An event when denotes a particular task or activity is frequently shown as a round circle and called ?
Quasi-Tech Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications). Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. Costs have been assigned to each activity using direct tracing and resource drivers as follows:
Activity
Expected Cost
Activity Driver
Activity Capacity
Engineering
$1,000,000
Engineering hours
5,000 hours
Setups
900,000
Setups
200 setups
Machining
2,000,000
Machine hours
25,000 machine hours
Inspection
800,000
Inspection hours
2,500 inspection hours
Quasi-Tech produces two models: Model C and Model D. The following table…
Consider the case of Conrad's Cookie Company, where he and two of his friends (Jared and Jack) are working to make and sell cookies. They have just one oven and can bake up to two dozen cookies at a time. The oven can bake two dozen cookies simultaneously (of similar or different ingredients) or one dozen only. If one dozen is baking in the oven, baking time will not be any different from baking two dozen simultaneously. The sequence of baking steps and respective durations are below.
Mixing and Spooning (together)
3 mins/dozen
Loading
1 minutte/dozen.
Baking
8 mins. baking time for one or two dozens.
Cooling
6 minutes
Packing
5 mins/dozen cookies
Payment (to be done after packing only)
1 minute per order
If all orders are 4 dozen cookies,
a) What is the best way to assign Conrad and his friends to jobs in order to maximize capacity? Find highest theoretical capacity and bottleneck of the process.
b) Once system warms up, is the capacity the same…
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, subject and related others by exploring similar questions and additional content below.Similar questions
- Consider the case of Conrad's Cookie Company, where he and two of his friends (Jared and Jack) are working to make and sell cookies. They have just one oven and can bake up to two dozen cookies at a time. The oven can bake two dozen cookies simultaneously (of similar or different ingredients) or one dozen only. If one dozen is baking in the oven, baking time will not be any different from baking two dozen simultaneously. The sequence of baking steps and respective durations are below. Mixing and Spooning (together) 3 minutes of labor time per dozen Loading 1 minutes per dozen. Baking 8 minutes of baking time for one or two. Cooling 6 minutes; Packing 5 minutes of labor time per dozen cookies Payment (to be done after packing only) 1 minutes of labor time per order If all orders are 4 dozen cookies, a) What is the best way to assign Conrad and his friends to jobs in order to maximize capacity? Find highest theoretical capacity and bottleneck…arrow_forwardRuth is reviewing her organization’s business continuity and disaster recovery plans. In it, she comes across the following statement: “In the event that the payroll system fails, the IT team must restore access within 48 hours to avoid unacceptable levels of damage to the business.” What type of statement is this?arrow_forwardThe sales department clerk receives a customer orders from the customers and prepares a three-part sales order. The three copies are sent to the credit department for approval, where the clerk reviews the Customer Credit Records. After approval, the credit department clerk returns one copy of the sales order to the Sales Department, where it is reviewed and filed. The remaining two copies are sent to the warehouse. The Warehouse clerk picks the goods from the shelves and sends them along with one copy of the sales order to the shipping department. The third copy of the sales order is filed in the warehouse. Upon receipt if the goods, the shipping clerk prepares a shipping notice and sends the goods and one copy of the sales order to the customer. The clerk then sends the shipping notice to the Billing Department. Upon receipt of the shipping notice the billing clerk updates the customer’s account receivable and files the shipping notice in the department. Required Prepare a system…arrow_forward
- The term "plenty of processes" doesn't really explain what it means, does it? Is it feasible to say the same thing with less words yet still have the same meaning?arrow_forwardA company that operated 10 hours a day manufactures two products on three sequential processes. The following table summarizes the data for the problem: Which of the following is the most appropriate representation for variables x and y for the given situation? a.) x is the # of units of Product 1 to be procured; y is the # of units of Product 2 to be procured. b.) x is the # of units of Product 1 to be produced; y is the # of units of Product 2 to be produced. c.) x is the # of units of Product 1 to be stored; y is the # of units of Product 2 to be stored d.) x is the # of units of Product 1 to be delivered; y is the # of units of Product 2 to be delivered.arrow_forwardThis is a step in a process that is the slowest compared tothe other steps. This step limits the capacity of the process.arrow_forward
- Keuka Studies does custom metal sculptures of horses and other animals. A horse sculpture is composed of numerous parts. They use a lathe to construct two types of parts. The "Body" part is used to support the torso of the horse and the "Leg" part is used to support the legs. Each horse sculpture needs 1 Body part and 4 Leg parts. Switching between either of the types of parts requires 25 minutes. Once ready to produce, the lathe produces a Body part in 4 minutes and a single Leg part in 2 minutes. The lathe only makes horse parts. For parts (a)–(d) assume Keuka operates a cyclic schedule in which they make 100 Body parts and then 400 Leg parts. Assume that the Lathe resource is the bottleneck. Further, suppose that there is sufficient demand. What is the utilization (%) of the Lathe? answer:________%arrow_forwardKeuka Studies does custom metal sculptures of horses and other animals. A horse sculpture is composed of numerous parts. They use a lathe to construct two types of parts. The "Body" part is used to support the torso of the horse and the "Leg" part is used to support the legs. Each horse sculpture needs 1 Body part and 4 Leg parts. Switching between either of the types of parts requires 25 minutes. Once ready to produce, the lathe produces a Body part in 4 minutes and a single Leg part in 2 minutes. The lathe only makes horse parts. For parts (a)–(d) assume Keuka operates a cyclic schedule in which they make 100 Body parts and then 400 Leg parts. Suppose Keuka is capacity-constrained. Also, suppose that the process now has an Assembly resource which has 1 worker who is able to assemble a horse sculpture in 16 minutes. This is in addition to the Lathe resource. What is the average inventory of Body parts?arrow_forwardKeuka Studies does custom metal sculptures of horses and other animals. A horse sculpture is composed of numerous parts. They use a lathe to construct two types of parts. The "Body" part is used to support the torso of the horse and the "Leg" part is used to support the legs. Each horse sculpture needs 1 Body part and 4 Leg parts. Switching between either of the types of parts requires 25 minutes. Once ready to produce, the lathe produces a Body part in 4 minutes and a single Leg part in 2 minutes. The lathe only makes horse parts. For parts (a)–(d) assume Keuka operates a cyclic schedule in which they make 100 Body parts and then 400 Leg parts. Suppose Keuka is capacity-constrained. Also, suppose that the process now has an Assembly resource which has 1 worker who is able to assemble a horse sculpture in 16 minutes. This is in addition to the Lathe resource. If Keuka designs a cyclic schedule for the lathe, how many Legs should they make each batch so as to minimize inventory while…arrow_forward
- Keuka Studies does custom metal sculptures of horses and other animals. A horse sculpture is composed of numerous parts. They use a lathe to construct two types of parts. The "Body" part is used to support the torso of the horse and the "Leg" part is used to support the legs. Each horse sculpture needs 1 Body part and 4 Leg parts. Switching between either of the types of parts requires 25 minutes. Once ready to produce, the lathe produces a Body part in 4 minutes and a single Leg part in 2 minutes. The lathe only makes horse parts. For parts (a)–(d) assume Keuka operates a cyclic schedule in which they make 100 Body parts and then 400 Leg parts. Assume that the Lathe resources is the bottleneck. What is the maximum number of horse sculptures Keuka can make per hour? In other words, what is the capacity of the Lathe resource and the process?arrow_forwardConsider the following four-step assembly operation with quality problems: The first resource has a processing time of 5 minutes per unit and one employee doing the operation. The second resource has a processing time of 4 minutes per unit. It also has one employee doing the operation. However, this is a very delicate task and 80% of all products have to be scrapped after this step. Two workers are staffed for the third resource. No quality problems occur at this resource and the processing time is 20 minutes per unit. At the fourth and final resource, one operator handles the product. No quality problems exist at this step and the processing time is 12 minutes per unit. For every unit of demand, how many units have to flow through the second step in the process?arrow_forwardConsider the following four-step assembly operation with quality problems: The first resource has a processing time of 5 minutes per unit and one employee doing the operation. The second resource has a processing time of 4 minutes per unit. It also has one employee doing the operation. However, this is a very delicate task and 80% of all products have to be scrapped after this step. Two workers are staffed for the third resource. No quality problems occur at this resource and the processing time is 20 minutes per unit. At the fourth and final resource, one operator handles the product. No quality problems exist at this step and the processing time is 12 minutes per unit. Where in the process is the bottleneck?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- BUSN 11 Introduction to Business Student EditionBusinessISBN:9781337407137Author:KellyPublisher:Cengage LearningEssentials of Business Communication (MindTap Cou...BusinessISBN:9781337386494Author:Mary Ellen Guffey, Dana LoewyPublisher:Cengage LearningAccounting Information Systems (14th Edition)BusinessISBN:9780134474021Author:Marshall B. Romney, Paul J. SteinbartPublisher:PEARSON
- International Business: Competing in the Global M...BusinessISBN:9781259929441Author:Charles W. L. Hill Dr, G. Tomas M. HultPublisher:McGraw-Hill Education
BUSN 11 Introduction to Business Student Edition
Business
ISBN:9781337407137
Author:Kelly
Publisher:Cengage Learning
Essentials of Business Communication (MindTap Cou...
Business
ISBN:9781337386494
Author:Mary Ellen Guffey, Dana Loewy
Publisher:Cengage Learning
Accounting Information Systems (14th Edition)
Business
ISBN:9780134474021
Author:Marshall B. Romney, Paul J. Steinbart
Publisher:PEARSON
International Business: Competing in the Global M...
Business
ISBN:9781259929441
Author:Charles W. L. Hill Dr, G. Tomas M. Hult
Publisher:McGraw-Hill Education
Process selection and facility layout; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=wjxS79880MM;License: Standard YouTube License, CC-BY