Concept explainers
1.
Concept Introduction:
Predetermined overhead allocation:
Manufacturing overhead cost is the pool of all indirect costs incurred for the production. These are the costs that are not directly traceable to the product.
To calculate: The predetermined overhead allocation rate.
2.
Concept Introduction:
Predetermined overhead allocation:
Manufacturing overhead cost is the pool of all indirect costs incurred for the production. These are the costs that are not directly traceable to the product. Manufacturing costs include indirect material indirect labor and overheads. These costs are allocated to the products using the predetermined overhead allocation rate. The formula of predetermined overhead allocation rate is as follows:
To calculate: The over or underapplied overhead.
3.
Concept Introduction:
Predetermined overhead allocation:
Manufacturing overhead cost is the pool of all indirect costs incurred for the production. These are the costs that are not directly traceable to the product. Manufacturing costs include indirect material indirect labor and overheads. These costs are allocated to the products using the predetermined overhead allocation rate. The formula of predetermined overhead allocation rate is as follows:
To explain: The reason for over or underapplied overhead.
Want to see the full answer?
Check out a sample textbook solutionChapter 4 Solutions
Managerial Accounting for Managers
- A company calculated the predetermined overhead based on an estimated overhead of $70.000, and the activity for the cost driver was estimated as 2,500 hours. If product A utilized 1,350 hours and product 8 utilized 1,100 hours, what was the total amount of overhead assigned to the products? A. $35000 B. $30.800 C. $37,800 D. $68,600arrow_forwardPREDETERMINED FACTORY OVERHEAD RATE Millerlile Enterprises calculates a predetermined factory overhead rate so that factory overhead may be applied to production during the month. It calculates the overhead using three different methods and then decides which one to use. Total estimated factory overhead costs are 540,000. Total estimated direct labor hours are 50,000. Total estimated direct labor costs are 900,000. Total machine hours are estimated to be 80,000. Calculate the predetermined overhead application rates based on (1) direct labor hours, (2) direct labor costs, and (3) machine hours.arrow_forwardPREDETERMINED FACTORY OVERHEAD RATE Marston Enterprises calculates a predetermined factory overhead rate so that factory overhead may be applied to production during the month. It calculates the overhead using three different methods and then decides which one to use. Total estimated factory overhead costs are 600,000. Total estimated direct labor hours are 30,000. Total estimated direct labor costs are 1,200,000. Total machine hours are estimated to be 200,000. Calculate the predetermined overhead application rates based on (1) direct labor hours, (2) direct labor costs, and (3) machine hours.arrow_forward
- Overhead application rate Creole Manufacturing Inc. uses a job order cost system and standard costs. It manufactures one product, whose standard cost follows: The standards are based on normal capacity of 2,400 direct labor hours. Actual activity for October follows: Required: 1. Compute the variable and fixed factory overhead rates per unit. 2. Compute the variable and fixed overhead rates per direct labor hour. 3. Determine the total fixed factory overhead based on normal capacity.arrow_forwardOverhead application rate Roll Tide Manufacturing Inc. uses a job order cost system and standard costs. It manufactures one product, whose standard cost follows: The standards are based on normal capacity of 2,700 direct labor hours. Actual activity for March follows: Required: 1. Compute the variable and fixed factory overhead rates per unit. 2. Compute the variable and fixed overhead rates per direct labor hour. 3. Determine the total fixed factory overhead based on normal capacity.arrow_forwardWhen setting its predetermined overhead application rate. Tasty Turtle estimated its overhead would be $75,000 and manufacturing would require 25,000 machine hours in the next year. At the end of the year, it found that actual overhead was $74,000 and manufacturing required 24,000 machine hours. Determine the predetermined overhead rate. What is the overhead applied during the year? Prepare the journal entry to eliminate the under- or over applied overhead.arrow_forward
- Applying factory overhead Bergan Company estimates that total factory overhead costs will be 620,000 for the year. Direct labor hours are estimated to be 80,000. For Bergan Company, (A) determine the predetermined factory overhead rate using direct labor hours as the activity base, (B) determine the amount of factory overhead applied to Jobs 200 and 305 in May using the data on direct labor hours from BE 16-2, and (C) prepare the journal entry to apply factory overhead to both jobs in May according to the predetermined overhead rate.arrow_forwardNutt Products manufactures screws and bolts made to customer specifications. During August, Nutt incurred the following manufacturing costs: direct materials, 28,019.00; direct labor, 15,276.75; and applied factory overhead, 9,854.50. The following data pertain to these costs: The overhead application rates are 4 per direct labor hour for Dept. 1 and 175% of direct labor cost for Dept. 2. Nutt had no beginning work in process for August. Job 8958, which cost 14,190.18 to manufacture, was completed in July and was sold on account in August for 19,000. The job cost sheet for this job is shown on page 103. Of the jobs begun in August, Job 8961 was completed and sold on account for 24,000, Jobs 8962 and 8964 were completed but not sold, and Job 8963 was still in process. As cost accountant for this company, you have been asked to prepare job cost sheets for each of the four jobs started in August. Review the printed worksheet called JOB that follows these requirements.arrow_forwardCoops Stoops estimated its annual overhead to be $85,000 and based its predetermined overhead rate on 24,286 direct labor hours. At the end of the year, actual overhead was $90,000 and the total direct labor hours were 24,100. What is the entry to dispose of the over applied or under applied overhead?arrow_forward
- Event Forms expects $120,000 in overhead during the next year. It doesn't know whether it should apply overhead on the basis of its anticipated direct labor hours of 6,000 or its expected machine hours of 5,000. What would be the product cost under each predetermined allocation rate if the last job incurred $3,500 in direct material cost, 55 direct labor hours, and 55 machine hours? Wages are paid at $17 per hour.arrow_forwardA new company started production. Job 10 was completed, and Job 20 remains in production. Here is the information from job cost sheets from their first and only jobs so far: Using the information provided. A. What is the balance in work in process? B. What Is the balance in the finished goods inventory? C. If manufacturing overhead is applied on the basis of direct labor hours, what is the predetermined overhead rate?arrow_forward(Appendix 4A) Journal Entries, Job Costs The following transactions occurred during the month of April for Nelson Company: a. Purchased materials costing 4,610 on account. b. Requisitioned materials totaling 4,800 for use in production, 3,170 for Job 518 and the remainder for Job 519. c. Recorded 65 hours of direct labor on Job 518 and 90 hours on Job 519 for the month. Direct laborers are paid at the rate of 14 per hour. d. Applied overhead using a plantwide rate of 6.20 per direct labor hour. e. Incurred and paid in cash actual overhead for the month of 973. f. Completed and transferred Job 518 to Finished Goods. g. Sold on account Job 517, which had been completed and transferred to Finished Goods in March, for cost (2,770) plus 25%. Required: 1. Prepare journal entries for Transactions a through e. 2. Prepare job-order cost sheets for Jobs 518 and 519. Prepare journal entries for Transactions f and g. (Note: Round to the nearest dollar.) 3. Prepare a schedule of cost of goods manufactured for April. Assume that the beginning balance in the raw materials account was 1,025 and that the beginning balance in the work-in-process account was zero.arrow_forward
- Principles of Accounting Volume 2AccountingISBN:9781947172609Author:OpenStaxPublisher:OpenStax CollegePrinciples of Cost AccountingAccountingISBN:9781305087408Author:Edward J. Vanderbeck, Maria R. MitchellPublisher:Cengage LearningManagerial AccountingAccountingISBN:9781337912020Author:Carl Warren, Ph.d. Cma William B. TaylerPublisher:South-Western College Pub
- College Accounting, Chapters 1-27AccountingISBN:9781337794756Author:HEINTZ, James A.Publisher:Cengage Learning,Managerial Accounting: The Cornerstone of Busines...AccountingISBN:9781337115773Author:Maryanne M. Mowen, Don R. Hansen, Dan L. HeitgerPublisher:Cengage LearningCollege Accounting, Chapters 1-27 (New in Account...AccountingISBN:9781305666160Author:James A. Heintz, Robert W. ParryPublisher:Cengage Learning