Question
Chapter 4, Problem 4.29AE
1.
To determine
To prepare: cost of quality report with the calculation of total cost of each category and their percentage.
2.
To determine
To identify: the reason for higher variable cost in case of repair at customers’ home than in-
3.
To determine
To identify: the use of COQ report for the improvement of the production process.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Learning CurveBordner Company manufactures HVAC (heating, ventilation, and air conditioning) systems for commercial buildings. For each new design, Bordner faces a 90 percent learning rate. On aver-age, the first unit of a new design takes 600 hours. Direct labor is paid $25 per hour.
Required:1. Set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, and cumulative total time in hours. Show results by row for total pro-duction of one unit, two units, four units, eight units, and sixteen units. (Round hour answers to two significant digits.)
2. What is the total labor cost if Bordner makes the following number of units: one, four, sixteen? What is the average cost per system for the following number of systems: one, four, or sixteen? (Round your answers to the nearest dollar.)
3. Using the logarithmic function, set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours,…
E19-15 Computing and using single plantwide overhead allocation rate
Learning Objective 1
Basic $322,000
Koehler makes handheld calculators in two models: basic and professional.
Koehler estimated $721,000 of manufacturing overhead and 515,000 machine
hours for the year. The basic model actually consumed 230,000 machine hours,
and the professional model consumed 285,000 machine hours.
Compute the predetermined overhead allocation rate using machine hours
(MHr) as the allocation base. How much overhead is allocated to the basic
model? To the professional model?
Relevant Costs for Short-Ten
ating income data for the year just ended:
Members of the board of directors of Security Alliance have received the following oper-
P8-50A Prepare and use contribution margin statements for discontinuing a
ine decision (Learning Objective 4)
a
Security Alliance
Product Line Contribution Margin Income Statement
For the Year
Product lines
Industrial
Household
Systems
5.
6 Sales revenue
7 Less cost of goods sold:
Variable
Systems
380,000 $
Company Total
690,000
2$
310,000
8
46,000
32,000
280,000
(2,000) $
78,000
346,000
266,000
Fixed
9.
10 Gross profit
11 Less marketing and administrative expenses:
Variable
66,000
268,000
13
14 Operating income (loss)
15
12
Fixed
63,000
37,000
(102,000) $
69,000
23,000
176,000 $
132,000
60,000
74,000
Members of the board are surprised that the industrial systems product line is losing
money. They commission a study to determine whether the company should discontinue
the line. Company accountants estimate that discontinuing the…
Chapter 4 Solutions
MyLab Accounting with Pearson eText -- Access Card -- for Managerial Accounting (My Accounting Lab)
Ch. 4 - (Learning Objective 1) Cost distortion is more...Ch. 4 - (Learning Objective 2) The first step in computing...Ch. 4 - (Learning Objective 2) Activities incurred...Ch. 4 - (Learning Objective 3) Which of the following is...Ch. 4 - (Learning Objective 3) The potential benefits of...Ch. 4 - (Learning Objective 4) Lean operations are...Ch. 4 - Prob. 7QCCh. 4 - (Learning Objective 4) Concerning lean operations,...Ch. 4 - (Learning Objective 5) Which of the following is...Ch. 4 - (Learning Objective 5) Which of the following...
Ch. 4 - Understanding key terms (Learning Objectives 1, 2,...Ch. 4 - Use departmental overhead rates to allocate...Ch. 4 - Compute departmental overhead rates (Learning...Ch. 4 - Prob. 4.4SECh. 4 - Prob. 4.5SECh. 4 - Calculate a job cost using ABC (Learning Objective...Ch. 4 - Classifying costs within the cost hierarchy...Ch. 4 - Classifying costs within the cost hierarchy...Ch. 4 - Determine the usefulness of refined costing...Ch. 4 - Prob. 4.10SECh. 4 - Identifying costs as value-added or...Ch. 4 - Identify lean production characteristics (Learning...Ch. 4 - Identify the DOWNTIME activities at a manufacturer...Ch. 4 - Prob. 4.14SECh. 4 - Classifying costs of quality (Learning Objective...Ch. 4 - Quality initiative decision (Learning Objective 5)...Ch. 4 - Assess the impact of a quality initiative...Ch. 4 - Identify ethical standards violated (Learning...Ch. 4 - Compare traditional and departmental cost...Ch. 4 - Compute activity rates and apply to jobs (Learning...Ch. 4 - Apply activity cost allocation rates (Learning...Ch. 4 - Using ABC to bill clients at a service firm...Ch. 4 - Compare traditional and ABC allocations at a...Ch. 4 - Compare traditional and ABC allocations on a job...Ch. 4 - Use ABC to allocate manufacturing overhead...Ch. 4 - Continuation of E4-25A: Determine product...Ch. 4 - Prob. 4.27AECh. 4 - Classify costs and make a quality-initiative...Ch. 4 - Prob. 4.29AECh. 4 - Compare traditional and departmental cost...Ch. 4 - Prob. 4.31BECh. 4 - Prob. 4.32BECh. 4 - Prob. 4.33BECh. 4 - Compare traditional and ABC cost allocations at a...Ch. 4 - Prob. 4.35BECh. 4 - Prob. 4.36BECh. 4 - Prob. 4.37BECh. 4 - Prob. 4.38BECh. 4 - Classify costs and make a quality-initiative...Ch. 4 - Prob. 4.40BECh. 4 - Prob. 4.41APCh. 4 - Use ABC to compute full product costs (Learning...Ch. 4 - Prob. 4.43APCh. 4 - Prob. 4.44APCh. 4 - Prob. 4.45APCh. 4 - Prob. 4.46BPCh. 4 - Prob. 4.47BPCh. 4 - Comprehensive ABC implementation (Learning...Ch. 4 - Using ABC in conjunction with quality decisions...Ch. 4 - Comprehensive ABC (Learning Objectives 2 3)...Ch. 4 - Prob. 4.51SCCh. 4 - Discussion Questions 1. Explain why departmental...Ch. 4 - ABC in Real Companies Choose a company in any of...Ch. 4 - Value-Added versus Non-Value-Added at a Restaurant...Ch. 4 - Ethics involved with ABC and hazardous waste costs...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.Similar questions
- Bordner Company manufactures HVAC (heating, ventilation, and air conditioning) systems for commercial buildings. For each new design, Bordner faces a 90 percent learning rate. On average, the first unit of a new design takes 600 hours. Direct labor is paid 25 per hour. Required: 1. Set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, and cumulative total time in hours. Show results by row for total production of one unit, two units, four units, eight units, and sixteen units. (Round hour answers to two significant digits.) 2. What is the total labor cost if Bordner makes the following number of units: one, four, sixteen? What is the average cost per system for the following number of systems: one, four, or sixteen? (Round your answers to the nearest dollar.) 3. Using the logarithmic function, set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, cumulative total time in hours, and the time for the last unit. Show results by row for each of units one through eight. (Round answers to two significant digits.)arrow_forwardeleam.squ.euu.om/mod/qu12/attempt.p learning System (Academic) stion 3 Company XYZ uses machine hours to allocate its manufacturing overhead. The company estimates that total machine hours to be operated next year are 190,000 hours. The estimated variable overhead is $9 per hour and the estimated fixed overhead costs are $152,000. Calculate wer saved ked out of 2 the predetermined overhead rate. lag question Select one: O a. $9.80 O b. $0.80 O c. $10.80 O d. $0.10 O e. None of the answers given Clear my choicearrow_forward$4-3 Compute departmental overhead rates (Learning Objective 1) Snyder Snacks makes potato chips, corn chips, and cheese puffs using three different pro- du es wi the same manufacturing plant. Currently, Snyder uses a single plant- wide overhead rate to allocate its $3,311,500 of annual manufacturing overhead. Of this amount, $2,070,000 is associated with the potato chip line, $763,000 is associated with the corn chip line, and $478,500 is associated with the cheese puff line. Snyder's plant is currently running a total of 17,900 machine hours: 11,500 in the potato chip line, 3,500 in the corn chip line, and 2,900 in the cheese puff line. Snyder considers machine hours to be the cost driver of manufacturing overhead costs. 1. What is Snyder's plantwide overhead rate? 2. Calculate the departmental overhead rates for Snyder's three production lines. Round all answers to the nearest cent. 3. Which products have been overcosted by the plantwide rate? Which products have been undercosted by…arrow_forward
- to complete the first setup on a new machine took an employee 250 minutes. using 72% cumulative average - time learning curve indicated that the second setup on the new machine is expected to take. answer choices: a.) 110 minutes b.) 90 minutes c.) 180 minutes d.) 215 minutesarrow_forwardName: Program-Year-Section: Exercise I-Set A To Date: Professor: Score: 3A Corporation makes different types of hubcaps for cars. The company accumulates volumes of metal edges as scrap. At least once a month, the scrap metal is sold to a local manufacturer for further processing. This month's scrap sales on account total P15,000.00. The company is using normal cost system. Required: Prepare the appropriate journal entry to record the sale of the scrap for each of the following alternatives: Tok 1. Scrap sale is viewed as additional revenue 2. Scrap sale is viewed as reduction of cost of goods sold 3. When scrap materials are traceable as indirect materials 4. When scrap materials are traceable as direct materialsarrow_forwardAssume that at the beginning of 20x2, Cicleta trained the 2 assembly workers in a new approach that had the objective of increasing the efficiency of the assembly process. Cicleta also began moving toward a JIT purchasing and manufacturing system. When JIT is fully implemented, the demand for expediting is expected to be virtually eliminated. It is expected to take two to three years for full implementation. Assume that receiving cost is a step-fixed cost with steps of 1,500 orders. The other three activities employ resources that are acquired as used and needed. At the end of 20x2, the following results were reported for the four activities: Required: 1. Prepare a trend report that shows the non-value-added costs for each activity for 20x1 and 20x2 and the change in costs for the two periods. Discuss the reports implications. 2. Explain the role of activity reduction for receiving and for expediting. What is the expected value of SQ for each activity after JIT is fully implemented? 3. What if at the end of 20x2, the selling price of a competing product is reduced by 27 per unit? Assume that the firm produces and sells 20,000 units of its product and that its product is associated only with the four activities being considered. By virtue of the waste-reduction savings, can the competitors price reduction be matched without reducing the unit profit margin of the product that prevailed at the beginning of the year? If not, how much more waste reduction is needed to achieve this outcome? In this case, what price decision would you recommend?arrow_forward
- The cutting department of Legacy Production Company started 40,000 units of specialized chairs during the month of March. The department incurred $15,000 in direct material costs; 2,500 direct labor hours paid at $10 per hour; and manufacturing overhead applied at 150% of direct labor cost. Legacy Production Company uses process costing to accumulate costs. NOTE: There was no beginning inventory in March. Required (Excel Template downloadProvided): (Module Learning Outcomes LO5.1 through LO5.5 AND Course Learning Outcome #1 & #2) Calculate the conversion costs incurred during the month of March (show your calculations). Assume, that only 30,000 units were completed and transferred out. The remaining units left in ending inventroy are only 70% complete with respect to conversion costs. Direct materials are added at the beginning of the process. Prepare a Cutting Department cost production report for the month of March Refer to the cost production report in part b. What are…arrow_forwardCompute departmental overhead rates (Learning Objective 1)54-4Snyder Snacks makes potato chips, corn chips, and cheese puffs using three different pro- duction lines within the same manufacturing plant . Currently, Snyder uses a single plant- wide overhead rate to allocate its $3,311,500 of annual manufacturing overhead . Of this amount, $2,070,000 is associated with the potato chip line, $763,000 is associated with the corn chip line, and $478,500 is associated with the cheese puff line. Snyder's plant is currently running a total of 17,900 machine hours: 11,500 in the potato chip line, 3,500 in the corn chip line, and 2,900 in the cheese puff line. Snyder considers machine hours to be the cost driver of manufacturing overhead costs .1. What is Snyder's plantwide overhead rate?2. Calculate the departmental overhead rates for Snyder's three production lines. Roundall answers to the nearest cent .3. Which products have been overcosted by the plantwide rate? Which products havebeen…arrow_forwardE4-23A Use ABC to allocate manufacturing overhead (Learning Objective 2) Several years after reengineering its production process, Biltmore Corporation hired a new controller, Rachael Johnson. She developed an ABC system very similar to the one used by Biltmore’s chief rival, Westriver. Part of the reason Johnson developed the ABC system was because Biltmore’s profits had been declining even though the company had shifted its product mix toward the product that had appeared most profitable under the old system. Before adopting the new ABC system, Biltmore had used a plantwide overhead rate based on direct labor hours that was developed years ago. For the upcoming year, Biltmore’s budgeted ABC manufacturing overhead allocation rates are as follows: Activity Allocation Base Activity Cost Allocation Rate Materials handling # of parts $3.84 per part Machine setup # of setups $330.00 per setup Insertion of parts # of parts $30.00 per part Finishing Finishing DL hrs $54.00 per hour The…arrow_forward
- P10-53B Determine transfer price at a manufacturer under various scenarios (Learning Objective 4) Assume the Small Components Division of Lang Manufacturing produces a video card used in the assembly of a variety of electronic products. The division's manufacturing costs, and variable selling expenses related to the video card are as follows: Cost per unit Direct materials $ 14.00 Direct labor $ 4.00 Variable manufacturing overhead $ 8.00 Fixed manufacturing overhead (at current production level) $ 9.00 Variable selling expenses $ 10.00 The Computer Division of Lang Manufacturing can use the video card produced by the Small Components Division and is interested in purchasing the video card in-house rather than buying it from an outside supplier. The Small Components Division has sufficient excess capacity with which to make the extra video cards. Because of competition, the market price for this video card is $30 regardless of whether the…arrow_forwardNorthern Defense manufactures radar systems. It has just completed the manufacture of its first newly designed system, RS-32. Manufacturing data for the RS-32 follow: (Click icon to view data) Requirement Calculate the total variable costs of producing 2, 4, and 8 units. Begin by calculating the cumulative total time in labor-hours using the cumulative average-time learning model. (Round the cumulative average time per unit to the nearest whole number.) Cumulative number of Cumulative average time Cumulative total time: per unit: Labor-hours Labor-hours 3700 units 2 4 8 3700 ← Data table Direct material cost Direct manufacturing labor time for first unit Learning curve for manufacturing labor time per radar system Direct manufacturing labor cost Variable manufacturing overhead cost Using the formula for an 85% learning curve, b = In 0.85 In 2 Print = $ $ $ -0.162519 0.693147 81,000 per unit of RS-32 3,700 direct manufacturing labor-hours 85% cumulative average timeª Done 28 per direct…arrow_forwardAverage labor cost for the first 700 units of a product is RO 50 and the average labor cost of first 1400 units is RO 45. Average time per unit is 100 minutes. The learning ratio and the average labour cost for first 2800 units will be: a. 80% and RO 36.000 b. 90% and RO 40.500 c. 85% and RO 38.250 d. 95% and RO 42.750arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Cornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage LearningFinancial Accounting: The Impact on Decision Make...AccountingISBN:9781305654174Author:Gary A. Porter, Curtis L. NortonPublisher:Cengage Learning
Cornerstones of Cost Management (Cornerstones Ser...
Accounting
ISBN:9781305970663
Author:Don R. Hansen, Maryanne M. Mowen
Publisher:Cengage Learning
Financial Accounting: The Impact on Decision Make...
Accounting
ISBN:9781305654174
Author:Gary A. Porter, Curtis L. Norton
Publisher:Cengage Learning
Inspection and Quality control in Manufacturing. What is quality inspection?; Author: Educationleaves;https://www.youtube.com/watch?v=Ey4MqC7Kp7g;License: Standard youtube license