Concept explainers
The two sources of water of which highway engineer is concerned about.
Answer to Problem 1P
Two sources of water of which highway engineer is concerned about is given below,
- Surface drainage
- Subsurface drainage
Explanation of Solution
Two sources of water of which highway engineer is concerned about is given below,
- Surface drainage
- Subsurface drainage
Surface drainage:
Generally, the main source of surface water is precipitation which is occurring from the rain and snow. From this, some of the water may get absorbed into the soil and some of it may remain on the surface. This water should be removed at the time of pavement construction. This will be the concern of a highway engineer.
Subsurface drainage:
The second source, ground water, flows into streams of underground. It may become important in cuts of highway or at places, where a high-water table exists near the structure of pavement. This source of water is known as subsurface drainage.
Want to see more full solutions like this?
Chapter 16 Solutions
Traffic And Highway Engineering
- What is to be considered in water pipeline design? what are the different options?arrow_forwardQ. Explain in details about the bridge maintenance system and also about the inspection instrument used in bridge maintenance.arrow_forwardHow a paved road is different from a concrete road? Mention the advantages and disadvantages of the both.arrow_forward
- Discuss the factors influencing highway designarrow_forwardThe following cross-section notes of the road was examined to calculate volumes. The width of the roadway is 12m -12 -3 +6 -6 +24 -9 STA 5+040 -15 -4.5 +6 -8 -6 -30 -12 -6 -7 STA 5+140 a. What is the cross section at STA 5+040? STA 5+140?arrow_forwardPrepare a summary for usage of flood barrier during flood.arrow_forward
- Read the question carefully and give me right solution with clear calculations. the minimum superelevation runoff distance for a two lane roadway with a 4% full superelevation for a circular curve having a radius of 1200ft and a speed limit of 55mph is___ ftarrow_forwardPlease give me just the correct choice for each questions 4. The topographic study is conducted to estimate which of the following characteristics? A. Engineering B. Environmental C. Financial D. Traffic 5. The roads master plan may not be prepared for: A. City B. State C. Country 6. The determination of optimum length of highway is based on: A. Geometric design B. Areas that served C. Type of highway 10. Bottom most layer of pavement is known as: A. Wearing course B. Base course D. Village 7. Most suitable material for highway embankments is: A. Granular soil B. Fine soil C. Silts 8. The fundamental factor in the selection of pavement type is: A. Climatic condition B. Type and intensity of traffic C. Subgrade soil and drainage conditions D. Cost 9. Flexible pavements distribute the wheel load A. Directly to subgrade B. Through structural action C. Through a set of layers to the subgrade D. None of the above C. Subbase course D. Cost D. Clays D. Subgradearrow_forwardPrincipal criteria in designing highway. Explain each criteria.arrow_forward
- A proposed highway is to be designed with adequate shoulder and clearance ina level terrain with the following: AADT = 25,000 pcu/day D% = 65% K = 9% Estimatethe number of lanes that will provide LOS C. SHOW COMPLETE SOLUTIONarrow_forwardPavement Markings, Used to regulate and guide the traffic providing :channels to different movements Advantages 1.No physical obstruction to traffic O 2. Low cost O 3. Ease of removal when required O 4.0bliterated easily by snow & Wearing out rapidly 1+2+3 O 2+4 Oarrow_forwardDraw the cross-section for a typical long roadway tunnel. The question above is for my transportation engineering class. That's the only information that was provided for the question. Thank you so much in advance! 2arrow_forward
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning