combined with a 25% fat content domestic chocolate in a special melting process. How many kilograms of the 50% fat content chocolate and how many kilograms of the 25% fat content chocolate are used to make the required 25 kilograms?arrow_forwardApproaching the month of Ramadan, PT Prima Sehat predicts that there will be an increase in demand for electronic goods, both TVs and microwaves. All of these electronic products have the same processing process, but have different processing times. For TV requires 4 hours of electronic processing and 2 hours of assembly. While the microwave requires 3 hours of electronic processing time and 1 hour of assembly. Of the current capacity, there is a working time for electronics as much as 240 hours, and per work time as much as 100 hours. The profit for each product is 7 (in tens of thousands) and 5 (in tens of thousands). Please use the simplex method linear programming method to solve the above casearrow_forward
- College Algebra (MindTap Course List)AlgebraISBN:9781305652231Author:R. David Gustafson, Jeff HughesPublisher:Cengage LearningAlgebra for College StudentsAlgebraISBN:9781285195780Author:Jerome E. Kaufmann, Karen L. SchwittersPublisher:Cengage LearningLinear Algebra: A Modern IntroductionAlgebraISBN:9781285463247Author:David PoolePublisher:Cengage Learning
- Algebra & Trigonometry with Analytic GeometryAlgebraISBN:9781133382119Author:SwokowskiPublisher:Cengage