The following diagram shows a four-step process that begins with Operation 1 and ends with Operation 4. The rates shown in each box represent the effective capacity of that operation.
a. Determine the capacity of this process.
b. Which action would yield the greatest increase in process capacity. (1) increase the capacity of Operation 1 by 15 percent, (2) increase the capacity of Operation 2 by 10 percent; or (3) increase the capacity of Operation 3 by 10 percent?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
2-The process of making hotdogs involves six activities: “grind”, “mix”, “stuff”, “cook”, “peel”, and “inspect”. If the capacity of activity “cook” determines the process capacity, which of the following statements are true?
a- Activity “cook” is a bottleneck activity.
b- The activity time of all the other five activities is shorter than activity "cook".
c- Cycle time of the process of making hotdogs is equal=1/capacity of activity “cook”.
d- Increasing the capacity of activity “grind” can increase the capacity of the process of making hotdogs.
All statements are correct
Only statement 'b' is correct
Only statements 'a' and 'b' are correct
Only statements 'a', 'b' and 'c' are correct
Only statement 'a' is correct
Only statement 'd' is correct
In a job shop, effective capacity is only 88 percent of design capacity, and actual output is 69 percent of effective output. What design capacity would be needed to achieve an actual output of 11 jobs per week? What is its effective capacity?a. The Design Capacity needed to achieve the required actual job outputs =( ) (round to whole number)b. The Effective Capacity needed to achieve the required actual job outputs =( ) (round to whole number)
A small firm intends to increase the capacity of a bottleneck operation for producing a product by adding a new machine. Two alternatives, A and B, have been identified and the associated costs and revenues have been estimated. Annual fixed costs would be $30000 for A and $25,000 for B; variable costs per unit would be $10 for A and $12 for B; and the revenue per unit would be $25.
i. Find the total cost functions for alternatives A and B, and the revenue function
ii. Draw both the total cost functions and the revenue function in the same figure.
iii. Find the break-even point for the alternatives A and B and show it in the figure iv. Is there any volume of output at which both the alternatives yield the same profit? If so, show it in the figure. If not, identify the volume of output at which the alternatives are indifferent
Chapter 5 Solutions
OPERATIONS MANAGEMENT W/ CNCT+
Ch. 5.8 - Explain the meaning of the phrase Hours versus...Ch. 5.8 - Prob. 1.2RQCh. 5.8 - Prob. 1.3RQCh. 5.8 - Prob. 1.4RQCh. 5.8 - Prob. 1.5RQCh. 5.S - Prob. 1DRQCh. 5.S - Prob. 2DRQCh. 5.S - Explain the term bounded rationality.Ch. 5.S - Prob. 4DRQCh. 5.S - Prob. 5DRQ
Ch. 5.S - What information is contained in a payoff table?Ch. 5.S - Prob. 7DRQCh. 5.S - Prob. 8DRQCh. 5.S - Under what circumstances is expected monetary...Ch. 5.S - Explain or define each of these terms: a. Laplace...Ch. 5.S - Prob. 11DRQCh. 5.S - Prob. 12DRQCh. 5.S - Prob. 13DRQCh. 5.S - Prob. 1PCh. 5.S - Refer to problem1. Suppose after a certain amount...Ch. 5.S - Refer to Problems 1 and 2 Construct a graph that...Ch. 5.S - Prob. 4PCh. 5.S - Prob. 5PCh. 5.S - The lease of Theme Park, Inc., is about to expire....Ch. 5.S - Prob. 7PCh. 5.S - Prob. 8PCh. 5.S - Prob. 9PCh. 5.S - A manager must decide how many machines of a...Ch. 5.S - Prob. 11PCh. 5.S - Prob. 12PCh. 5.S - Prob. 13PCh. 5.S - Prob. 14PCh. 5.S - Give this payoff table: a. Determine the range of...Ch. 5.S - Prob. 16PCh. 5.S - Repeat all parts of problem 16, assuming the value...Ch. 5.S - Prob. 18PCh. 5 - Prob. 1DRQCh. 5 - Prob. 2DRQCh. 5 - How do long-term and short-term capacity...Ch. 5 - Give an example of a good and a service that...Ch. 5 - Give some example of building flexibility into...Ch. 5 - Why is it important to adopt a big-picture...Ch. 5 - What is meant by capacity in chunks, and why is...Ch. 5 - Prob. 8DRQCh. 5 - How can a systems approach to capacity planning be...Ch. 5 - Prob. 10DRQCh. 5 - Why is it important to match process capabilities...Ch. 5 - Briefly discuss how uncertainty affects capacity...Ch. 5 - Prob. 13DRQCh. 5 - Prob. 14DRQCh. 5 - Prob. 15DRQCh. 5 - Prob. 16DRQCh. 5 - What is the benefit to a business organization of...Ch. 5 - Prob. 1TSCh. 5 - Prob. 2TSCh. 5 - Prob. 3TSCh. 5 - Prob. 1CTECh. 5 - Prob. 2CTECh. 5 - Identify four potential unethical actions or...Ch. 5 - Any increase in efficiency also increases...Ch. 5 - Prob. 1PCh. 5 - In a job shop, effective capacity is only 50...Ch. 5 - A producer of pottery is considering the addition...Ch. 5 - A small firm intends to increase the capacity of a...Ch. 5 - A producer of felt-tip pens has received a...Ch. 5 - A real estate agent is considering changing her...Ch. 5 - A firm plans to begin production of a new small...Ch. 5 - A manager is trying to decide whether to purchase...Ch. 5 - A company manufactures a product using two machine...Ch. 5 - A company must decide which type of machine to...Ch. 5 - Prob. 11PCh. 5 - A manager must decide how many machines of a...Ch. 5 - Prob. 13PCh. 5 - The following diagram shows a four-step process...Ch. 5 - Prob. 15PCh. 5 - Prob. 16PCh. 5 - Prob. 17PCh. 5 - Prob. 18PCh. 5 - A new machine will cost 18,000, butt result it...Ch. 5 - Remodelling an office will cost 25,000 and will...Ch. 5 - Prob. 1CQCh. 5 - Prob. 2CQCh. 5 - Prob. 3CQ
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- A production process consists of a three-step operation. The scrap rate is 10 percent for the firststep and 6 percent for the other two steps.a. If the desired daily output is 450 units, how many units must be started to allow for loss due toscrap?b. If the scrap rate for each step could be cut in half, how many units would this save in terms ofthe scrap allowance?c. If the scrap represents a cost of $10 per unit, how much is it costing the company per day forthe original scrap rate?arrow_forwardGiven the following diagram, a. What is the capacity of this system? b. If the capacity of one operation could be increased in order to increase the output of the system, which operation should it be, and what amount of increase?arrow_forwardThe following table shows the processes that compose the production line for the manufacture of canned food. The line operates (8) Hours a day, with the aim of producing (2,400) boxes per day. 1- Draw a diagram of the sequence of production line operations. 2- Calculate the theoretical minimum number of work stations. 3- Calculate the equilibrium efficiency of the line and the ratio Idle time for each station. 4- Distribute operations to workstations. Standard time process (Per second) the previous process A 3 ــــــــ B 5 A C 7 ــــــــ D 4 C E 6 B,D F 3 E G 9 E H 4 E I 5 G J 6 F,I.H K 4 J ∑arrow_forward
- The following processes - Tameka, Tamia, and Christian - have the following cost structure: Show all work in Excel with formulas Process Fixed Cost per Year Variable Cost per Unit Tameka $120,000 $3.00 Tamia 90,000 4.00 Christian 80,000 4.50 a. What is the most economical process for a volume of 8,000 units? b. How many units per year must be sold with each process to have annual profits of $50,000 if the selling price is $6.95 per unit? c. What is the break-even volume for each process?arrow_forwardBlue Oil Industries, LLC, a really small oil company, produces, a product that passes through three processes: Mixing, Refining, and Finishing. The following information was obtained for the Mixing department, the first department in the production process, for April 2017: a. Work in process, April 1, had 10,000 units and the following costs: Direct material: $28,000 Conversion: $60,000 b. During the month of April, 44,000 units were completed and transferred to the Refining Department. The following costs were added to production: Direct material: $68,000 Conversion: $75,000 c. On April 30, there were 4,000 partially completed units in process. These units were 100% complete with respect to Direct Materials and 25% complete with respect to Conversion. Required: Use the Weight Average Method to answer the following three questions: 1. What is the cost per equivalent whole unit for the month of April? 2. What is the cost of Ending Work in Process at the end of April? 3. How much cost is…arrow_forward(a) What is the cycle time necessary to achieve the desired rate of production?(b) Using the longest element rule, create workstations to balance the line,attempting to get as close as possible to the theoretical minimum numberof workstations.(c) What is the efficiency and idle time of the line balance?(d) The company considers that if the lamps are successful with the publicit may need to increase production to 30,000 units. The company thinksthe simplest solution is to obtain two more production lines, thus havingtriple capacity. Another option is to re-balance the line. Considering thata single worker is assigned to a work station, determine which option(more production lines or re-balancing) yields the smallest labour size.arrow_forward
- A production process at Kenneth Day Manufacturing is shown in Figure S7.9. The drilling operation occurs separately from, and simultaneously with, sawing and sanding, which are independent and sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel).a) Which operation is the bottleneck?b) What is the bottleneck time?c) What is the throughput time of the overall system?d) If the firm operates 8 hours per day, 20 days per month, whatis the monthly capacity of the manufacturing process?arrow_forward2. Jamila wants to set up a manufacturing unit, so she meets with Rashid, a humanresource manager at her company. Rashid explains that in order to decide on thehuman resource needs for the unit, they should conduct a workflow analysis. Shesuggests they start by defining the outputs of the process. To do this, what shouldJamila define?A) the processes that will be involved in manufacturingB) the number of people required for productionC) the type of products that will need to be manufacturedD) the special equipment, facilities, and systems needed for productionE) the data and information needed by the work unitarrow_forwardA computer factory in Tangerang plans to increase production line for new products and plan to produce as many as XX0 units per hour. Production process, production time and production process to continue the next production process are described in the table below: (1 day = 8 working hours) production process production time Production process that follows the next production according to the list below A 12 - B 15 A C 8 A D 5 B,C E 20 D a. What is the cycle time for the production of the new product? ( note : in second )b. What is the minimum number of workstations?c. Draw a diagram of the production process.d. Is it with the diagram that you have drawn, the production process can go according to plan? Describe the process from each workstation you've created!arrow_forward
- Bill’s Car Wash offers two types of washes: Standard and Deluxe. The process flow for both typesof customers is shown in Figure 5.7. Both wash types are first processed through steps A1 and A2.The Standard wash then goes through steps A3 and A4 while the Deluxe is processed through steps A5,A6, and A7. Both offerings finish at the drying station (A8). The numbers in parentheses indicate theminutes it takes for that activity to process a customer a. Which step is the bottleneck for the Standard car wash process? For the Deluxe car wash process?b. What is the capacity (measured as customers served per hour) of Bill’s Car Wash to processStandard and Deluxe customers? Assume that no customers are waiting at step A1, A2, or A8.c. If 60 percent of the customers are Standard and 40 percent are Deluxe, what is the average capacityof the car wash in customers per hour?d. Where would you expect Standard wash customers to experience waiting lines, assuming that newcustomers are always entering…arrow_forwardA TV factory plans to add production lines for its new product and plans to produce as many as 200 units per hour. The production process, production time, and the production process to continue the next production process are described in the table below: (1 day = 8 working hours) Production Process Production Time (s) The production process that follows the next production according to the list below A 12 - B 15 A C 8 A D 5 B,C E 20 D Based on the data above. a. Draw a diagram of the production process.b. With the diagram that you have described above, can the production process run properly according to the plan? Explain the process of each workstation that you have created!.arrow_forwardA TV factory plans to add production lines for its new product and plans to produce as many as 200 units per hour. The production process, production time, and the production process to continue the next production process are described in the table below: (1 day = 8 working hours) Production Process Production Time (s) The production process that follows the next production according to the list below A 12 - B 15 A C 8 A D 5 B,C E 20 D Based on the data above. a. What is the cycle time for the production of the new product? (note: in seconds)b. What is the minimum number of workstations?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY