Chapter 3, Problem 3.7P
To determine
Estimated time to collect recyclables
Expert Solution & Answer
![Check Mark](/static/check-mark.png)
Want to see the full answer?
Check out a sample textbook solution![Blurred answer](/static/blurred-answer.jpg)
Students have asked these similar questions
Street is 1000 foot long and homes are 50 feet apart on both sides of the road. Two person crew are employed to collect the recyclables in green roll out containers. It takes 30 seconds to empty the contents to each green container into the truck and set out amount of 12 kgs . Estimate the total time to collect recyclables.
Calculate the number of stops in each trip of 1.50 h of refuse collection for the following data
v= velocity = 15 km/h – 4.17 m/s
d= distance= 750 m
n = number of containers to empty per stop=1
tc= time to empty one bin/container= 650 s
3-19. The mayor of Recycleville has asked
you to develop an integrated waste
management program. Residents
currently pay $10 per month and can
put out up to five 32-gallon cans
per week. You offer the mayor an
automated system with two price
options:
Container Size
(gallons)
Option 1
Option 2
$9.00
$12.00
$18.00
$15.00
$27.00
$18.00
32
64
96
In addition, you will provide the
residents a 64-gallon commingled
recycling container and a 96-gallon
green-waste container.
b.
a. What are the advantages of using
the program you developed?
Are residents opting for the
96-gallon container paying more
for this service? (Hint: Think of
the cost per gallon of material.)
c. Which price option would likely
have the higher recycling rate, and
why? Look at the EPA web site for
some case studies to support your
reasoning.
d. What impact would collecting recy-
clables one week and collecting
green waste the next week have on
the recycling rate?
Chapter 3 Solutions
Solid Waste Engineering: A Global Perspective, Si Edition
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- 3-19. The mayor of Recycleville has asked you to develop an integrated waste management program. Residents currently pay $10 per month and can put out up to five 32-gallon cans per week. You offer the mayor an automated system with two price options: Container Size (gallons) Option 1 Option 2 $9.00 $12.00 $18.00 $15.00 $27.00 $18.00 32 64 96 In addition, you will provide the residents a 64-gallon commingled recycling container and a 96-gallon green-waste container. d. What impact would collecting recy- clables one week and collecting green waste the next week have on the recycling rate?arrow_forwardO Solid waste from a park is to be collected in large containers. It is estimated that the average time to drive from the garbage to the first container t, and from the last container t₂ to the garbage each day will be 15 and 20 minutes, respectively. If the average time required to drive between the containers is 360 seconds and the two-way distance to the disposal site is 50 km (speed limit 88 km/hr), determine the number of containers that can be emptied per day, based on an 8-hour work day. Note: at 88 km/hr speed, a = 0.016, b=0.011; S = 0.133, W=0.15; Pc+U= 0.4 h/trip.arrow_forward(84 Solid waste from a park is to be collected in large containers. It is estimated that the average time to drive from the garbage to the first container t, and from the last container t₂ to the garbage each day will be 15 and 20 minutes, respectively. If the average time required to drive between the containers is 360 seconds and the two-way distance to the disposal site is 50 km (speed limit 88 km/hr), determine the number of containers that can be emptied per day, based on an 8-hour work day. Note: at 88 km/hr speed, a = 0.016, b= 0.011; S = 0.133, W = 0.15; Pc+U= 0.4 h/trip.arrow_forward
- 2. The maximum amount of solid waste collected per day for one week is presented below. All the solid waste are to be burned at a municipal waste to energy combustion facility at a constant rate of 100 tons/day. What is the required capacity of the storage pit that should be designed to accommodate twice the required daily capacity Day Solid waste collected (tons/day) Monday 150 Tuesday 130 Wednesday 120 Thursday 120 Friday 100 Saturday 80 Sunday 0arrow_forwardAssume it cost an average of $0.03/ton.min to haul waste from collection to transfer station and then from the transfer station to landfill using a transfer vehicle and the operation cost of the transfer station is $2/ton. The cost of hauling waste directly from the collection point to landfill is $0.1/ton.min. The speed limit of any type of vehicle carrying waste between the collection point, the transfer station, and the landfill is 40 miles/hr. At/above what distance (miles) is using a transfer station more economical? Round your answer to the nearest whole number. Show your work.arrow_forward2) Calculate the number of collection vehicles a community would need if it has a total of 4000 services (customers) that are to be collected once per week. 3) Calculate the number of collection vehicles a community would need if it has a total of 6000 services (customers) that are to be collected once per week. 4) The number of collection vehicles a community would need for solid waste collection inarrow_forward
- The diameter of a 3 meter pipe decreases from 450 mm to 150 mm.Discharge is 150 liters per second.The pipeline was suspected to have had water stolen through an illegal connection. before said suspected illegal connection, a mercury difference of 350 mm was observed while a mercury difference of 200 mm was observed afterwards. estimate the stolen volume of water per dayarrow_forward1-9. Automobile repair shops typically recom- mend that their customers change their oil and oil filter every 4,000 miles. Your automobile user's manual suggests changing your oil every 8,000–10,000 miles. If drive you your car 16,000 miles each year and an oil and filter change costs $35, how much money would you save each year if you had this service performed every 8,000 miles? (1.3)arrow_forwardDiscuss at least 4 consequences of the inappropriate disposal of refuse. List five factors that must be considered in the collection of Municipal Solid Waste.arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Solid Waste EngineeringCivil EngineeringISBN:9781305635203Author:Worrell, William A.Publisher:Cengage Learning,Engineering Fundamentals: An Introduction to Engi...Civil EngineeringISBN:9781305084766Author:Saeed MoaveniPublisher:Cengage Learning
![Text book image](https://www.bartleby.com/isbn_cover_images/9781305635203/9781305635203_smallCoverImage.gif)
Solid Waste Engineering
Civil Engineering
ISBN:9781305635203
Author:Worrell, William A.
Publisher:Cengage Learning,
![Text book image](https://www.bartleby.com/isbn_cover_images/9781305084766/9781305084766_smallCoverImage.gif)
Engineering Fundamentals: An Introduction to Engi...
Civil Engineering
ISBN:9781305084766
Author:Saeed Moaveni
Publisher:Cengage Learning