Chapter 4.1, Problem 35E
To determine
To find:
The number of units of each model that National should make each month to maximize its monthly profit and the largest monthly profit that the company can make.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Flint lab produces 4 high tech product types. Each of the products must be wired, drilled, assembled and checked for quality standard before being delivered to consumers. The time requirement and profit for each product are as follows. Product A: 0.5 hr for wiring, 3 hrs for drilling, 1 hr for assembling, and 0.5 hr for inspection. One product A can be sold for $10 per unit. Product B: 1.5 hr for wiring, 1 hrs for drilling, 3 hrs for assembling, and 1 hr for inspection. One product B can be sold for $13 per unit. Product C: 1.5 hr for wiring, 2 hrs for drilling, 3 hrs for assembling, and 0.5 hr for inspection. One product C can be sold for $16 per unit. Product D: 1 hr for wiring, 3 hrs for drilling, 2 hrs for assembling, and 0.5 hr for inspection. One product D can be sold for $12 per unit. The maximum capacity for wiring, drilling, assembly, and inspection are 1500 hrs; 2350 hrs; 2600 hrs; and 1200 hrs respectively. Flint lab requires that there will be at least 150 units of A, 100…
A toy factory creates miniature steel train engines and
box cars. The fabrication department has 5,279 minutes
available per week and the assembly and finishing
department has 5,999 minutes available per week.
Manufacturing one miniature steel train engine requires
12 minutes of fabrication and 10 minutes of assembling
and finishing. Manufacturing one miniature steel box car
requires 6 minutes of fabrication and 10 minutes of
assembling and finishing.
The profit on each miniature steel train engine is $9.50
and the profit on each miniature steel box car is $8.25.
How many steel train engines and steel box cars should
be produced each week to obtain the maximum profit?
Find the maximum weekly profit.
(Use x for box car and y for train engine.)
Maximize P =
≤5, 279
5,999
subject to
Enter the solution to the simplex matrix below. If there
is no solution enter 'DNE' in the boxes below. If more
than one solution exists, enter only one of the multiple
solutions below. If needed round toys to…
A Toot can be made in 30 minutes and has a feather attached to it. A Wheet requires 15 minutes, has two feathers, and is sprinkled with 0.5 oz of sequin powder. A Honk requires 30 minutes, has three feathers, and one oz. of sequin powder. The net profit is $0.40 per Toot, $0.50 per Wheet, and $0.80 per Honk. The following resources are available: 80 hrs of labor, 360 feathers, and 90 oz. of sequin powder. Determine the quantity of each type of noisemaker that maximizes profit.
Chapter 4 Solutions
EBK FINITE MATHEMATICS FOR THE MANAGERI
Ch. 4.1 - Give the three characteristics of a standard...Ch. 4.1 - a. When the initial simplex tableau is set up, how...Ch. 4.1 - In the simplex method, how is a pivoted column...Ch. 4.1 - In Exercises 1-6, a write the linear programming...Ch. 4.1 - In Exercises 1-6, a write the linear programming...Ch. 4.1 - In Exercises 1-6, a write the linear programming...Ch. 4.1 - In Exercises 1-6, a write the linear programming...Ch. 4.1 - In Exercises 1-6, a write the linear programming...Ch. 4.1 - Prob. 6ECh. 4.1 - In Exercises 7-16, determine whether the given...
Ch. 4.1 - In Exercises 7-16, determine whether the given...Ch. 4.1 - Prob. 9ECh. 4.1 - Prob. 10ECh. 4.1 - Prob. 11ECh. 4.1 - Prob. 12ECh. 4.1 - Prob. 13ECh. 4.1 - In Exercises 7-16, determine whether the given...Ch. 4.1 - Prob. 15ECh. 4.1 - Prob. 16ECh. 4.1 - Prob. 17ECh. 4.1 - Prob. 18ECh. 4.1 - In Exercise 17-31, solve each linear programming...Ch. 4.1 - Prob. 20ECh. 4.1 - In Exercise 17-31, solve each linear programming...Ch. 4.1 - In Exercise 17-31, solve each linear programming...Ch. 4.1 - In Exercise 17-31, solve each linear programming...Ch. 4.1 - Prob. 24ECh. 4.1 - Prob. 25ECh. 4.1 - In Exercise 17-31, solve each linear programming...Ch. 4.1 - Prob. 27ECh. 4.1 - Prob. 28ECh. 4.1 - Prob. 29ECh. 4.1 - Prob. 30ECh. 4.1 - Prob. 31ECh. 4.1 - Prob. 32ECh. 4.1 - Prob. 33ECh. 4.1 - PRODUCTION SCHEDULING A company manufactures two...Ch. 4.1 - Prob. 35ECh. 4.1 - PRODUCTION SCHEDULING Kane Manufacturing has a...Ch. 4.1 - ASSETALLOCATION Justin has decided to invest at...Ch. 4.1 - ASSET ALLOCATION A financier plans to invest up to...Ch. 4.1 - PRODUCTION SCHEDULING A division of the Winston...Ch. 4.1 - CROP PLANNING A farmer has 150 acres of land...Ch. 4.1 - PRODUCTION SCHEDULING A company manufactures...Ch. 4.1 - ASSET ALLOCATION Ashley has earmarked at most...Ch. 4.1 - PRODUCTION SCHEDULING Ace Novelty manufactures...Ch. 4.1 - OPTIMIZING ADVERTISING EXPOSURE As part of a...Ch. 4.1 - PRODUCTION SCHEDULING Custom Office Furniture is...Ch. 4.1 - OPTIMIZING PROFIT FOR PREFABRICATED HOUSING Boise...Ch. 4.1 - ASSET ALLOCATION Sharon has a total of 200,000 to...Ch. 4.1 - OPTIMIZING PROFIT FOR BLENDED JUICE DRINKS...Ch. 4.1 - OPTIMIZING PROFIT FOR COLD FORMULAS Beyer...Ch. 4.1 - ASSET ALLOCATION A financier plans to invest up to...Ch. 4.1 - Consider the linear programming problem Maximize...Ch. 4.1 - Prob. 52ECh. 4.1 - Prob. 53ECh. 4.1 - Prob. 54ECh. 4.1 - Prob. 55ECh. 4.1 - Solve the linear programming problems. Maximize...Ch. 4.1 - Prob. 2TECh. 4.1 - Prob. 3TECh. 4.1 - Prob. 4TECh. 4.2 - Suppose you are given the linear programming...Ch. 4.2 - Prob. 2CQCh. 4.2 - Prob. 3CQCh. 4.2 - Prob. 4CQCh. 4.2 - Prob. 1ECh. 4.2 - Prob. 2ECh. 4.2 - Prob. 3ECh. 4.2 - In Exercise 16, use the technique developed in...Ch. 4.2 - Prob. 5ECh. 4.2 - Prob. 6ECh. 4.2 - Prob. 7ECh. 4.2 - Prob. 8ECh. 4.2 - Prob. 9ECh. 4.2 - Prob. 10ECh. 4.2 - Prob. 11ECh. 4.2 - In Exercise 1120, construct the dual problem...Ch. 4.2 - Prob. 13ECh. 4.2 - In Exercise 1120, construct the dual problem...Ch. 4.2 - In Exercises 1120, construct the dual problem...Ch. 4.2 - Prob. 16ECh. 4.2 - Prob. 17ECh. 4.2 - In Exercises 1120, construct the dual problem...Ch. 4.2 - Prob. 19ECh. 4.2 - In Exercises 1120, construct the dual problem...Ch. 4.2 - MINIMIZING CRUISE LINE COSTS Deluxe River Cruises...Ch. 4.2 - FERTILIZER COSTSA farmer uses two types of...Ch. 4.2 - DIET PLANNING The owner of the Health Juice Bar...Ch. 4.2 - OPTIMIZING ADVERTISING EXPOSURE Everest Deluxe...Ch. 4.2 - MINIMIZING SHIPPING Cons Acrosonic manufactures a...Ch. 4.2 - MINIMIZING SHIPPING COSTS Steinwelt Piano...Ch. 4.2 - MINIMIZING OIL REFINERY COSTS An oil company...Ch. 4.2 - Prob. 28ECh. 4.2 - In Exercises 28 and 29, determine whether the...Ch. 4.2 - Prob. 1TECh. 4.2 - Prob. 2TECh. 4.2 - Prob. 3TECh. 4.2 - Prob. 4TECh. 4.3 - Explain why the following linear programming...Ch. 4.3 - Prob. 2CQCh. 4.3 - Prob. 3CQCh. 4.3 - Prob. 1ECh. 4.3 - Prob. 2ECh. 4.3 - Prob. 3ECh. 4.3 - Prob. 4ECh. 4.3 - Prob. 5ECh. 4.3 - Prob. 6ECh. 4.3 - Prob. 7ECh. 4.3 - Prob. 8ECh. 4.3 - Prob. 9ECh. 4.3 - Prob. 10ECh. 4.3 - Prob. 11ECh. 4.3 - Prob. 12ECh. 4.3 - Prob. 13ECh. 4.3 - In Exercises 520, use the method of this section...Ch. 4.3 - Prob. 15ECh. 4.3 - Prob. 16ECh. 4.3 - Prob. 17ECh. 4.3 - Prob. 18ECh. 4.3 - In Exercises 520, use the method of this section...Ch. 4.3 - Prob. 20ECh. 4.3 - MAXIMIZING INVESTMENT RETURNS Natsano has at most...Ch. 4.3 - Prob. 22ECh. 4.3 - Prob. 23ECh. 4.3 - CROP PLANNING A farmer has 150 acres of land...Ch. 4.3 - PRODUCTION SCHEDULING A company manufactures...Ch. 4.3 - PRODUCTION SCHEDULING Wayland Company manufactures...Ch. 4.3 - DIET PLANNING A nutritionist at the Medical Center...Ch. 4.3 - MINIMIZING SHIPPING COSTS Steinwelt Piano...Ch. 4.CRQ - Prob. 1CRQCh. 4.CRQ - Prob. 2CRQCh. 4.CRQ - Prob. 3CRQCh. 4.CRQ - Prob. 4CRQCh. 4.CRE - Prob. 1CRECh. 4.CRE - Prob. 2CRECh. 4.CRE - In Exercises 1-8, use the simplex method to solve...Ch. 4.CRE - Prob. 4CRECh. 4.CRE - Prob. 5CRECh. 4.CRE - Prob. 6CRECh. 4.CRE - Prob. 7CRECh. 4.CRE - Prob. 8CRECh. 4.CRE - Prob. 9CRECh. 4.CRE - Construct the dual problem associated with the...Ch. 4.CRE - Prob. 11CRECh. 4.CRE - Prob. 12CRECh. 4.CRE - Prob. 13CRECh. 4.CRE - Prob. 14CRECh. 4.CRE - Prob. 15CRECh. 4.CRE - Prob. 16CRECh. 4.CRE - Prob. 17CRECh. 4.CRE - Prob. 18CRECh. 4.CRE - MINIMIZING MINING COSTS Perth Mining Company...Ch. 4.CRE - MINIMIZING RIVER CRUISE COSTS Nordic River Cruises...Ch. 4.CRE - MINIMIZING CITY WATER COSTS The water-supply...Ch. 4.CRE - INVESTMENT ANALYSIS Jorge has decided to invest at...Ch. 4.CRE - MAXIMIZING PROFIT A company manufactures three...Ch. 4.CRE - INVESTMENT ANALYSIS Sandra has at most 200,000 to...Ch. 4.BMO - Prob. 1BMOCh. 4.BMO - Prob. 2BMOCh. 4.BMO - Prob. 3BMOCh. 4.BMO - Prob. 4BMOCh. 4.BMO - Using the simplex method, solve the following...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, subject and related others by exploring similar questions and additional content below.Similar questions
- If during the following year it is predicted that each comedy skit will generate 30 thousand and each musical number 20 thousand, find the maximum income for the year. A television program director must schedule comedy skits and musical numbers for prime-time variety shows. Each comedy skit requires 2 hours of rehearsal time, costs 3000, and brings in 20,000 from the shows sponsors. Each musical number requires 1 hour of rehearsal time, costs 6000, and generates 12,000. If 250 hours are available for rehearsal and 600,000 is budgeted for comedy and music, how many segments of each type should be produced to maximize income? Find the maximum income.arrow_forwardAt the Pizza Dude restaurant, a 12-in. pizza costs 5.40 to make, and the manager wants to make at least 4.80 from the sale of each pizza. If the pizza will be sold by the slice and each pizza is cut into 6 pieces, what is the minimum charge per slice?arrow_forwardSuppose the coal and steel industries form a closed economy. Every $1 produced by the coal industry requires $0.30 of coal and $0.70 of steel. Every $1 produced by steel requires $0.80 of coal and $0.20 of steel. Find the annual production (output) of coal and steel if the total annual production is $20 million.arrow_forward
- A publishing company sells 400,000 copies of a certain book each year. Ordering the entire amount printed at the beginning of the year ties up valuable storage space and capital. However, printing the copies in several partial runs throughout the year results in added costs for setting up each printing run, which costs $1000. The carrying costs, figured on the average number of books in storage, are $.50 per book. Find the most economical lot size, that is, the production run size that minimizes the total setting up andcarrying costs.arrow_forwardBill is trying to determine how many units of two types of telephones to produce each day. One of these is the standard, while the other is the deluxe. The profit per unit on the standard is $50, while the profit per unit on the deluxe is $60. Each model requires 30 minutes of assembly time. The standard requires 10 minutes of inspection time and the deluxe requires 15 minutes of inspection time. There are 450 minutes of assembly time and 180 minutes of inspection time available each day. How many of each product should be manufactured to maximize profits? Standard Phones (X1) Deluxe Phones (X2) Time Available Assembly 30 30 450 Inspection 10 15 180 Profit $50 $60 Which of the following graphs best describes the solution using the dataarrow_forwardBibbins Manufacturing produces softball and baseballs for youth recreation leagues. Each softball costs $11 to produce and sells for $17 while each baseball costs $10.50 and sells for $15. The material and labor required to produce each item is listed here along with the availability of each resource. Amount Required Per Amount Resource Softball Baseball Available Leather 5 oz 4 oz 6,000 oz Nylon 6 yds 3 yds 5,400 yds Core 4 oz 2 oz 4,000 oz Labor 2.5 min 2 min 3,500 min Stitching 1 min 1 min 1,500 min If X, = number of softballs to produce, X, = number of baseballs to produce, what is the objective function? МАХ 6 X, +4.5 X2 MIN 6X, + 4 X2 МАX 11 X, + 17 X2 МAX 2.5 X, + 6 X2arrow_forward
- Let's say there are two sectors of an economy, firms and households. Each household supplies labor to the firms. Households earn $100 per month, they spend $1 per mile to commute to work and they spend $50 on all other goods. Firms produce 1 ton of goods and earn $100 per month net profits on production, but must pay $10 per ton mile to ship its output to the port. All firms, residents use 1 acre of land. Calculate each sector's bid rent function. That is, what is each sector's ability to pay for a location as a function of distance to the center? How far from the center will land use change from business use to residential? Draw a graph of the sector's bid rent function as a function of distance from the center. Be sure to label the graph and describe the location of each sector.arrow_forwardA publishing company sells 625,000 copies of certain books each year. It costs the company $1 to store each book for a year. Each time it must print additional copies, it costs the company $500 to set up the presses. How many books should the company produce during each printing in order to minimize its total storage and setup costs? The company should produce books each printing in order to minimize costs.arrow_forwardKane Manufacturing has a division that produces x model A grates and y model B grates. To produce each model A grate requires 3 lb of cast iron and 6 min of labor. To produce each model B grate requires 4 Ib of cast iron and 3 min of labor. The profit for each model A grate is $2.50, and the profit for each model B grate is $3.50. Available for grate production each day are 1000 lb of cast iron and 20 labor-hours. Because of a backlog of orders for model B grates, Kane's manager has decided to produce at least 180 model B grates per day. How many grates of each model should Kane produce to maximize its profits? (х, у) What is the optimal profit? $arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Linear Algebra: A Modern IntroductionAlgebraISBN:9781285463247Author:David PoolePublisher:Cengage LearningCollege Algebra (MindTap Course List)AlgebraISBN:9781305652231Author:R. David Gustafson, Jeff HughesPublisher:Cengage LearningElementary Geometry For College Students, 7eGeometryISBN:9781337614085Author:Alexander, Daniel C.; Koeberlein, Geralyn M.Publisher:Cengage,
- Trigonometry (MindTap Course List)TrigonometryISBN:9781337278461Author:Ron LarsonPublisher:Cengage Learning
Linear Algebra: A Modern Introduction
Algebra
ISBN:9781285463247
Author:David Poole
Publisher:Cengage Learning
College Algebra (MindTap Course List)
Algebra
ISBN:9781305652231
Author:R. David Gustafson, Jeff Hughes
Publisher:Cengage Learning
Elementary Geometry For College Students, 7e
Geometry
ISBN:9781337614085
Author:Alexander, Daniel C.; Koeberlein, Geralyn M.
Publisher:Cengage,
Trigonometry (MindTap Course List)
Trigonometry
ISBN:9781337278461
Author:Ron Larson
Publisher:Cengage Learning
Solve ANY Optimization Problem in 5 Steps w/ Examples. What are they and How do you solve them?; Author: Ace Tutors;https://www.youtube.com/watch?v=BfOSKc_sncg;License: Standard YouTube License, CC-BY
Types of solution in LPP|Basic|Multiple solution|Unbounded|Infeasible|GTU|Special case of LP problem; Author: Mechanical Engineering Management;https://www.youtube.com/watch?v=F-D2WICq8Sk;License: Standard YouTube License, CC-BY
Optimization Problems in Calculus; Author: Professor Dave Explains;https://www.youtube.com/watch?v=q1U6AmIa_uQ;License: Standard YouTube License, CC-BY
Introduction to Optimization; Author: Math with Dr. Claire;https://www.youtube.com/watch?v=YLzgYm2tN8E;License: Standard YouTube License, CC-BY