EBK OPERATIONS MANAGEMENT
14th Edition
ISBN: 9781260718447
Author: Stevenson
Publisher: MCG COURSE
expand_more
expand_more
format_list_bulleted
Textbook Question
Chapter 4.S, Problem 12P
An electronic chess game has a useful life that is exponential with a mean of 30 month. Determine each of the following:
a. The probability that any given unit will operate for at least (1) 39 months. (2) 48 men the (3) 60 months.
b. The probability that any given unit will fail sooner than (1) 33 months. (2) 15 months. (3) 6 months.
c. The length of service tune after which the percentage of tilled units will approximately equal (1) 50 percent, (2) 85 percent, (3) 95 percent, (4) 99 percent.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
An electronic chess has a useful life that is exponential with a mean of 30 months. Determine each of the following:
a) The probability that any given unit will operate at least 45 months
b) The probability that any given unit will fail sooner than 30 months
An online news platform is hosting sports news on a local webserver. Assuming the webserver is valued at $10,000. This webserver crashed 7 times in one year and in every crash, it resulted in a 3% loss. Calculate the expected losses using single loss expectancy (SLE) and annualize Loss expectancy (ALE)
A local cab company maintains a fleet of 10 cabs. Each time a cab breaks down, it isrepaired the same day. Assume that breakdowns of individual cabs occur completely atrandom at a rate of two per year.d. What is the probability that there are more than five breakdowns between Thanksgiving Day (November 28) and New Year’s Day (January 1)?
Chapter 4 Solutions
EBK OPERATIONS MANAGEMENT
Ch. 4.2 - Prob. 1.1RQCh. 4.2 - Prob. 1.2RQCh. 4.5 - Prob. 1.1RQCh. 4.5 - Prob. 1.2RQCh. 4.7 - Prob. 1.1RQCh. 4.7 - Prob. 1.2RQCh. 4.7 - Prob. 1.3RQCh. 4.8 - Prob. 1.1RQCh. 4.8 - Prob. 1.2RQCh. 4.11 - THE CHALLENGES OF MANAGING SERVICES Services can...
Ch. 4.11 - THE CHALLENGES OF MANAGING SERVICES Services can...Ch. 4.S - Prob. 1DRQCh. 4.S - Prob. 2DRQCh. 4.S - Prob. 3DRQCh. 4.S - Consider the following system: Determine the...Ch. 4.S - A product is composed of four parts. In order for...Ch. 4.S - A system consists of three identical components....Ch. 4.S - A product engineer has developed the following...Ch. 4.S - The guidance system of a ship is controlled by a...Ch. 4.S - One of the industrial robots designed by a leading...Ch. 4.S - A production line has three machines A, B, and C,...Ch. 4.S - Prob. 8PCh. 4.S - A Web server has five major components that must...Ch. 4.S - Repeat Problem 9 under the condition that one of...Ch. 4.S - Hoping to increase the chances of reaching a...Ch. 4.S - An electronic chess game has a useful life that is...Ch. 4.S - A manufacturer of programmable calculators is...Ch. 4.S - Lucky Lumen light bulbs have an expected life that...Ch. 4.S - Prob. 15PCh. 4.S - Prob. 16PCh. 4.S - Determine the availability for each of these...Ch. 4.S - Prob. 20PCh. 4.S - A manager must decide between two machines. The...Ch. 4.S - Prob. 22PCh. 4.S - Auto batteries have an average life of 2.7 years....Ch. 4 - Prob. 1DRQCh. 4 - Prob. 2DRQCh. 4 - Prob. 3DRQCh. 4 - Prob. 4DRQCh. 4 - Prob. 5DRQCh. 4 - Prob. 6DRQCh. 4 - Prob. 7DRQCh. 4 - Prob. 8DRQCh. 4 - a. What is meant by the term life cycle? b. Why...Ch. 4 - Prob. 10DRQCh. 4 - Prob. 11DRQCh. 4 - Prob. 12DRQCh. 4 - Prob. 13DRQCh. 4 - Explain what quality function development is and...Ch. 4 - Prob. 15DRQCh. 4 - Prob. 16DRQCh. 4 - Prob. 17DRQCh. 4 - Prob. 18DRQCh. 4 - Prob. 19DRQCh. 4 - Describe some of the trade-off that are...Ch. 4 - Prob. 2TSCh. 4 - Prob. 3TSCh. 4 - Prob. 1CTECh. 4 - Prob. 2CTECh. 4 - Prob. 3CTECh. 4 - Prob. 4CTECh. 4 - Prob. 5CTECh. 4 - Give two examples of unethical conduct involving...Ch. 4 - Prob. 1PCh. 4 - Prob. 2PCh. 4 - Prepare a service blueprint for each of these...Ch. 4 - Prepare a service blueprint for each of these post...Ch. 4 - Prob. 5PCh. 4 - Prob. 6PCh. 4 - Prob. 7PCh. 4 - Prepare a table similar to that shown in Problem...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- A local cab company maintains a fleet of 10 cabs. Each time a cab breaks down, it isrepaired the same day. Assume that breakdowns of individual cabs occur completely atrandom at a rate of two per year.d. What is the probability that there are more than five breakdowns between Thanksgiving Day (November 28) and New Year’s Day (January 1)?e. For what reason might your answer in part (d) be too low?arrow_forwardA weather satellite has an expected life of 10 years from the time it is placed into earth orbit. Determine its probability of no wear-out before each of the following lengths of service. Assume theexponential distribution is appropriate.a. 5 years b. 12 years c. 20 years d. 30 yearsarrow_forwardThe assumption that a system will operate in a stable environment without risk is not realistic (Sales et al., 2018). Risk is widely classified into disruption and operational risks (Kleindorfer & Saad, 2005; Tang, 2006). Extreme uncertainty and the absence of synchronization between supply and demand are linked to operational risks while circumstances such as labor strikes, terrorist attacks, and natural calamities are related to disruption risks (Lockamy & McCormack, 2010). The probability of human injury or even death is high in disruptions such as multi-casualty disasters which brings about the challenge of increased pressure on healthcare. Healthcare institutions are required to become capable of understanding and adapting to environmental changes to mitigate such unexpected changes. These unexpected changes can affect the competitiveness, responsiveness and operating procedures of a firm significantly (Huang, Yen, & Liu, 2014), and for healthcare institutions, the…arrow_forward
- A product engineer has developed the following equation for the cost of a system component: C = (10P) 2, where C is the cost in dollars and P is the probability that the component will operate as expected. The system is composed of two identical components, both of which must operate forthe system to operate. The engineer can spend $173 for the two components. To the nearest two decimal places, what is the largest component probability that can be achieved?arrow_forwardThe mean repair time of a reproduction machine every time it becomes defective is 5 hours, and is assumed to be available 95% of the time. What is its mean time between failure (MTBF)?arrow_forwardThe annual maintenance costs of a machine that has been in use for 3 years are 300 TL, 350 TL and 375 TL, respectively. The machine is expected to be available for 8 years after purchase. The maintenance costs foreseen for the coming years are 400 TL in the first year and 150 TL in the following years. If the machine is sold today, it can be sold for 1500 TL, and in the following years for 1000 TL. What is the optimum regeneration time of the machine if the MCVO is 10%?arrow_forward
- A local cab company maintains a fleet of 10 cabs. Each time a cab breaks down, it isrepaired the same day. Assume that breakdowns of individual cabs occur completely atrandom at a rate of two per year.a. What is the probability that any particular cab will run for a full year withoutsuffering a breakdown?arrow_forwardA product engineer has developed the following equation for the cost of a system component: C = (10P)2, where C is the cost in dollars and P is the probability that the component will operate as expected. The system is composed of 3 identical components, all of which must operate for the system to operate. The engineer can spend $254 for the 3 components. What is the largest component probability that can be achieved? (Do not round your intermediate calculations. Round your final answer to 4 decimal places.) Probability 0.8466arrow_forwardThe school of business has 3 fax machines. The toner in each machine needs to be changed after about 5 hours of use. There is one unit secretary who is responsible for the fax machine maintenance. It takes him 15 minutes to replace the toner cartridge. What is the probability the system is empty?arrow_forward
- A company owns a 5-year-old turret lathe that has a book value of $23,000. The present market value for the lathe is $18,000. The expected decline in market value is $1,700/year to a minimum market value of $4,080; maintenance plus operating costs for the lathe equal $4,470/year.A new turret lathe can be purchased for $46,000 and will have an expected life of 8 years. The market value for the turret lathe is expected to equal $46,000(0.70)k at the end of year k. Annual maintenance and operating cost is expected to equal $1,900. Based on a 12% MARR, should the old lathe be replaced now? Use an equivalent uniform annual cost comparison, a planning horizon of 7 years, and the cash flow approach.EUAC for keeping old turret lathe: $EUAC for replacing turret lathe: $arrow_forwarda buliding owned by hopewell company was recently valued at 850,00 by a real estate expert , the president of the company is questioning the accuracy of the firms latest balance sheet becuase it shows a book value of 550,000 for the building ,how would you explain a situation to the president.arrow_forwardAt the beginning of each week, a machine is in one of four conditions: 1 = excellent; 2 = good; 3 = average; 4 = bad. The weekly revenue earned by a machine in state 1, 2, 3, or 4 is 100, 90, 50, or 10, respectively. After observing the condition of the machine at the beginning of the week, the company has the option, for a cost of 200, of instantaneously replacing the machine with an excellent machine. The quality of the machine deteriorates over time, as shown in the file P10 41.xlsx. Four maintenance policies are under consideration: Policy 1: Never replace a machine. Policy 2: Immediately replace a bad machine. Policy 3: Immediately replace a bad or average machine. Policy 4: Immediately replace a bad, average, or good machine. Simulate each of these policies for 50 weeks (using at least 250 iterations each) to determine the policy that maximizes expected weekly profit. Assume that the machine at the beginning of week 1 is excellent.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Process selection and facility layout; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=wjxS79880MM;License: Standard YouTube License, CC-BY