Concept introduction:
Activity Based Costing (ABC):
ABC costing method is generally used to allocate the overhead costs to the product using activity rates differently for each activity. Unlike traditional method, the ABC costing method does not use the plant wide overhead rate, rather it used different allocation rate for different production activity.
Predetermined Overhead allocation rate:
The Predetermined Overhead allocation rate is used to allocate the manufacturing overhead over the jobs. Predetermined Overhead allocation rate is calculated by dividing the Total Estimated overhead cost by the Total Estimated allocation base.
The formula to calculate the Predetermined Overhead allocation rate is as follows:
To indicate:
The reason for difference in product costs under traditional and ABC method
Want to see the full answer?
Check out a sample textbook solutionChapter 4 Solutions
Managerial Accounting - With Access
- Trail Outfitters has this information for its manufacturing: Its income statement under absorption costing is as follows: Prepare an income statement with variable costing and a reconciliation statement between both methods.arrow_forwardLean manufacturing uses value streams to produce a family of products that require the same manufacturing sequence. Value-stream costing is an approach often used to determine the unit product costs in a lean manufacturing environment. Which of the following best describes how unit costs are calculated using value-stream costing? a. Value stream costs divided by units shipped b. Value stream costs divided by units produced c. (Total prime costs + overhead costs assigned to the value stream using a plantwide rate) divided by units produced d. Activity-based costing assignments within the value streamarrow_forwardElectan Company produces two types of printers. The company uses ABC, and all activity drivers are duration drivers. Electan Company is considering using DBC and has gathered the following data to help with its decision. A. Activities with duration drivers: B. Activities with consumption ratios and costs: C. Products with cycle time and practical capacity: Required: 1. Using cycle time and practical capacity for each product, calculate the total time for all primary activities. Comment on the relationship to ABC. 2. Calculate the overhead rate that DBC uses to assign costs. Comment on the relationship to a unit-based plantwide overhead rate. 3. Use the overhead rate calculated in Requirement 2 to calculate (a) the overhead cost per unit for each product, and (b) the total overhead assigned to each product. How does this compare to the ABC assignments shown in Part B of the Information set? 4. What if the units actually produced were 10,000 for Printer A and 18,000 for Printer B. Using DBC, calculate the cost of unused capacity.arrow_forward
- Activity-based costing is preferable in a system: when multiple products have similar product volumes and costs with a large direct labor cost as a percentage of the total product cost with multiple, diverse products where management needs to support an increase in sales pricearrow_forwardPotterii sells its products to large box stores and recently added a retail line of products to sell directly to consumers. These estimates are to be used in determining the overhead allocation rate for ABC: What would be the predetermined rate for each cost pool?arrow_forwardExplain how a plantwide overhead rate, using a unit-based driver, can produce distorted product costs. In your answer, identify two major factors that impair the ability of plantwide rates to assign cost accurately.arrow_forward
- Which is not a step In activity-based costing? A. identify the activities performed by the organization B. identify the cost driver(s) associated with each activity C. compute a cost rate per production D. assign costs to products by multiplying the cost driver rate by the volume of the cost driver units consumed by the productarrow_forwardActivity-based costing systems: A. use a single predetermined overhead rate based on machine hours instead of on direct labor B. frequently increase the overhead allocation to at least one product while decreasing the overhead allocation to at least one other product C. limit the number of cost pools D. always result in an increase of at least one products selling pricearrow_forwardInterview questions are asked to determine a. what activities are being performed. b. who performs the activities. c. the relative amount of time spent on each activity by individual workers. d. possible activity drivers for assigning costs to products. e. All of these.arrow_forward
- Carltons Kitchens three cost pools and overhead estimates are as follows: Compare the overhead allocation using: A. The traditional allocation method B. The activity-based costing method (Hint: the traditional method uses machine hours as the allocation base.)arrow_forwardAbernathy, Inc., produces two different generators and is concerned about their quality. The company has identified the following quality activities and costs associated with the two products: Required: 1. Calculate the quality cost per unit for each product, and break this unit cost into quality cost categories. Which of the two seems to have the lowest quality? 2. How might a manager use the unit quality cost information?arrow_forwardWhich is not a task typically associated with ABC systems? A. calculating the overhead application rate for each cost pool B. applying a single cost rate C. identifying a cost driver D. more correctly allocating overhead costsarrow_forward
- Cornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage LearningPrinciples of Accounting Volume 2AccountingISBN:9781947172609Author:OpenStaxPublisher:OpenStax CollegeManagerial AccountingAccountingISBN:9781337912020Author:Carl Warren, Ph.d. Cma William B. TaylerPublisher:South-Western College Pub
- Financial And Managerial AccountingAccountingISBN:9781337902663Author:WARREN, Carl S.Publisher:Cengage Learning,Managerial Accounting: The Cornerstone of Busines...AccountingISBN:9781337115773Author:Maryanne M. Mowen, Don R. Hansen, Dan L. HeitgerPublisher:Cengage Learning