Summary Introduction
To determine: The optimal mix of products that maximizes the profit and the range of optimality of the profit coefficient of each variable.
Introduction:
Linear programming:
Linear programming is a mathematical modeling method where a linear function is maximized or minimized taking into consideration the various constraints present in the problem. It is useful in making quantitative decisions in business planning.
Range of optimality:
It is the range of values at which the coefficient of the objective function of a decision variable will change without changing either the list of the variables in the optimal quantities or the solution.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Two vital stages in a production process are assembly I and assembly II. The unit load for the assembly I stage is 7.0 ( 50% higher for high skill) minutes, while it is 10.0 (30 % higher for high skill) minutes for assembly II. There are 7 employees working in assembly I and 8 employees working in assembly II. 65% of low skill labor and 35% of high skill labor are required at both stages. . On average 18% of the operating time is wasted, what's the theoretical unit load for Assembly II?
answer is 9.06
please explain
JCL Inc. is a major chip manufacturing firm that sells its products to computer manufacturers like Dell, Gateway, and others. In simplified terms, chip making at JCL Inc. involves three basic operations: depositing, patterning, and etching.
Depositing: Using chemical vapor deposition (CVD) technology, an insulating material is deposited on the wafer surface, forming a thin layer of solid material on the chip.
Patterning: Photolithography projects a microscopic circuit pattern on the wafer surface, which has a light-sensitive chemical like the emulsion on photographic film. It is repeated many times as each layer of the chip is built.
Etching: Etching removes selected material from the chip surface to create the device structures.
The table below lists the required processing times and setup times at each of the steps. There is unlimited space for buffer inventory between these steps. Assume that the unit of production is a wafer, from which individual chips are cut at a later…
JCL Inc. is a major chip manufacturing firm that sells its products to computer manufacturers like Dell, HP, and others. In simplified terms, chip making at JCL Inc. involves three basic operations: depositing, patterning, and etching.
Depositing: Using chemical vapor deposition (CVD) technology, an insulating material is deposited on the wafer surface, forming a thin layer of solid material on the chip.
Patterning: Photolithography projects a microscopic circuit pattern on the wafer surface, which has a light-sensitive chemical like the emulsion on photographic film. It is repeated many times as each layer of the chip is built.
Etching: Etching removes selected material from the chip surface to create the device structures.
The following table lists the required processing times and setup times at each of the steps. Assume that the unit of production is a wafer, from which individual chips are cut at a later stage.
Note: A setup can only begin once the batch has arrived at the…
Chapter 19 Solutions
OPERATIONS MANAGEMENT (LL W/ CONNECT)
Ch. 19 - For which decision environment is linear...Ch. 19 - What is meant by the term feasible solution space?...Ch. 19 - Explain the term redundant constraint.Ch. 19 - Prob. 4DRQCh. 19 - Prob. 5DRQCh. 19 - Prob. 6DRQCh. 19 - Prob. 1PCh. 19 - Prob. 2PCh. 19 - Prob. 3PCh. 19 - A small candy shop is preparing for the holiday...
Ch. 19 - A retired couple supplement their income by making...Ch. 19 - Solve each of these problems by computer and...Ch. 19 - Prob. 7PCh. 19 - For Problem 6b: a. Find the range of feasibility...Ch. 19 - Prob. 9PCh. 19 - Prob. 10PCh. 19 - Prob. 11PCh. 19 - The manager of the deli section of a grocery...Ch. 19 - Prob. 13PCh. 19 - A chocolate maker has contracted to operate a...Ch. 19 - Prob. 15PCh. 19 - Prob. 16PCh. 19 - Prob. 1.1CQCh. 19 - Prob. 1.2CQCh. 19 - Prob. 1.3CQCh. 19 - Prob. 2.1CQCh. 19 - Prob. 2.2CQCh. 19 - Prob. 2.3CQCh. 19 - Prob. 2.4CQ
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- A Company produces a component for use in the aerospace industry. The component consists of three parts (A, B and C), which are purchased externally and cost 50c, 60c and 70c per piece respectively. Parts A and B are assembled first on assembly line 1, which produces 150 components per hour. Part C undergoes a drilling operation before being finally assembled with the output from assembly line 1. There are six drilling machines in total, but only three are currently operational. Each drilling machine drills part C at a rate of 30 parts per hour. The final assembly line has a production capacity of 100 components per hour. At present, components are produced eight hours a day, five days a week. If the need arises, management can add a second shift of eight hours for the assembly lines only. The cost of assembly labour is 40c per assembly operation for each assembly line; the cost of drilling labour is 20c per part. For drilling, the cost of electricity is 10c per part. The overhead cost…arrow_forwardThere is an upstream Picking department that feeds two downstream Packing departments: Pack Singles and Pack Multis. Those Packing departments feed to a Shipping department that loads the outgoing trucks. 40% of your Pick volume goes to Pack Singles and has a packing rate of 104 units per labor hour (uph). 60% of the Pick volume goes to Pack Multis and has a pack rate of 215 units per labor hour. Your pickers pick both Single and Multi items throughout the day at an overall average rate of 114 units per labor hour. All units that are packed in both processes go through the Ship process at a rate of 570 units per hour. You have 102 people today for all 4 departments and you absolutely must pack 47,880 units in Pack Multis Items to meet a customer promise metric. How do you allocate labor to balance the flow in your department if you work a 10 hour shift? Do not assume breaks or lunches in your answer. Redirect 1: You now need to process all of the Pack Singles Volume in the first 5…arrow_forwardThe Farm-4-Less tractor company produces a grain combine (GC) in addition to both a large (LT) and small size tractor (SM). Its production manager desires to produce to customer demand using a mixed-model production line. The current sequence of production, which is repeated 30 times during a shift, is SM-GC-SM-LT-SM-GC-LT-SM. A new machine isproduced every 2 minutes. The plant operates two 8-hour shifts. There is no downtime because the 4 hours between each shift are dedicated to maintenance and restocking raw material. Based on this information, answer the following questions.a. How long does it take the production cycle to be completed?b. How many of each type of machine does Farm-4-Less produce in a shift?arrow_forward
- A manufacturing process has a i xed cost of $150,000 per month. Each unit of product being produced contains $25 worth of material and takes $45 of labor. How many units are needed to break even if each completed unit has a value of $90?arrow_forward. Aquatica makes underwater camera housings for divers. The process begins with a solid rectangular block of aluminum that is used to make a single housing. A computer numerically controlled (CNC) machine drills into the block to make the metal “frame” of the housing. Each block requires 15 minutes of drilling. The frame is then chemically treated in a series of baths. There is ample capacity in the treating stage. Finally, a worker must manually attach the various buttons and components to the metal housing. This assembly takes 120 minutes per housing per worker and Aquatica has 6 workers trained to do this task. The CNC machine requires a 30-minute setup time before the production of a batch can begin. a. If the CNC machine produces 14 housings between setups, what would be its capacity (in housings per hour)? b. Assuming the process is supply-constrained, what is the utilization (as a number between 0 and 1) of the CNC machine if it operates in batches of 14 housings? c. Assuming…arrow_forwardSawing 20 min/unit Sanding 20 min/unit Drilling 32 min/unit Welding 30 min/unit Assembly 93 min/unit Assembly 93 min/unit Assembly 93 min/unit A production process is shown in the figure above. The drilling operation occurs separately from, and simultaneously with the sawing and sanding operations. Welding starts when both drilling and sanding operations have been completed. After welding, a product needs to go through only one of the three assembly operations (the operations are in parallel, where parallel lines perform the exact same operation). Considering the process times at stations, what is the process time of the system (in min/unit)?arrow_forward
- Kinga Doll Company manufactures eight versions of its popular girl doll, Shari. The company operates on a 40-hour workweek. The eight versions differ in doll skin, hair, and eye color, enabling most children to have a doll with a similar appearance to them. It currently sells an average of 4,000 dolls (spread equally among its eight versions) per week to boutique toy retailers. In simplified terms, doll making at Kinga involves three basic operations: molding the body and hair, painting the face, and dressing the doll. Changing over between versions requires setup time at the molding and painting stations due to the different colors of plastic pellets, hair, and eye color paint required. Table 7.5 lists the setup times for a batch and the activity times for each unit at each step. process setup molding painting dressing setup time (min) 12 29.00 no setup processing time (min) .24 0.17 0.27 a. What is the process capacity in dolls per hour with a batch size of 475 dolls? b.…arrow_forwardA recurring maintenance job in a factory is being done by a three-man crew. Due to the nature of the job and space limitations, it was observed that two of the men were idle 37% of the time; one of the men was also idle an additional of the time, and at any given time only one man was required. The men were each paid P24.00 per hour. Each time the job was performed a set of tools and equipment with a value equivalent to P36.00 per hour was used. If the three-men crew could complete the work in 5 hours, which crew size would be the most economicalarrow_forwardThe sales department clerk receives a customer orders from the customers and prepares a three-part sales order. The three copies are sent to the credit department for approval, where the clerk reviews the Customer Credit Records. After approval, the credit department clerk returns one copy of the sales order to the Sales Department, where it is reviewed and filed. The remaining two copies are sent to the warehouse. The Warehouse clerk picks the goods from the shelves and sends them along with one copy of the sales order to the shipping department. The third copy of the sales order is filed in the warehouse. Upon receipt if the goods, the shipping clerk prepares a shipping notice and sends the goods and one copy of the sales order to the customer. The clerk then sends the shipping notice to the Billing Department. Upon receipt of the shipping notice the billing clerk updates the customer’s account receivable and files the shipping notice in the department. Required Prepare a system…arrow_forward
- A computer recycler sells computer enclosures to a computer remanufacturer. To meet monthly expected demand, the remanufacturer needs 2.000 enclosures. The recycler utilizes a four-step disassembly process with scrap rates given as follows: d1=0.08, d2=0.05, d3=0.05, and d4=0.03. How many computers must be recycler receive each month in order to meet the remanufacturer’s demand?arrow_forwardP1 P4 P2 P3 P5 P5 P5 P6 ... P1 has a production rate of 15 units/hour, P2 = 30 units/hour, P3 = 10 units per hour, P4 = 4 units/hour, P5 = 1 unit(s) per hour for each P5 and P6 = 6 units per hour. Operation P4 occurs seperately from and simultaneously with operations P1-P3. Operation P5 has three parallel and identical lines; therefore, each part only needs to go through one of the three lines. Consider the following two independent improvements: Improvement 1: Change station P4 into two connected stations (P4-1 and P4-2, connected in series) that have process times of 4 min/unit and 6 min/unit respectively. Improvement 2: Add two additional P5 stations to give you 5 parallel and identical lines. Improvement 2 increases capacity because it improves the bottleneck. The new bottleneck is station P4 since the original bottleneck has a process time of The new yearly capacity would be units per year. a) Which of the two improvements will provide the largest increase in capacity? What is the…arrow_forwardLead Time Gourmet Helper Appliance Company manufactures home kitchen appliances. The manufacturing process includes stamping, final assembly, testing and shipping. In the stamping operation, a number of individuals are responsible for stamping the steel outer surface of the appliance. The stamping operation is set up prior to each run. A run of 75 stamping is completed after each setup. A setup requires 40 minutes the parts wait for the setup to be completed before stamping begins. Each stamping requires 5 minutes of operating time. After each batch is completed, the operator moves stamp the stamped covers to the final assembly area. This move takes 10 minutes to complete. The final assembly for each appliance unit requires 18 minutes and is also done in batches of 75 appliance units. The batch of 75 appliance units is moved into the test building, which is crossed street. The move takes 25 minutes. In the final test, the 75 unit batch is tested one at a time. Each test…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,