Solid Waste Engineering: A Global Perspective, Si Edition
3rd Edition
ISBN: 9781305638600
Author: William A. Worrell, P. Aarne Vesilind, Christian Ludwig
Publisher: Cengage Learning
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 3, Problem 3.5P
To determine
One-way haul time
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Determine the breakeven travel time to the nearest 0.1 hours for the following conditions:
Vehicle 1: Direct Haul Operating Cost = $69/hour; Vehicle Capacity = 6.47 tons
Vehicle 2: Transfer Station Cost = $6.3/ton; Trailer Operating cost = $240/hour; Trailer Capacity = 30 tons
There are five machines located at the points (0, 0), (2, 0), (0, 2), (2, 3) and (4,3) respectively. A repair shop is planned in the facility. The foreman claims that for any number of expected repair trips between these machines and the repair shop, the optimal location of the new facility can never be at the location (2,1).
State whether this claim is true or false.
A major weaving segment on an urban freeway as shown in Figure below. What are the level
of service and capacity of the weaving segment? If volume (A-C) is 1,000 vph, volume (A-D)
is 500 vph, volume (B-C) is 900 vph, and volume (B-D) is 1,200 vph, 13% trucks, PHF = 0.95,
rolling terrain, drivers are regular commuters, FFS = 120 km/h for freeway, and weaving
%3D
segment is 450 m.
L=450 m
1,000
500
900
1,200
Chapter 3 Solutions
Solid Waste Engineering: A Global Perspective, Si Edition
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- A road with 4.5% downward grade has available stopping sight distance of 200m. Find the road speed if coefficient of longitudinal friction 0.29 and driver reaction time was 2.5sec. A BI % $3 *** US X₂ x² E 흐트 E E # #6 C I ↑ 2 сх OCarrow_forwardA MOX V, YK/s a" zain 1Q TH 25% of hourly volume 1 Add file Q3: The following table show the results of current traffic counts for a rural highway at each 15 min. intervals during two hrs. Calculate:1. Peak hour volume 2. Peak hour factor 3. Current and future design hour volume If the design life is 35 years and construction time 5 years 7:00- 7:15- 7:30- 7:45- 8:00- 8:15-8:30- 8:45- 7:15 7:30 7:45 8:00 8:15 8:30 8:45 9:00 Time Volume 100 200 700 800 600 300 100 50 (veh.) 1 Add file Page 2 of 5 Вack Next Never submit passwords through Google Forms. This form was created inside of University of Diyala, Report Abuse Google Formsarrow_forwardProblem. At the train station. The operations manager have scheduled an outbound trips required to go to its place of destination. The vehicle can accommodate 90 passengers per vehicle. And there are three vehicles per train. Fifteen train sets its trip per hour. (Analyze the problem using a Block Diagram to solve the problem. This will serve as your visual aide in analyzing the train problem.) Required: 1. Determine the number of passengers who boarded the train in an hour. (How many commuters boarded the train in an hour?) 2. How many trips were made within an Hour? 3. Determine the train interval. This will serve as its scheduled trips in an Hour. 4. If the scheduled trips / operational hour will start from 6 am, and the last scheduled trip is 10 pm. How many commuters were transported presuming the train is 100 percent fully occupied.arrow_forward
- Construct one problem regarding traffic flow, speed and density. Make sure the problem is original and show complete solutions. Include graphs or diagrams if necessary • Given • Solution • Answer I will make sure to give an upvote if you follow my instructions. Kindly skip this if you already did this or you can make another one! Thanksarrow_forwardCalculate the weaving ratio for the legs 1 and 2 out of the four legs rotary intersection mentioned as 1, 2, 3 and 4. The traffic volume (v) in PCU/hr is shown in the table below V12 150 310 1500 20 480 200 540 V2 1070 400 1090 230 580arrow_forwardGiven the following Mass-Haul Diagram: Mass Diagram 5000 4000 3,500 3000 2,100 6.0 2,100 7.0 2000 8.0 1,500 1,500 g t--------- 6.0 8.0 O 1000 1,100 - 7.1 750 5.0 TO -1000 3-2000 -3000 -3,000 ´ -4000 -5000 5 10 15 20 25 Stations Limit of free haul = 600 ft Price of excavation = $3.50 Price of borrow = $3.75 Overhaul = $1.50 What is the total excavation cost to the nearest dollar? $30,000 O $28,000 $25,375 $20,250 O None of the above Net Cumulative Yardagearrow_forward
- Given the data below: Daily Traffic Count Axle Load (Kips) 1000 (single axle cars) 300 (single axle buses) 120 (tandem axle trucks) 100 (tandem axle trucks) 50 (triple axle trucks) 22 40 50 50 SN is 5, P = 4.2, P; = 3, design life is 20 years, growth rate is 5%, lane distribution factor = 0.45 EASL Calculate the !arrow_forward1) Suppose you are transport manager and asked to evaluate intermodal versus unimodal transportation for Istanbul-Izmir road using truck or truck+rail. If loading cost is 35 TL, unloading cost is 60 TL, Cost for truck (Ct) is 1100 TL, cost for rail (Cr) is 800 TL, total distance is 560 Km, and the carried amount is 1 container. If there is pre-transportation with 10 Km and 50 TL cost, find the optimal distance for rail to select intermodal transportation. Select one: a. 557 b. 503 c. 417 d. 529 2) Transport focus is with .............. Select one: a. none of them b. location and transport strategy c. location and inventory stragegy d. inventory and location strategyarrow_forwardA bulldozer operates on a 30 m stretch and moves at 2.4 kmph when pushing the earth, and returns empty at 6 kmph. The time lost in loading and shifting gears per trip is 18 seconds. Its operating factor is nearly 50 min/hour. What is the number of trips made per hour?arrow_forward
- Question. 2Propagation speed of 45 km/hr and that each toll booth takes 6 seconds to service a car.Suppose the caravan of 10 cars begins immediately in front of the first toll booth, travels 20 km to a second toll booth, then another 40 km to a third toll booth, and finally stops immediately after the third tool booth. Thus, they travel a total of 60 km. What is the total end to-end delay?arrow_forwardDuring a 40-hour workweek, a technician spends 15% of the time driving toand from various jobs. How many hours are spent driving?arrow_forwardto no congestion on the road further downstream of the railway grade crossing. QUESTION 5: Consider trip distribution within 5 zones in an area. The total trip production from zone 1 is 1000. The travel times from zone 1 to zones 2, 3, 4 and 5 are 5, 10, 20, and 30 minutes, respectively. The trip attraction to zones 2, 3, 4 and 5 are 50, 200, 75, and 450, respectively. Assume that the number of trips produced from zone 1 to zones 2, 3, 4 and 5 is inversely proportional to the inter-zonal travel time. (a) Estimate the number of trips from zone 1 to zones 2, 3, 4 and 5 using the gravity model. (b) Assume that the future trip production from zone I will increase to 1,250 and the future trip attraction to zones 2, 3, 4 and 5 will increase to 100, 225, 100, and 600, respectively. Predict the number of trips from zone 1 to zones 2, 3, 4 and 5. The inter-zonal travel times remain the same. (c) Compare the number of trips from zone 1 to each destination zone between (a) and (b). Identify the…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Solid Waste EngineeringCivil EngineeringISBN:9781305635203Author:Worrell, William A.Publisher:Cengage Learning,Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning